Permit: T21CM09453

Parcel: 11620637A


Addresses:

165 S LINDA AV


Inspection Status: Partial Pass

Inspection History: COT - HCBU - Exterior Clips/Sheathing 

Permit Number - T21CM09453

Inspection Description - COT - HCBU - Exterior Clips/Sheathing 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/23/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass North building; South side at Levels #1 - 3; Horizontal and vertical straps in area B.
02/12/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass North building, West side, Levels #1 - 5. Straps and sheathing nailed in place. OK to cover exterior walls.
02/20/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass Short walls North Building, South walls of North building at Levels #4 & #5 (West portion). Ok to cover progress areas.
02/26/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass Area B exterior courtyard straps and sheathing at Levels 1 -5 . Ok to cover exterior walls.
03/04/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass Interior courtyard A, straps at shear walls and sheathing. Ok to,cover progress areas.
03/07/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass North building, North elevation clips/straps/sheathing (East end to be evaluated)
05/02/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass Building A, West side Levels 2 - 5. Ok to water proof progress areas.
06/02/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 5/6/25: hold-downs per plan at first floor breezeway, (anchor bolts with appropriate washer plates required to be installed where sill plate is larger than 12"), (anchor bolt spacing not per schedule) please call us back out once issues are corrected to ensure items were completed. Ok to proceed with sheathing at first floor south building patio columns on south half and west half.

Canceled per contractor. 5/23/2025
5/28/25: partial pass for hardware at stairway 2 at north building. Pending R302.11 Fireblocking at landings.
6/2/25: exterior shear wall approved in units 303,403,503,302,402,502,301,402,502,324,424,524,323,322,321. First floor south building south columns per plan. Ok to proceed with sheathing.
07/09/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 5/6/25: hold-downs per plan at first floor breezeway, (anchor bolts with appropriate washer plates required to be installed where sill plate is larger than 12"), (anchor bolt spacing not per schedule) please call us back out once issues are corrected to ensure items were completed. Ok to proceed with sheathing at first floor south building patio columns on south half and west half.

Canceled per contractor. 5/23/2025
5/28/25: partial pass for hardware at stairway 2 at north building. Pending R302.11 Fireblocking at landings.
6/2/25: exterior shear wall approved in units 303,403,503,302,402,502,301,402,502,324,424,524,323,322,321. First floor south building south columns per plan. Ok to proceed with sheathing.
7/9/25: exterior sheathing approved on East end of South building. Ok to proceed with dry-in
07/21/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 5/6/25: hold-downs per plan at first floor breezeway, (anchor bolts with appropriate washer plates required to be installed where sill plate is larger than 12"), (anchor bolt spacing not per schedule) please call us back out once issues are corrected to ensure items were completed. Ok to proceed with sheathing at first floor south building patio columns on south half and west half.

Canceled per contractor. 5/23/2025
5/28/25: partial pass for hardware at stairway 2 at north building. Pending R302.11 Fireblocking at landings.
6/2/25: exterior shear wall approved in units 303,403,503,302,402,502,301,402,502,324,424,524,323,322,321. First floor south building south columns per plan. Ok to proceed with sheathing.
7/9/25: exterior sheathing approved on East end of South building. Ok to proceed with dry-in
7/21/25: Courtyard C West and North elevations. Missing straps from post to beam to post at north elevation.
07/31/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass Level #4, Area D courtyard; South elevation straps.
08/01/2025 COT - HCBU - Exterior Clips/Sheathing  Canceled Contractor cancelled.
08/05/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass Strapping at Levels 3 - 5 courtyard in section D.
09/23/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 4th floor section C and D. Approved interior sheathing (OSB). Okay to proceed progress areas. 9/23/2025
10/31/2025 COT - HCBU - Exterior Clips/Sheathing  Partial Pass Electric room #210, framing and fire caulking are complete. Ok to insulate and sheet rock.
12/16/2024 COT - HCBU - Exterior Clips/Sheathing  Not Ready Contractor cancelled.
12/31/2024 COT - HCBU - Exterior Clips/Sheathing  Partial Pass East exterior walls; clip and nails.