Permit: T21CM09453

Parcel: 11620637A


Addresses:

165 S LINDA AV

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Building Progress

Date Description Inspector Results Comments
02/06/2026 COT - HCBU - Building Progress Partial Pass 2/6/26: MEP 4TH FLOOR AREA C 427,425,424,401,408,407,405, 406,404,427,425,424,404,426,428,412,413,414,415,416, 418,417, 419,420
02/19/2026 COT - HCBU - Building Progress Partial Pass RC Channel in ceilings in restaurant area in place. Ok to hang sheet rock in progress area.
03/27/2025 COT - HCBU - Building Progress Partial Pass 3/27/25: lath north Building East side complete ok to brown
04/08/2026 COT - HCBU - Building Progress Partial Pass 4/8/26: drywall in units 408,407,405,406,404,403,424,425,427 approved
05/17/2024 COT - HCBU - Building Progress Partial Pass North portion of room units in Area “B”….hardware is in place.
05/19/2025 COT - HCBU - Building Progress Re-inspection required 3/27/25: lath north Building East side complete ok to brown
5/19/25: room 446 and 447 not ready
05/29/2026 COT - HCBU - Building Progress Partial Pass Section D. 3rd floor. 317,319,320,321,322,323,324,304. 5/29/2026
05/30/2024 COT - HCBU - Building Progress Partial Pass Sections A & B stair shafts, shafts in trash room, mechanical rooms. Ok to continue to second level. Framing in progress areas, Ok to insulate and sheet rock.
06/08/2026 COT - HCBU - Building Progress Partial Pass 5th floor all corridors section B. Dropped ceilings approved. Okay to proceed progress areas. 6/8/2026
06/09/2026 COT - HCBU - Building Progress Partial Pass 6/9/2026 Partial pass, 119 above ceiling screw inspection approved. Okay to proceed with tape and mud.
RC channel in place rooms 306,305,307,308,309,310,311,312
06/11/2026 COT - HCBU - Building Progress Not Ready
06/16/2025 COT - HCBU - Building Progress Not Ready
06/20/2025 COT - HCBU - Building Progress Partial Pass 6-20-25: grease interceptor located at southeast side verified per plans. Okay to continue with construction
06/22/2026 COT - HCBU - Building Progress Partial Pass 6-22-26: partial pass- rc- channel verified at unit's 301, 302, 303, 326, 325, 327, 328. Okay to continue with construction at progress areas.
06/23/2023 COT - HCBU - Building Progress Not Ready Contractor cancelled.
06/30/2026 COT - HCBU - Building Progress Partial Pass Partial pass 2nd floor MEP approved units 210, 211. 6/30/2026
08/11/2026 COT - HCBU - Building Progress Partial Pass 8/11/2026 Partial pass. RC channel in place 2nd floor 218,217,219,220,221,222,223,226,
08/28/2025 COT - HCBU - Building Progress Partial Pass 8/28/25: ATS inspection at units 526,528,510,513,512,514,515,517,519
Shear wall approved in Area D south building units 412,414,415,419
09/11/2025 COT - HCBU - Building Progress Partial Pass 9/11/25 : HVAC shaft SB-B through L5
Mechanical shaft AKA GE shaft
10/03/2025 COT - HCBU - Building Progress Partial Pass Framing: Level #1, Electric rooms 138 and 142. Ok to insulate and cover walls.
10/13/2025 COT - HCBU - Building Progress Partial Pass 10/10/25: Electrical and plumbing in walls at South building Level 5 unit 508, 507,506,505,504,503,502,501,524,525,527
10/23/2025 COT - HCBU - Building Progress Partial Pass 10/23/25: electrical in wall approved in rooms 512,513,514,515,518,517, 520,519, south building.
10/28/2025 COT - HCBU - Building Progress Partial Pass 10/23/25: electrical in wall approved in rooms 512,513,514,515,518,517, 520,519, south building.