Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 165 S LINDA AV
Search
Parcel Attributes
Parcel | 11620637A 116206370 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | C-2, C-3 |
Tucson Ward | Ward 1 |
Tucson Downtown Incentive Zone | Downtown Core, Downtown Infill Incentive District |
Rio Nuevo Downtown | Rio Nuevo - Downtown |
Rio Nuevo Multipurpose Facilities District | Yes |
Flood Related Information | FEMA Floodplain Area ,Major Washes |
Tucson Registered Neighborhood | Menlo Park |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Annexations & Original City Zoning (OCZ)
Address: 165 S LINDA AV
Date - 07/16/2025 2:26 p.m.
Total Number Of Annexations & Original City Zoning (2)
Rezoning Cases
Date - 07/16/2025 2:26 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-70-103 | Ernest - Congress Street | R-3 | Denied | 07/10/2012 |
Special Development Requests & Requirements
Address: 165 S LINDA AV
Date - 07/16/2025 2:26 p.m.
Total Number Of Special Development Permits - (3)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
H000005660 | CLOSED | 03/14/2014 | N/A | Historical Information | RECORD TO SHOW BILLBOARD AZ488/CLEAR CHANNEL #301 REMOVED DUE TO STORM DAMAGE | |
T21SA00546 | APPLIED | 12/15/2021 | N/A | Overlay Zone | ||
T22SA00245 | COMPLETE | 05/24/2022 | N/A | Zoning Adminstration Letter | Zoning Compliance Letter for new Multifamily |
Permits
Address: 165 S LINDA AV
Date - 07/16/2025 2:26 p.m.
Total Number Of Permits - (37)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T21CM09453 | Inspections | 12/12/2021 | 01/12/2026 | Commercial Building | New Apartment Building with Underground Parking | |
TR-UTL-1224-02320 | Needs Resubmittal | 12/09/2024 | N/A | Right-of-Way (ROW) - Utility | TEP install | |
TF-FCP-1224-01056 | Issued | 12/06/2024 | 12/03/2025 | Fire Construction Permit | Installation of NEW Fire Alarm System in a new Multi-family Project.(Bautista) | |
TF-FCP-1123-01315 | Complete | 11/15/2023 | 06/06/2024 | Fire Construction Permit | Installation of 80' of 8" Ductile Iron Pipe | |
TF-FOP-1122-00006 | Complete | 11/01/2022 | 12/13/2023 | Fire Operational Permit | All Souls special event JH 11/2/22 | |
TC-COM-1023-02351 | Expired | 10/05/2023 | 09/29/2024 | Commercial Building | New construction of a new 256-unit Multi-Family Housing Project. (Commercial Electrical Scope of Work) | |
TF-FCP-0924-00822 | Void | 09/23/2024 | N/A | Fire Construction Permit | VOID - Installation of fire sprinkler system | |
TF-FCP-0823-01040 | Inspections | 08/29/2023 | 04/24/2025 | Fire Construction Permit | Installation of fire sprinkler system | |
TF-FCP-0824-00682 | Void | 08/15/2024 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0823-01040 - Modification to existing fire sprinkler permit | |
TF-FCP-0824-00627 | Void | 08/06/2024 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0823-01040 and attach 2024 COT Business License & AZROC - Modification to approved fire plans changing sidewall heads to pendants | |
TR-UTL-0724-01310 | Inspections | 07/12/2024 | 05/15/2025 | Right-of-Way (ROW) - Utility | 5' x 5' BELL HOLE IN CONCRETE ALONG WITH AN APPROXIMATE 2' X 300' TRENCH IN DIRT/ASPHALT/CONCRETE 5/12/25: **DENIED- ONLY ONE RENEWAL ALLOWED PER PERMIT. PLEASE APPLY FOR NEW PERMIT REFERENCING "CONTINUATION OF TR-UTL-0724-01310"** | |
DP21-0157 | Needs Resubmittal | 06/21/2021 | 07/13/2028 | Development Package | REV 3 - Site/Grading/Swppp - Bautista Mixed-Use Project. 256 Apartments / Commercial Units. | |
