Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T21CM09453

Parcel: 11620637A


Addresses:

165 S LINDA AV


Inspection Status: Partial Pass

Inspection History: COT - HCBU - Building Above Ceiling 

Permit Number - T21CM09453

Inspection Description - COT - HCBU - Building Above Ceiling 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
05/15/2025 COT - HCBU - Building Above Ceiling  Partial Pass 5/15/25: above ceiling passed in rooms Area A 133, 135,138,139,140,141,
05/21/2025 COT - HCBU - Building Above Ceiling  Partial Pass Level #1: Room units 43, 44, 45, 48, 50, 57, 58, 59, 60.
05/27/2025 COT - HCBU - Building Above Ceiling  Canceled Contractor cancelled, will reschedule for 28 May>
COT - HCBU - Building Above Ceiling  Canceled
06/02/2025 COT - HCBU - Building Above Ceiling  Not Ready
06/05/2025 COT - HCBU - Building Above Ceiling  Canceled 6/5/2025 canceled per contractor.
06/10/2025 COT - HCBU - Building Above Ceiling  Partial Pass 6/10/2025 partial pass. Area A second floor drop ceilings approved. Okay to proceed progress areas.
06/13/2025 COT - HCBU - Building Above Ceiling  Partial Pass 2nd floor area B. Drop ceilings areas approved. Okay to proceed with progress area. 252,251,249,247,245 need to be re inspected. 6/13/2025
COT - HCBU - Building Above Ceiling  Partial Pass 5/15/25: above ceiling passed in rooms Area A 133, 135,138,139,140,141,

6/5/2025 canceled per contractor.

6/10/2025 partial pass. Area A second floor drop ceilings approved. Okay to proceed progress areas.

2nd floor area B. Drop ceilings areas approved. Okay to proceed with progress area. 252,251,249,247,245 need to be re inspected. 6/13/2025
6/26/25: 2nd floor area B drop ceilings approved in listed rooms.
07/02/2025 COT - HCBU - Building Above Ceiling  Partial Pass 5/15/25: above ceiling passed in rooms Area A 133, 135,138,139,140,141,

6/5/2025 canceled per contractor.

6/10/2025 partial pass. Area A second floor drop ceilings approved. Okay to proceed progress areas.

2nd floor area B. Drop ceilings areas approved. Okay to proceed with progress area. 252,251,249,247,245 need to be re inspected. 6/13/2025
6/26/25: 2nd floor area B drop ceilings approved in listed rooms.
7/2/25: electrical above ceiling 155,154,153,152,151,156
07/21/2025 COT - HCBU - Building Above Ceiling  Not Ready
07/23/2025 COT - HCBU - Building Above Ceiling  Partial Pass 5/15/25: above ceiling passed in rooms Area A 133, 135,138,139,140,141,

6/5/2025 canceled per contractor.

6/10/2025 partial pass. Area A second floor drop ceilings approved. Okay to proceed progress areas.

2nd floor area B. Drop ceilings areas approved. Okay to proceed with progress area. 252,251,249,247,245 need to be re inspected. 6/13/2025
6/26/25: 2nd floor area B drop ceilings approved in listed rooms.
7/2/25: electrical above ceiling 155,154,153,152,151,156
7/23/25: electrical above ceiling third floor Area A.
07/29/2025 COT - HCBU - Building Above Ceiling  Partial Pass Level,#3; Area “B”, MEP for rooms 342, 346, 349, 348, 350, 351, 353, 353, 354, 355, 359, 359. OK to cover subject ceilings.
08/13/2025 COT - HCBU - Building Above Ceiling  Partial Pass 5/15/25: above ceiling passed in rooms Area A 133, 135,138,139,140,141,

6/5/2025 canceled per contractor.

6/10/2025 partial pass. Area A second floor drop ceilings approved. Okay to proceed progress areas.

2nd floor area B. Drop ceilings areas approved. Okay to proceed with progress area. 252,251,249,247,245 need to be re inspected. 6/13/2025
6/26/25: 2nd floor area B drop ceilings approved in listed rooms.
7/2/25: electrical above ceiling 155,154,153,152,151,156
7/23/25: electrical above ceiling third floor Area A.
8/13/25: building above ceiling Above ceiling NB-L4-A
units 431-432-433-434-435-436-438-439-440 approved.
08/21/2025 COT - HCBU - Building Above Ceiling  Partial Pass 8/21/24: above ceiling Section C #508, 506,504,505,507,503,502,501,524,525,527,517,502
08/28/2025 COT - HCBU - Building Above Ceiling  Not Ready
09/03/2025 COT - HCBU - Building Above Ceiling  Partial Pass Mechanical, electrical, plumbing above ceilings in rooms: 441. 460, 459, 458, 457, 456, 455, 454, 452, 450, 451, 448, 449
09/25/2025 COT - HCBU - Building Above Ceiling  Partial Pass Level #5, Section A: Room units 531 - 568. Ok to sheet rock ceiling areas. South exterior of building at Levels 1 - 5; exterior sheathing, Ok to cover progress areas.
10/16/2025 COT - HCBU - Building Above Ceiling  Partial Pass Level #5, section B, Room units 541, 548, 549, 550, 551, 553, 554, 555, 556, 557. Ok to drop-down ceiling areas.
10/28/2025 COT - HCBU - Building Above Ceiling  Partial Pass 10/28/25:S342,343,344,345, above ceiling
10/30/2025 COT - HCBU - Building Above Ceiling  Not Ready
11/04/2025 COT - HCBU - Building Above Ceiling  Re-inspection required 11/4/25: Unit S446 and S447 above ceiling have been covered prior to passing inspection, I walked both units on 10/30/25 and neither of them were ready for inspection. Covering took place without passing inspection. Please remove drywall in those units to verify all penetrations have been sealed and M.E.P have been installed per plans.
11/17/2025 COT - HCBU - Building Above Ceiling  Partial Pass 11/17/25: Rooms 126 and 131 above ceiling (fitness and clubhouse)
11/25/2025 COT - HCBU - Building Above Ceiling  Not Ready