Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 01/05/2024 |
COT - HCBU - Preslab |
|
Partial Pass |
Podium, Placement,#8, bottom rebar mat. Ensure stirrups are properly placed in beam areas. |
| 01/22/2024 |
COT - HCBU - Preslab |
|
Not Ready |
Contractor cancelled due to inclement weather. |
| 02/01/2024 |
COT - HCBU - Preslab |
|
Partial Pass |
Podium at placement #10, bottom mat. Ok to place concrete in progress areas |
| 02/14/2024 |
COT - HCBU - Preslab |
|
Partial Pass |
Slab area #10. Ok to place concrete in progress areas. |
| 07/06/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
This inspection is for excavation/layout rebar for concrete column footings at HL: H/11 (F2), I/11 (F2), J/11 (F4). Ok to place concrete in progress areas. |
| 07/10/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Area A, Elevator #2 footings. Ok to place concrete in progress areas. Column footings (F2, F4) at GL: J/8, L/1O, M/10, L/12, I/12, H/12, G/11, K/10. |
| 09/20/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Plumbing underground in Areas A & B; 4” waste lines. Ok to cover progress areas. |
| 10/12/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
North west portion of Areas A & B. Ok to place concrete in progress areas. |
| 11/03/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Level #1, Area B: Top and bottom rebar mat. Followed plans are per Asst Superintendent Keven, checked as closely as possible. Ok to place concrete in progress areas. |
| 11/06/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Area B, pour #1, top and bottom rebar mesh in place. Ok to place concrete in progress areas. |
| 11/09/2023 |
COT - HCBU - Preslab |
|
Not Ready |
Contractor cancelled. Will reschedule for 13 November |
| 11/13/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Area B placement #2 bottom mat (areas except for West side of slab). |
| 11/16/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Area B - A, placement #2; top rebar mat and hold downs. Ok to place concrete in progress areas. |
| 11/17/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Podium area, placements #3; bottom mat and hold-downs. Ensure all add,on rebars are properly tied down and all hold downs are in place. |
| 11/28/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Level #1, concrete placement #4, bottom mat of double mat rebar system. Ensure hold downs are in place as per plans. Ok to place concrete in progress areas. |
| 11/29/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Area A, Placement #4; Podium area. Ok to place concrete in progress areas. |
| 11/30/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Slab on grade for placement #6. Ok to place concrete in progress areas. |
| 12/07/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Slab areas A and B, pour #5 bottom mat. |
| 12/14/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Bottom mat for Area A/B, pour #6. |
| 12/19/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Podium area,double Matt for placement,#6. Ok to place concrete in progress areas. |
| 12/21/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Podium area at placement #6; information only. |
| 12/28/2023 |
COT - HCBU - Preslab |
|
Partial Pass |
Podium, placement #7 in areas C & D. Ok to place concrete in progress areas. |