Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCPL - Plumbing Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2026 | COT - HCPL - Plumbing Intermediate | Re-inspection required | 1/22/26: nail plates required for electrical and plumbing that come within 1 1/4" from face of 2x, over notched studs both at bearing and non bearing walls must be properly fixed and be addressed prior to next inspection, fire caulking required at all penetrations through top plate and vapor barrier, Properly secure nm cable throughout, receptacle spacing not per approved plans not per code (bedrooms and living rooms) staples required throughout at nm cables coming out of box. units inspected were (402, 426, 428,413,414,415 receptacle at bathroom, 416,418) notes are the same for all. | |
| 02/06/2026 | COT - HCPL - Plumbing Intermediate | Partial Pass | 2/6/26: MEP 4TH FLOOR AREA C 427,425,424,401,408,407,405, 406,404,427,425,424,404,426,428,412,413,414,415,416, 418,417, 419,420 | |
| 02/12/2026 | COT - HCPL - Plumbing Intermediate | Partial Pass | 2/12/26:PLUMBING ABOVE CEILING APPROVED AT T.I RESTAURANTS FIRST FLOOR SOUTH BUILDING SE CORNER | |
| 03/04/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Plumbing in units 242, 246, 247, 248, 257, 259. | |
| 04/30/2026 | COT - HCPL - Plumbing Intermediate | Partial Pass | 309,308,307,305,306,303,302,301. MEP approved in walls. Pending draft stop at all dead spaces. Add sister studs at plumbing walls that have been over notched. 4/30/2026 | |
| 05/01/2026 | COT - HCPL - Plumbing Intermediate | Partial Pass | 5/1/2026 Partial pass. Draft stop corrected in rooms 301,302,303,306,307(added sister studs). 310,311,312,328. Okay to proceed progress areas. Re walk 327 columns 2x |
|
| 05/23/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Section C. 4th floor. 412, 408,407,406,405,404,403,402,401,424, 425,427. DWV and domestic water on test. Okay to proceed progress areas. 5/23/2025 | |
| 06/17/2024 | COT - HCPL - Plumbing Intermediate | Partial Pass | New sewer line, 8” and 6” laterals. | |
| 06/20/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 6-20-25: grease interceptor located at southeast side verified per plans. Okay to continue with construction | |
| 10/23/2024 | COT - HCPL - Plumbing Intermediate | Partial Pass | Domestic water lines at levels 1 - 3. Under hydro test at 140 psi. Ok to drop pressure in lines. | |
| 10/24/2024 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level #1, in wall plumbing in room units; S133, S135, S138, S139, S140, S157, S158, S160. | |
| 10/29/2024 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level #1, in wall plumbing in room units,S141, S143, S144, S148, S159. ok to insulate and cover walls. | |
| 12/12/2023 | COT - HCPL - Plumbing Intermediate | Partial Pass | Information only..plans for plumbing changes. |