Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Building Above Ceiling
Permit Number - T21CM09453
Inspection Description - COT - HCBU - Building Above Ceiling
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | 5/15/25: above ceiling passed in rooms Area A 133, 135,138,139,140,141, | |
| 05/21/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | Level #1: Room units 43, 44, 45, 48, 50, 57, 58, 59, 60. | |
| 05/27/2025 | COT - HCBU - Building Above Ceiling | Canceled | Contractor cancelled, will reschedule for 28 May> | |
| COT - HCBU - Building Above Ceiling | Canceled | |||
| 06/02/2025 | COT - HCBU - Building Above Ceiling | Not Ready | ||
| 06/05/2025 | COT - HCBU - Building Above Ceiling | Canceled | 6/5/2025 canceled per contractor. | |
| 06/10/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | 6/10/2025 partial pass. Area A second floor drop ceilings approved. Okay to proceed progress areas. | |
| 06/13/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | 2nd floor area B. Drop ceilings areas approved. Okay to proceed with progress area. 252,251,249,247,245 need to be re inspected. 6/13/2025 | |
| COT - HCBU - Building Above Ceiling | Partial Pass | 5/15/25: above ceiling passed in rooms Area A 133, 135,138,139,140,141, 6/5/2025 canceled per contractor. 6/10/2025 partial pass. Area A second floor drop ceilings approved. Okay to proceed progress areas. 2nd floor area B. Drop ceilings areas approved. Okay to proceed with progress area. 252,251,249,247,245 need to be re inspected. 6/13/2025 6/26/25: 2nd floor area B drop ceilings approved in listed rooms. |
||
| 07/02/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | 5/15/25: above ceiling passed in rooms Area A 133, 135,138,139,140,141, 6/5/2025 canceled per contractor. 6/10/2025 partial pass. Area A second floor drop ceilings approved. Okay to proceed progress areas. 2nd floor area B. Drop ceilings areas approved. Okay to proceed with progress area. 252,251,249,247,245 need to be re inspected. 6/13/2025 6/26/25: 2nd floor area B drop ceilings approved in listed rooms. 7/2/25: electrical above ceiling 155,154,153,152,151,156 |
|
| 07/21/2025 | COT - HCBU - Building Above Ceiling | Not Ready | ||
| 07/23/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | 5/15/25: above ceiling passed in rooms Area A 133, 135,138,139,140,141, 6/5/2025 canceled per contractor. 6/10/2025 partial pass. Area A second floor drop ceilings approved. Okay to proceed progress areas. 2nd floor area B. Drop ceilings areas approved. Okay to proceed with progress area. 252,251,249,247,245 need to be re inspected. 6/13/2025 6/26/25: 2nd floor area B drop ceilings approved in listed rooms. 7/2/25: electrical above ceiling 155,154,153,152,151,156 7/23/25: electrical above ceiling third floor Area A. |
|
| 07/29/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | Level,#3; Area “B”, MEP for rooms 342, 346, 349, 348, 350, 351, 353, 353, 354, 355, 359, 359. OK to cover subject ceilings. | |
| 08/13/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | 5/15/25: above ceiling passed in rooms Area A 133, 135,138,139,140,141, 6/5/2025 canceled per contractor. 6/10/2025 partial pass. Area A second floor drop ceilings approved. Okay to proceed progress areas. 2nd floor area B. Drop ceilings areas approved. Okay to proceed with progress area. 252,251,249,247,245 need to be re inspected. 6/13/2025 6/26/25: 2nd floor area B drop ceilings approved in listed rooms. 7/2/25: electrical above ceiling 155,154,153,152,151,156 7/23/25: electrical above ceiling third floor Area A. 8/13/25: building above ceiling Above ceiling NB-L4-A units 431-432-433-434-435-436-438-439-440 approved. |
|
| 08/21/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | 8/21/24: above ceiling Section C #508, 506,504,505,507,503,502,501,524,525,527,517,502 | |
| 08/28/2025 | COT - HCBU - Building Above Ceiling | Not Ready | ||
| 09/03/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | Mechanical, electrical, plumbing above ceilings in rooms: 441. 460, 459, 458, 457, 456, 455, 454, 452, 450, 451, 448, 449 | |
| 09/25/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | Level #5, Section A: Room units 531 - 568. Ok to sheet rock ceiling areas. South exterior of building at Levels 1 - 5; exterior sheathing, Ok to cover progress areas. | |
| 10/16/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | Level #5, section B, Room units 541, 548, 549, 550, 551, 553, 554, 555, 556, 557. Ok to drop-down ceiling areas. | |
| 10/28/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | 10/28/25:S342,343,344,345, above ceiling | |
| 10/30/2025 | COT - HCBU - Building Above Ceiling | Not Ready | ||
| 11/04/2025 | COT - HCBU - Building Above Ceiling | Re-inspection required | 11/4/25: Unit S446 and S447 above ceiling have been covered prior to passing inspection, I walked both units on 10/30/25 and neither of them were ready for inspection. Covering took place without passing inspection. Please remove drywall in those units to verify all penetrations have been sealed and M.E.P have been installed per plans. | |
| 11/17/2025 | COT - HCBU - Building Above Ceiling | Partial Pass | 11/17/25: Rooms 126 and 131 above ceiling (fitness and clubhouse) | |
| 11/25/2025 | COT - HCBU - Building Above Ceiling | Not Ready |