| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2025 | COT - HCPL - Plumbing Progress | Not Ready | Will reschedule for 6 March. | |
| 05/27/2025 | COT - HCPL - Plumbing Progress | Partial Pass | Domestic water lines (pex) at Level #4, section D:,room units 413, 426, 428. Level #5 Section D: all room units in this section. | |
| 05/28/2025 | COT - HCPL - Plumbing Progress | Partial Pass | 5/28/25: DVW at west 1st floor exterior porch under test ok to proceed. Pending east exterior porch first floor | |
| 06/05/2025 | COT - HCPL - Plumbing Progress | Partial Pass | DWV. level 3,2,1 south building pressure test sewer top out area C. Pex pressure test. 102,101,103,104,110,111,112,125,124,127. Okay to proceed progress areas. 6/5/2025 |
|
| 06/09/2025 | COT - HCPL - Plumbing Progress | Partial Pass | Section D Levels 1-3. DWV and pex on test. Rooms 105&107 included. 6/9/2025 | |
| 06/17/2024 | COT - HCPL - Plumbing Progress | Partial Pass | North side of structure, 8” sewer line with 6” laterals to new man hole. mom to cover progress areas. | |
| 06/18/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Sewer line (8”) with 5 laterals (6”) at North side of building center to West side. Ok to compact and back fill progress areas. | |
| 06/21/2024 | COT - HCPL - Plumbing Progress | Partial Pass | North side sewer lines at private man hole. Pressure tested at both sides. Ok to cover progress areas. | |
| 07/12/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Sewer lines (4” and 8”) and laterals on North side of building. Ok to cover progress areas. | |
| 07/17/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Fire truck turn-around area; 2” - 4” vent and drain lines. Ok to cover progress areas. | |
| 08/09/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Swimming pool equipment room plumbing. Ok to cover progress areas. | |
| 09/29/2023 | COT - HCPL - Plumbing Progress | Partial Pass | Plumbing underground: waste lines at 4” - 8’ lines in section C. Ok to cover progress areas. | |
| 10/23/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Waste lines in South portion of structure (2” - 4” lines) | |
| 10/24/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Level #1, plumbing bang plates installed in room units; S133, S135, S138, S139, S140, S157, S158, S160. | |
| 10/29/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Level #1, room units S141, S143, S144, S148, S159. | |
| 12/06/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Domestic water lines on Levels 3, 4, 5 in sections A and B. Lines under test at 110 psi. | |
| 12/16/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Parking garage waste and vent lines: 2” - 10”. Hose bib lines need to tested. | |
| 12/23/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Domestic main lines (3” - 4”) in parking garage. Hose bibs to be installed when RFI,is,received. |