Inspection Status: Partial Pass
Inspection History: COT - HCBU - Interior Shear Bracing
Permit Number - T21CM09453
Inspection Description - COT - HCBU - Interior Shear Bracing
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 2/21/25: partial pass for shear walls 2nd floor Area A, | |
| 03/05/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | Level #3, Areas A & B: shear wall system at interior walls in units, exterior walls, hallway walls. Ok to cover progress areas. | |
| 03/12/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | North building shear walls in room units and corridors. Ok to,cover progress areas. | |
| 04/04/2025 | COT - HCBU - Interior Shear Bracing | Not Ready | ||
| 04/11/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 2/21/25: partial pass for shear walls 2nd floor Area A, 4/11/25: 5th floor interior shear walls passed. |
|
| 05/02/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | Building A, Level #3, Room Units 346, 347, 348, 349, 350 sheet rock nailing. Ok to tape progress areas. | |
| 05/05/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | Level #3, Areas A and B ; sheet rock nailing for Room Units; 340, 352, 353, 364, 355, 356, 357, 358, 359, 360. Ok to,tape progress areas. | |
| 05/15/2025 | COT - HCBU - Interior Shear Bracing | Not Ready | ||
| 05/28/2025 | COT - HCBU - Interior Shear Bracing | Re-inspection required | 2/21/25: partial pass for shear walls 2nd floor Area A, 4/11/25: 5th floor interior shear walls passed. 5/28/25: room #431,432,433,434,435,436,438,439,440 inspected. All fasteners shall be no closer than 3/8" from edge of sheathing and shall penetrate no more than 1/8". |
|
| 06/02/2025 | COT - HCBU - Interior Shear Bracing | Not Ready | ||
| 06/04/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/4/2025 partial pass. Units 329,330,331,332,333,334,335,336,337,338,&339. 1st layer at 2hr rated walls approved. Ceilings okay for tape and mud for drop ceilings. Fire caulk all penetrations through ceiling prior to framing. Extend receptacle boxes throughout. Max depth recessed into drywall is 1/4". All fasteners shall be no closer than 3/8" from edge of sheathing and shall penetrate no more than 1/8". | |
| 06/11/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6/11/2025 Drywall Nail at level 4th Section B approved. Okay to proceed with second layer at firewalls. | |
| 06/18/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6-18-25: anchor tie systems/hold-downs at Area C-room's 304, 306, 305, 307, 308, 310, 311, 312, 327, 325, 302, 304 verified per plans. Okay to continue with construction at progress areas. | |
| 06/24/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | Level #1 Stairwell at Levels 1 - 5. Sheet rock nailing in fire truck turn-around area and mechanical room. Ok to,tape first level and apply second layer. | |
| 07/02/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 2/21/25: partial pass for shear walls 2nd floor Area A, 4/11/25: 5th floor interior shear walls passed. 5/28/25: room #431,432,433,434,435,436,438,439,440 inspected. All fasteners shall be no closer than 3/8" from edge of sheathing and shall penetrate no more than 1/8". 6/4/2025 partial pass. Units 329,330,331,332,333,334,335,336,337,338,&339. 1st layer at 2hr rated walls approved. Ceilings okay for tape and mud for drop ceilings. Fire caulk all penetrations through ceiling prior to framing. Extend receptacle boxes throughout. Max depth recessed into drywall is 1/4". All fasteners shall be no closer than 3/8" from edge of sheathing and shall penetrate no more than 1/8". 6/11/2025 Drywall Nail at level 4th Section B approved. Okay to proceed with second layer at firewalls. 6-18-25: anchor tie systems/hold-downs at Area C-room's 304, 306, 305, 307, 308, 310, 311, 312, 327, 325, 302, 304 verified per plans. Okay to continue with construction at progress areas. 7/2/25:drywall fastened per Schedule at rooms 126,171 first layer north walls,122 second layer, |
|
| 07/09/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 2/21/25: partial pass for shear walls 2nd floor Area A, 4/11/25: 5th floor interior shear walls passed. 5/28/25: room #431,432,433,434,435,436,438,439,440 inspected. All fasteners shall be no closer than 3/8" from edge of sheathing and shall penetrate no more than 1/8". 6/4/2025 partial pass. Units 329,330,331,332,333,334,335,336,337,338,&339. 1st layer at 2hr rated walls approved. Ceilings okay for tape and mud for drop ceilings. Fire caulk all penetrations through ceiling prior to framing. Extend receptacle boxes throughout. Max depth recessed into drywall is 1/4". All fasteners shall be no closer than 3/8" from edge of sheathing and shall penetrate no more than 1/8". 6/11/2025 Drywall Nail at level 4th Section B approved. Okay to proceed with second layer at firewalls. 6-18-25: anchor tie systems/hold-downs at Area C-room's 304, 306, 305, 307, 308, 310, 311, 312, 327, 325, 302, 304 verified per plans. Okay to continue with construction at progress areas. 7/2/25:drywall fastened per Schedule at rooms 126,171 first layer north walls,122 second layer, 7/9/25: interior shear wall OSB at S102,S104,S105,S107, commercial (S162,S163,S164,S165),S110, S127, S112, approved. |
