Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Plumbing Progress
Permit Number - T21CM09453
Inspection Description - COT - HCPL - Plumbing Progress
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/17/2024 | COT - HCPL - Plumbing Progress | Partial Pass | North side of structure, 8” sewer line with 6” laterals to new man hole. mom to cover progress areas. | |
06/18/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Sewer line (8”) with 5 laterals (6”) at North side of building center to West side. Ok to compact and back fill progress areas. | |
06/21/2024 | COT - HCPL - Plumbing Progress | Partial Pass | North side sewer lines at private man hole. Pressure tested at both sides. Ok to cover progress areas. | |
07/12/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Sewer lines (4” and 8”) and laterals on North side of building. Ok to cover progress areas. | |
07/17/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Fire truck turn-around area; 2” - 4” vent and drain lines. Ok to cover progress areas. | |
08/09/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Swimming pool equipment room plumbing. Ok to cover progress areas. | |
09/29/2023 | COT - HCPL - Plumbing Progress | Partial Pass | Plumbing underground: waste lines at 4” - 8’ lines in section C. Ok to cover progress areas. | |
10/23/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Waste lines in South portion of structure (2” - 4” lines) | |
10/24/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Level #1, plumbing bang plates installed in room units; S133, S135, S138, S139, S140, S157, S158, S160. | |
10/29/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Level #1, room units S141, S143, S144, S148, S159. | |
12/06/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Domestic water lines on Levels 3, 4, 5 in sections A and B. Lines under test at 110 psi. |