| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/12/2022 | RESUBMITTAL - TI ALL | 03/18/2022 | COMPLETED |
| 04/01/2022 | RESUBMITTAL | 05/13/2022 | COMPLETED |
| 05/13/2022 | RESUBMITTAL | 06/28/2022 | COMPLETED |
| 12/12/2021 | COMMERCIAL - NEW | 02/02/2022 | COMPLETED |
| 12/12/2022 | COMMERCIAL REVIEW - FULL v.1 | 01/23/2023 | APPROVED |
| 05/13/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/19/2026 | APPROVED |
| 04/24/2023 | COMMERCIAL REVIEW - FULL v.1 | 05/18/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T21CM09453
Permit Status: Issued
Permit Description: New Apartment Building with Underground Parking
Total Outstanding Activity Conditions - 13
| Date | Name |
|---|---|
| 01/23/2023 | Prior to final verify impact fees have been addressed. |
| 06/28/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 06/28/2022 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. |
| 06/28/2022 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 06/28/2022 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
| 06/28/2022 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
| 06/28/2022 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 06/28/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 06/28/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 06/28/2022 | SHOP DRAWINGS REQUIRED FOR TRUSSES |
| 06/28/2022 | SHOP DRAWINGS REQUIRED FOR SPRINKLER SYSTEM. |
| 06/28/2022 | SHOP DRAWINGS REQUIRED FOR RADIO COVERAGE SYSTEM. |
| 10/05/2022 | ISSUED WITH PCRWRD & PDEQ CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWER G-2022-047/#P22WI00020 IS ACCEPTED AND RELEASED BY PCRWRDNO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE TWO PUBLIC SEWER MANHOLE TAP PERMITS TO IMS ID: 2011-010-05 ARE ACCEPTED AND RELEASED BY PCRWRD. NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PRIVATE SEWER #P22SD0074 IS ISSUED A DISCHARGE AUTHORIZATION BY PDEQ |
Conditions
Permit Number - T21CM09453
Permit Status: Issued
Permit Description: New Apartment Building with Underground Parking
| Date | Description | Comments |
|---|---|---|
| 10/05/2022 | NEED WASTE WATER RECEIPT |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM09453
Permite Description: New Apartment Building with Underground Parking
Total Outstanding Inspections - 30
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2022 | COT - FCON - Fire - Final | N/A | Re-inspection required | {Activity date: 05/11/2022; Status: Prior to Final Inspectn; Inspector: JPEEL-DAVIS; Comment: Entered by JPEELDA1 - Initial permit fees include 10 hours of inspections} |
| 07/06/2023 | COT - HCBU - Preslab | N/A | Partial Pass | This inspection is for excavation/layout rebar for concrete column footings at HL: H/11 (F2), I/11 (F2), J/11 (F4). Ok to place concrete in progress areas. |
| 01/31/2025 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | East pool/retaining CMU wall at 4’ - 8’. Ok to place grout in progress areas. |
| 05/27/2025 | COT - HCPL - Plumbing Roof Drains | N/A | Partial Pass | Roof drains #1, 2, 3, 5: under hydro test. |
| 10/10/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | SES conduit lines (4”): 15 lines on North side of building, and 15 lines on South side of building. Ensure that marking tape is in place before,covering progress atres. |
| 01/07/2026 | COT - BULD - SWG Clearance | N/A | Not Ready | |
| 10/16/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Large planters in central courtyard: concrete placed as per plans. |
| 05/04/2026 | COT - HCBU - TCO | N/A | Not Ready | |
| 12/23/2024 | COT - HCPL - Gas Pressure Test | N/A | Partial Pass | Gas lines pressure tested at 15 psi. Not ready for a meter set at this time |
| 05/15/2025 | COT - HCBU - Roof Nailing | N/A | Partial Pass | 5/15/25: roof at bridge per plans ok to proceed with crickets]. |
| 12/13/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | Level #2, Area B, Room units; S243, S244, S245, S249, S250, S251, S252, S253, S254, S255. |
| 07/22/2026 | COT - HCPL - Plumbing Progress | N/A | Not Ready | |
| 07/22/2026 | COT - HCME - Mechanical Progress | N/A | Not Ready | |
| 08/05/2025 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | Strapping at Levels 3 - 5 courtyard in section D. |
| 10/30/2025 | COT - HCBU - Framing | N/A | Partial Pass | 10/30/25: Commercial units # 166; 165; 164; 163; 162; 161 c-channels installed ok to proceed. |
| 07/02/2026 | COT - HCME - Mechanical Intermediate | N/A | Not Ready | |
| 07/02/2026 | COT - HCPL - Plumbing Intermediate | N/A | Not Ready | |
| 07/02/2026 | COT - HCEL - Electrical Intermediate | N/A | Not Ready | |
| 06/04/2026 | BULD - Electrical Clearance | N/A | Partial Pass | 6/4/2026 Partial pass. Clearance for TEP ECO. 1133,1135,1138,1139,1153,1155,1156,1158. |
| 07/22/2026 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | |
| 06/22/2026 | COT - HCEL - Electrical Progress | N/A | Canceled | 6-22-26: canceled. |
| 02/23/2026 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | Commercial suites at North Building. Ok to set ceiling,tiles. |
| 02/23/2026 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | Commercial suites at North Building; Ok to set ceiling tiles. |
| 02/23/2026 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | Commercial suites at North Building. Ok to set ceiling tiles. |
| 09/25/2025 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | Level #5, Section A: Room units 531 - 568. Ok to sheet rock ceiling areas. South exterior of building at Levels 1 - 5; exterior sheathing, Ok to cover progress areas. |
| 10/29/2026 | COT - HCBU - Building Final | N/A | Not Ready | Provide printed panel schedules for all suites. Buried receptacle in unit 1175. North east corner. Provide an air and balance report for all suites. Provide constant hot on emergency lighting suite 1174. Provide correct egress signs. |
| 02/23/2026 | COT - HCPL - Plumbing Final | N/A | Partial Pass | Commercial suites at North,Building. Ok to set ceiling tiles. |
| 10/29/2026 | COT - HCME - Mechanical Final | N/A | Not Ready | Provide printed panel schedules for all suites. Buried receptacle in unit 1175. North east corner. Provide an air and balance report for all suites. Provide constant hot on emergency lighting suite 1174. Provide correct egress signs. |
| 09/25/2026 | COT - HCEL - Electrical Final | N/A | Not Ready | |
| 06/22/2026 | COT - HCBU - Building Progress | N/A | Partial Pass | 6-22-26: partial pass- rc- channel verified at unit's 301, 302, 303, 326, 325, 327, 328. Okay to continue with construction at progress areas. |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM09453
Permit Description: New Apartment Building with Underground Parking
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2024 | COT - HCPL - Rough Soil | Passed | ||
| 06/17/2024 | COT - HCPL - Sewer | Passed | ||
| 01/20/2026 | COT - BULD - SWG Clearance | Passed | Ok to set commercial meters (2) for apartment complex. | |
| 05/04/2026 | PDSD Building Division SIte Consultation | Passed | ||
| 05/04/2026 | COT - HCPL - Gas Pressure Test | Passed | ||
| 05/04/2026 | COT - HCBU - Roof Nailing | Passed | ||
| 09/25/2026 | BULD - Electrical Clearance | Passed |