TR-UTL-0525-00763 | Issued | 05/12/2025 | 09/05/2025 | Right-of-Way (ROW) - Utility | PLS EXPEDITE - CONTINUATION OF PERMIT TR-UTL-0724-01310 5' x 5' BELL HOLE IN CONCRETE ALONG WITH AN APPROXIMATE 2' X 300' TRENCH IN DIRT/ASPHALT/CONCRETE - ARCHAEOLOGICAL STAND BY SCHEDULING IN PROGRESS | |
TC-COM-0423-01086 | Void | 04/19/2023 | 10/16/2023 | Commercial Building | VOID - Permit applied under wrong Work Class - This is not a New Commercial Building - Garage shoring | |
TR-ROW-0423-00633 | Issued | 04/13/2023 | 07/13/2023 | Right-of-Way (ROW) | barricade permit (fence) | |
TR-ROW-0423-00625 | Complete | 04/11/2023 | 06/30/2023 | Right-of-Way (ROW) | Install Fiber and Conduit Pathway. 4-days Congress Crossing by Directional Bore. 25-days for Linda Ave conduit install by trench on east side shoulder. 2-days for aerial Cable over lash. | |
TC-COM-0425-00699 | Inspections | 04/10/2025 | 12/01/2025 | Commercial Building | Construction of Pool & Spa | |
TR-UTL-0424-00717 | Complete | 04/04/2024 | 09/22/2024 | Right-of-Way (ROW) - Utility | Water Line Tap and Water line run | |
TR-ROW-0425-00423 | Needs Resubmittal | 04/01/2025 | N/A | Right-of-Way (ROW) | Barricade Permit (Fencing) around the construction area. Continuation of permit number TR-ROW-0423-00633. | |
TR-ROW-0323-00576 | Issued | 03/30/2023 | 02/27/2024 | Right-of-Way (ROW) | Installation of Water Line for the Bautista Mixed-Use Project | |
TR-ROW-0323-00569 | Issued | 03/29/2023 | 05/26/2023 | Right-of-Way (ROW) | Installation of approx. 300 lf of Sewer Line for the Bautista Mixed-Use Project, P22WI00020 | |
TF-FCP-0325-00232 | Void | 03/19/2025 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0823-01040 - The project consists of four buildings within a compound, including a multi-family dwelling (MFD) structure, along with an underground parking facility. The fire alarm system is a comprehensive, addressable system featuring a main Fire Alarm Control Panel (FACP) and multiple sub-panels and nodes. The system includes a total of 632 low-frequency horns, along with various additional audio/visual devices located in common areas. In total, there will be 107 addressable ceiling-mounted detectors, which will consist of either heat or smoke detectors. All necessary components of the fire alarm system are equipped with battery backup to ensure continued operation in the event of a power failure and up to nfpa72 standards. UL Listed with all necessary info in submittal package. | |
TF-FCP-0325-00235 | Void | 03/19/2025 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0823-01040 - The project consists of four buildings within a compound, including a multi-family dwelling (MFD) structure, along with an underground parking facility. The fire alarm system is a comprehensive, addressable system featuring a main Fire Alarm Control Panel (FACP) and multiple sub-panels and nodes. The system includes a total of 632 low-frequency horns, along with various additional audio/visual devices located in common areas. In total, there will be 107 addressable ceiling-mounted detectors, which will consist of either heat or smoke detectors. All necessary components of the fire alarm system are equipped with battery backup to ensure continued operation in the event of a power failure and up to nfpa72 standards. UL Listed with all necessary info in submittal package. | |