|
| 07/11/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | Areas C & D rooms and corridor shear walls. OK to insulate and cover. | |
| 07/21/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 2/21/25: partial pass for shear walls 2nd floor Area A, 4/11/25: 5th floor interior shear walls passed. 5/28/25: room #431,432,433,434,435,436,438,439,440 inspected. All fasteners shall be no closer than 3/8" from edge of sheathing and shall penetrate no more than 1/8". 6/4/2025 partial pass. Units 329,330,331,332,333,334,335,336,337,338,&339. 1st layer at 2hr rated walls approved. Ceilings okay for tape and mud for drop ceilings. Fire caulk all penetrations through ceiling prior to framing. Extend receptacle boxes throughout. Max depth recessed into drywall is 1/4". All fasteners shall be no closer than 3/8" from edge of sheathing and shall penetrate no more than 1/8". 6/11/2025 Drywall Nail at level 4th Section B approved. Okay to proceed with second layer at firewalls. 6-18-25: anchor tie systems/hold-downs at Area C-room's 304, 306, 305, 307, 308, 310, 311, 312, 327, 325, 302, 304 verified per plans. Okay to continue with construction at progress areas. 7/2/25:drywall fastened per Schedule at rooms 126,171 first layer north walls,122 second layer, 7/9/25: interior shear wall OSB at S102,S104,S105,S107, commercial (S162,S163,S164,S165),S110, S127, S112, approved. 7/21/25: Level 3 units in section C approved. |
|
| 08/01/2025 | COT - HCBU - Interior Shear Bracing | Canceled | Contractor cancelled. | |
| 08/06/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | Sheet rock nailing in commercial suites #168, 169. 170, 171, 173, 174. Ok to,tape units throughout. | |
| 08/12/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/12/2025 Unit S175 and 202 screw pattern inspection approved. Okay to proceed progress areas. | |
| 08/13/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 2/21/25: partial pass for shear walls 2nd floor Area A, 4/11/25: 5th floor interior shear walls passed. 5/28/25: room #431,432,433,434,435,436,438,439,440 inspected. All fasteners shall be no closer than 3/8" from edge of sheathing and shall penetrate no more than 1/8". 6/4/2025 partial pass. Units 329,330,331,332,333,334,335,336,337,338,&339. 1st layer at 2hr rated walls approved. Ceilings okay for tape and mud for drop ceilings. Fire caulk all penetrations through ceiling prior to framing. Extend receptacle boxes throughout. Max depth recessed into drywall is 1/4". All fasteners shall be no closer than 3/8" from edge of sheathing and shall penetrate no more than 1/8". 6/11/2025 Drywall Nail at level 4th Section B approved. Okay to proceed with second layer at firewalls. 6-18-25: anchor tie systems/hold-downs at Area C-room's 304, 306, 305, 307, 308, 310, 311, 312, 327, 325, 302, 304 verified per plans. Okay to continue with construction at progress areas. 7/2/25:drywall fastened per Schedule at rooms 126,171 first layer north walls,122 second layer, 7/9/25: interior shear wall OSB at S102,S104,S105,S107, commercial (S162,S163,S164,S165),S110, S127, S112, approved. 7/21/25: Level 3 units in section C approved. 8/12/2025 Unit S175 and 202 screw pattern inspection approved. Okay to proceed progress areas. 8/13/25: rooms 123A-126-129-131-132 above ceiling screw pattern approved. |
|
| 08/21/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 8/21/25: interior shear bracing approved in units. Section A531, 532, 534,533,535,536,538,539,540,541,560,559,558,557,556,555,554,553,551,550,548,549 | |
| 09/18/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 9/18/2025 519,515,514,512,526,528,527. Area D. 5th floor. (Osb) shear wall at party walls. Okay to proceed progress areas. | |
| 09/30/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 3rd floor section D. OSB interior shear bracing approved. Okay to proceed progress areas. 9/30/2025 | |
| 10/06/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | Level #2; Section D; shear walls in rooms and corridors at 202, 203, 205, 207, 209, 210, 212, 214, 217, 219, 222, 224, 228. Sheet rock nailing in Rooms 352, 343, 445, 447; OK to tape and texture progress areas. | |
| 10/30/2025 | COT - HCBU - Interior Shear Bracing | Re-inspection required | 10/30/25: all penetrations must be properly sealed. NB-L1---112; 113; 124; 125; SB-L1---142 |
|
| 11/03/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 11/3/2025 Partial pass. SB-L5 units 508,507,506,505,503,502,501,524. Okay to proceed with progress areas. | |
| 11/20/2025 | COT - HCBU - Interior Shear Bracing | Re-inspection required | 11/20/25: NOT READY, FASTENERS SHALL BE NO CLOSER THAN 3/8" from edge, SHALL PENETRATE NO MORE THAN 1/8". | |