Inspection Status: Partial Pass
Inspection History: COT - HCBU - Exterior Clips/Sheathing
Permit Number - T21CM09453
Inspection Description - COT - HCBU - Exterior Clips/Sheathing
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | North building; South side at Levels #1 - 3; Horizontal and vertical straps in area B. | |
| 02/12/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | North building, West side, Levels #1 - 5. Straps and sheathing nailed in place. OK to cover exterior walls. | |
| 02/20/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | Short walls North Building, South walls of North building at Levels #4 & #5 (West portion). Ok to cover progress areas. | |
| 02/26/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | Area B exterior courtyard straps and sheathing at Levels 1 -5 . Ok to cover exterior walls. | |
| 03/04/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | Interior courtyard A, straps at shear walls and sheathing. Ok to,cover progress areas. | |
| 03/07/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | North building, North elevation clips/straps/sheathing (East end to be evaluated) | |
| 05/02/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | Building A, West side Levels 2 - 5. Ok to water proof progress areas. | |
| 06/02/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 5/6/25: hold-downs per plan at first floor breezeway, (anchor bolts with appropriate washer plates required to be installed where sill plate is larger than 12"), (anchor bolt spacing not per schedule) please call us back out once issues are corrected to ensure items were completed. Ok to proceed with sheathing at first floor south building patio columns on south half and west half. Canceled per contractor. 5/23/2025 5/28/25: partial pass for hardware at stairway 2 at north building. Pending R302.11 Fireblocking at landings. 6/2/25: exterior shear wall approved in units 303,403,503,302,402,502,301,402,502,324,424,524,323,322,321. First floor south building south columns per plan. Ok to proceed with sheathing. |
|
| 07/09/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 5/6/25: hold-downs per plan at first floor breezeway, (anchor bolts with appropriate washer plates required to be installed where sill plate is larger than 12"), (anchor bolt spacing not per schedule) please call us back out once issues are corrected to ensure items were completed. Ok to proceed with sheathing at first floor south building patio columns on south half and west half. Canceled per contractor. 5/23/2025 5/28/25: partial pass for hardware at stairway 2 at north building. Pending R302.11 Fireblocking at landings. 6/2/25: exterior shear wall approved in units 303,403,503,302,402,502,301,402,502,324,424,524,323,322,321. First floor south building south columns per plan. Ok to proceed with sheathing. 7/9/25: exterior sheathing approved on East end of South building. Ok to proceed with dry-in |
|
| 07/21/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 5/6/25: hold-downs per plan at first floor breezeway, (anchor bolts with appropriate washer plates required to be installed where sill plate is larger than 12"), (anchor bolt spacing not per schedule) please call us back out once issues are corrected to ensure items were completed. Ok to proceed with sheathing at first floor south building patio columns on south half and west half. Canceled per contractor. 5/23/2025 5/28/25: partial pass for hardware at stairway 2 at north building. Pending R302.11 Fireblocking at landings. 6/2/25: exterior shear wall approved in units 303,403,503,302,402,502,301,402,502,324,424,524,323,322,321. First floor south building south columns per plan. Ok to proceed with sheathing. 7/9/25: exterior sheathing approved on East end of South building. Ok to proceed with dry-in 7/21/25: Courtyard C West and North elevations. Missing straps from post to beam to post at north elevation. |
|
| 07/31/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | Level #4, Area D courtyard; South elevation straps. | |
| 08/01/2025 | COT - HCBU - Exterior Clips/Sheathing | Canceled | Contractor cancelled. | |
| 08/05/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | Strapping at Levels 3 - 5 courtyard in section D. | |
| 09/23/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 4th floor section C and D. Approved interior sheathing (OSB). Okay to proceed progress areas. 9/23/2025 | |
| 10/31/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | Electric room #210, framing and fire caulking are complete. Ok to insulate and sheet rock. | |
| 12/16/2024 | COT - HCBU - Exterior Clips/Sheathing | Not Ready | Contractor cancelled. | |
| 12/31/2024 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | East exterior walls; clip and nails. |