TF-FCP-0325-00221 | Void | 03/17/2025 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0823-01040 - The project consists of four buildings within a compound, including a multi-family dwelling (MFD) structure, along with an underground parking facility. The fire alarm system is a comprehensive, addressable system featuring a main Fire Alarm Control Panel (FACP) and multiple sub-panels and nodes. The system includes a total of 632 low-frequency horns, along with various additional audio/visual devices located in common areas. In total, there will be 107 addressable ceiling-mounted detectors, which will consist of either heat or smoke detectors. All necessary components of the fire alarm system are equipped with battery backup to ensure continued operation in the event of a power failure and up to nfpa72 standards. UL Listed with all necessary info in submittal package. | |
TR-ROW-0323-00487 | Withdrawn | 03/13/2023 | N/A | Right-of-Way (ROW) | water line, sewer line & man hole and street improvements | |
TC-COM-0223-00676 | Issued | 02/21/2023 | 02/10/2024 | Commercial Building | Temp power. Power Plus is to provide power to project site using a 800AMP three phase 120/208V system via underground conduit. | |
TC-UTL-0123-00039 | Submitted | 01/10/2023 | 07/09/2023 | Utilities Permit | Site/Grading/Swppp - Bautista Mixed-Use Project. 256 Apartments / Commercial Units. | |
T14EX01211 | CLOSED | 11/20/2014 | 01/19/2015 | EXCAV | ALTERATIONS TO SEPARATE IRRIGATION SYSTEMS ON CUSHING STREET @ AVENIDA DEL CONVENTO EAST OF LINDA AVE COMPLETED 11-12-2014 BY STREETS. INSTALLED 2 BALL VALVE AND 1" PURPLE RECLAIMED WATER LINE 400LF ON EITHER SIDE OF THE ROAD FOR A TOTAL OF 800LF. REMOVED & RELOCATED 2 VALVES INSTALLED 2 BATTERY OPERATED CONTROLLER STATIONS. | |
T15TUP0002 | WITHDRWN | 03/18/2015 | N/A | TUP | Short term parking of cars, RV's, and shuttle vans. Operation of parking lot. | |
T16BU00717 | FINAL | 05/04/2016 | 11/05/2016 | TENTS | TENT | |
T16FO00091 | FINAL | 11/04/2016 | 05/22/2017 | FIREOPER | All Souls Procession 11/6 | |
T17FO00922 | FINAL | 10/30/2017 | 11/27/2018 | FIREOPER | All Souls Procession 11/5/17 | |
T18FO00937 | FINAL | 10/30/2018 | 05/03/2019 | FIREOPER | All Souls Procession 11/04/18 | |
T19FO00772 | FINAL | 09/25/2019 | 04/02/2020 | FIREOPER | WEST COAST MUSIC FESTIVAL 10-05 FROM 3:00 TO 10:00PM | |
T19FO00813 | FINAL | 10/07/2019 | 05/01/2020 | FIREOPER | All Souls Procession 2019 (at the end of procession) 11.03.19 | |
T20FO00017 | FINAL | 01/09/2020 | 07/29/2020 | FIREOPER | GEM SHOW - African Art Village - February 2 - 17, 2019 Set-up - January 28, 2019 | |
T21RW04603 | FINAL | 10/08/2021 | 11/08/2021 | ROW | THE ALL SOULS PROCESSION IS A FREE, HYPER-INCLUSIVE, PATICIPATORY, NON-MOTORIZED MEMORIAL MARCH TO HONOR THOSE WHO HAVE PASSED. THE EVENT SPANS THE WEEKEND WITH ANCILLARY EVENTS, WORKSHOPS AND OTHER FAMILY FRIENDLY ACTIVITIES THAT CULMINATE ON SUNDAY NOVEMBER 7, 2021. NOW IN ITS 32nd YEAR THE PROCESSION TYPICALLY DRAWS OVER 150,000 ATTENDEES. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. MAINTAIN PEDESTRIAN ACCESS 3. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 |
Code Enforcement
Address: 165 S LINDA AV
Date - 07/16/2025 2:26 p.m.
Total Number Of Code Cases - (2)
Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CE-VIO1023-06262 | Closed - Resolved | 10/27/2023 | 10/30/2023 | RWOP- Working outside of permitted time frame, construction is reported to be before sun up. | ||
CE-VIO0124-00414 | Closed - Resolved | 01/29/2024 | 02/05/2024 | Building: Construction noise outside of limits; typically 3-4 am with no Temporary Noise Exemption for those days. |
Plans
Address: 165 S LINDA AV
Date - 07/16/2025 2:26 p.m.
