Permit Details

Status:
Issued
Type:
Commercial Building
Address:
165 S LINDA AV
Address NEW:
165 S LINDA AV
Apply Date:
12/12/2021
Applicant:
Description:
New Apartment Building with Underground Parking

Permit Reviews

Permit Number - T21CM09453
Permit Status: Issued
Permit Description: New Apartment Building with Underground Parking
Start Date Submittal Complete Date Status  
02/12/2022 RESUBMITTAL - TI ALL 03/18/2022 COMPLETED Review Details
04/01/2022 RESUBMITTAL 05/13/2022 COMPLETED Review Details
05/13/2022 RESUBMITTAL 06/28/2022 COMPLETED Review Details
12/12/2021 COMMERCIAL - NEW 02/02/2022 COMPLETED Review Details
12/12/2022 COMMERCIAL REVIEW - FULL v.1 01/23/2023 APPROVED Review Details
05/13/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/19/2026 APPROVED Review Details
04/24/2023 COMMERCIAL REVIEW - FULL v.1 05/18/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T21CM09453
Permit Status: Issued
Permit Description: New Apartment Building with Underground Parking
Total Outstanding Activity Conditions - 13
Date Name
01/23/2023 Prior to final verify impact fees have been addressed.
06/28/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/28/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
06/28/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/28/2022 SHOP DRAWINGS REQUIRED FOR TRUSSES
06/28/2022 SHOP DRAWINGS REQUIRED FOR SPRINKLER SYSTEM.
06/28/2022 SHOP DRAWINGS REQUIRED FOR RADIO COVERAGE SYSTEM.
10/05/2022 ISSUED WITH PCRWRD & PDEQ CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWER G-2022-047/#P22WI00020 IS ACCEPTED AND RELEASED BY PCRWRDNO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE TWO PUBLIC SEWER MANHOLE TAP PERMITS TO IMS ID: 2011-010-05 ARE ACCEPTED AND RELEASED BY PCRWRD. NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PRIVATE SEWER #P22SD0074 IS ISSUED A DISCHARGE AUTHORIZATION BY PDEQ

Conditions

Permit Number - T21CM09453
Permit Status: Issued
Permit Description: New Apartment Building with Underground Parking
Date Description Comments
10/05/2022 NEED WASTE WATER RECEIPT

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM09453
Permite Description: New Apartment Building with Underground Parking
Total Outstanding Inspections - 30
Last Inspection Date Description Inspector Results Comments
05/11/2022 COT - FCON - Fire - Final N/A Re-inspection required {Activity date: 05/11/2022; Status: Prior to Final Inspectn; Inspector: JPEEL-DAVIS; Comment: Entered by JPEELDA1 - Initial permit fees include 10 hours of inspections}
06/28/2022 COT - HCME - Mechanical Final N/A Re-inspection required {Activity date: 06/28/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION}
07/06/2023 COT - HCBU - Preslab N/A Partial Pass This inspection is for excavation/layout rebar for concrete column footings at HL: H/11 (F2), I/11 (F2), J/11 (F4). Ok to place concrete in progress areas.
01/31/2025 COT - HCBU - Masonry Pregrout N/A Partial Pass East pool/retaining CMU wall at 4’ - 8’. Ok to place grout in progress areas.
05/27/2025 COT - HCPL - Plumbing Roof Drains N/A Partial Pass Roof drains #1, 2, 3, 5: under hydro test.
10/10/2024 COT - HCEL - Electrical Underground N/A Partial Pass SES conduit lines (4”): 15 lines on North side of building, and 15 lines on South side of building. Ensure that marking tape is in place before,covering progress atres.
01/07/2026 COT - BULD - SWG Clearance N/A Not Ready
06/23/2023 COT - HCBU - Building Final N/A Not Ready Contractor cancelled.
10/16/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Large planters in central courtyard: concrete placed as per plans.
05/04/2026 COT - HCBU - TCO N/A Not Ready
12/23/2024 COT - HCPL - Gas Pressure Test N/A Partial Pass Gas lines pressure tested at 15 psi. Not ready for a meter set at this time
05/15/2025 COT - HCBU - Roof Nailing N/A Partial Pass 5/15/25: roof at bridge per plans ok to proceed with crickets].
12/13/2024 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Partial Pass Level #2, Area B, Room units; S243, S244, S245, S249, S250, S251, S252, S253, S254, S255.
02/23/2026 COT - HCPL - Plumbing Final N/A Partial Pass Commercial suites at North,Building. Ok to set ceiling tiles.
05/29/2026 COT - HCEL - Electrical Final N/A Not Ready Courtesy inspection . 5/29/2026
06/22/2026 COT - HCEL - Electrical Progress N/A Canceled 6-22-26: canceled.
07/22/2026 COT - HCPL - Plumbing Progress N/A Not Ready
07/22/2026 COT - HCME - Mechanical Progress N/A Not Ready
08/05/2025 COT - HCBU - Exterior Clips/Sheathing N/A Partial Pass Strapping at Levels 3 - 5 courtyard in section D.
10/30/2025 COT - HCBU - Framing N/A Partial Pass 10/30/25: Commercial units # 166; 165; 164; 163; 162; 161 c-channels installed ok to proceed.
06/22/2026 COT - HCBU - Building Progress N/A Partial Pass 6-22-26: partial pass- rc- channel verified at unit's 301, 302, 303, 326, 325, 327, 328. Okay to continue with construction at progress areas.
07/22/2026 COT - HCBU - Interior Shear Bracing N/A Not Ready
07/02/2026 COT - HCME - Mechanical Intermediate N/A Not Ready
07/02/2026 COT - HCPL - Plumbing Intermediate N/A Not Ready
07/02/2026 COT - HCEL - Electrical Intermediate N/A Not Ready
09/25/2025 COT - HCBU - Building Above Ceiling N/A Partial Pass Level #5, Section A: Room units 531 - 568. Ok to sheet rock ceiling areas. South exterior of building at Levels 1 - 5; exterior sheathing, Ok to cover progress areas.
02/23/2026 COT - HCEL - Electrical Above Ceiling N/A Partial Pass Commercial suites at North Building; Ok to set ceiling tiles.
02/23/2026 COT - HCPL - Plumbing Above Ceiling N/A Partial Pass Commercial suites at North Building. Ok to set ceiling tiles.
02/23/2026 COT - HCME - Mechanical Above Ceiling N/A Partial Pass Commercial suites at North Building. Ok to set ceiling,tiles.
06/04/2026 BULD - Electrical Clearance N/A Partial Pass 6/4/2026 Partial pass. Clearance for TEP ECO. 1133,1135,1138,1139,1153,1155,1156,1158.

Completed Inspections

Permit Status: Issued
Permit Number: T21CM09453
Permit Description: New Apartment Building with Underground Parking
Total Completed Inspections - 6
Date Description Inspector Results Comments
06/17/2024 COT - HCPL - Rough Soil Passed
06/17/2024 COT - HCPL - Sewer Passed
01/20/2026 COT - BULD - SWG Clearance Passed Ok to set commercial meters (2) for apartment complex.
05/04/2026 PDSD Building Division SIte Consultation Passed
05/04/2026 COT - HCPL - Gas Pressure Test Passed
05/04/2026 COT - HCBU - Roof Nailing Passed