Total Number Of Plans - (6)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
S22-062 | Complete | 09/30/2022 | N/A | -- Land Split/Lot Split | Mission District, Land Split | |
T21SA00546 | Approved | 12/15/2021 | N/A | -- Infill Incentive District (IID) | The Bautista - New apartments, commercial, retail (IID/IPP Application) | |
TC-BCA-1123-00026 | Approved | 11/22/2023 | N/A | -- Building Code Appeal | Code determination to use non-fire-retardant-treated wood within floor assemblies | |
TE-BAS-0923-00179 | In Review | 09/05/2023 | N/A | -- Commercial Water Harvesting Ordinance | LEGACY PERMIT BROUGHT IN FROM PRO REV - Site/Grading/Swppp - Bautista Mixed-Use Project. 256 Apartments / Commercial Units. | |
TW-WCP-0923-00109 | Accepted | 09/11/2023 | 09/10/2024 | -- Water Design Plan | Bautista Mixed Use Project Revisions - DP1825 | |
T21PRE0272 | PLAN CK | 12/21/2021 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS |
Record Requests
Address: 165 S LINDA AV
Date - 07/16/2025 2:26 p.m.
Total Number Of Requests - (13)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0224-01138 | Denied | 02/08/2024 | 02/08/2024 | Requests | **Renewal request Denied- Permit expired in 07/13/2023**Requesting a 90 Day Extension on Permit #TR-ROW-0423-0633 |
REQ-0225-00896 | Denied | 02/05/2025 | 02/05/2025 | Requests | **DENIED DUE TO NO PRE-ACTIVITY MEETING HELD/SCHEDULED** Please Renew for 90 Days - 5' x 5' BELL HOLE IN CONCRETE ALONG WITH AN APPROXIMATE 2' X 300' TRENCH IN DIRT/ASPHALT/CONCRETE |
REQ-0225-01003 | Approved | 02/10/2025 | 02/10/2025 | Requests | PLEASE RENEW FOR 90 DAYS - 5' x 5' BELL HOLE IN CONCRETE ALONG WITH AN APPROXIMATE 2' X 300' TRENCH IN DIRT/ASPHALT/CONCRETE |
REQ-0323-01870 | Complete | 03/29/2023 | 03/30/2023 | Requests | water line |
REQ-0325-01935 | Denied | 03/21/2025 | N/A | Requests | ** DENIED- PERMIT EXPIRED 7/13/2023** barricade permit (fence) |
REQ-0424-02566 | Complete | 04/02/2024 | 04/02/2024 | Requests | New construction of a new 256-unit Multi-Family Housing Project. (Commercial Electrical Scope of Work) |
REQ-0523-02864 | Denied | 05/23/2023 | 05/26/2023 | Requests | Denied - no pre-activity meeting scheduled via the online portal. Also, 30/60/90 day renewal allowed. Unforeseen conditions pertaining to the Archaeology Zoning Area. These issues have been addressed and work has commenced as of May 23, 2023. I ask that a 180 day extension be granted. Thanks, |
REQ-0523-02865 | Denied | 05/23/2023 | N/A | Requests | Denied - no pre-activity meeting scheduled via the online portal. Also, extension are only in the 30/60/90 days. - Unforeseen conditions pertaining to the Archaeology Zoning Area. These issues have been addressed and work has commenced as of May 23, 2023. I ask that a 180 day extension be granted. Thanks, |
REQ-0525-03267 | Denied | 05/09/2025 | 05/12/2025 | Requests | **DENIED- ONLY ONE RENEWAL ALLOWED PER PERMIT. PLEASE APPLY FOR NEW PERMIT REFERENCING "CONTINUATION OF TR-UTL-0724-01310"**Requesting additional 90 day renewal due to delays with archaeological stand by scheduling* 5' x 5' BELL HOLE IN CONCRETE ALONG WITH AN APPROXIMATE 2' X 300' TRENCH IN DIRT/ASPHALT/CONCRETE |
REQ-0623-03473 | Canceled | 06/22/2023 | N/A | Requests | Please extend |
REQ-0823-04604 | Complete | 08/24/2023 | 09/01/2023 | Requests | Installation of Water Line for the Bautista Mixed-Use Project. I would like to request a 90 day extension. |
REQ-1122-00150 | Void | 11/17/2022 | N/A | Requests | ***voided** wrong type of submittal from customer- Site/Grading/Swppp - Bautista Mixed-Use Project. 256 Apartments / Commercial Units. |
REQ-1123-06496 | Complete | 11/29/2023 | 11/29/2023 | Requests | 90 day extension as of today. - Per communication with Jarend with EMJ. Installation of Water Line for the Bautista Mixed-Use Project |