Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCPL - Plumbing Above Ceiling
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2026 | COT - HCPL - Plumbing Above Ceiling | Not Ready | ||
| 02/23/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | Commercial suites at North Building. Ok to set ceiling tiles. | |
| 03/09/2026 | COT - HCPL - Plumbing Above Ceiling | Not Ready | ||
| 04/09/2026 | COT - HCPL - Plumbing Above Ceiling | Re-inspection required | 4-9-26: MEP's at 1st. floor corridor (south side Courtyard A)-fire caulk penetrations at west end of corridor and above elevator, add supports to DWV at intervals of 4', add clamps to secure AWG wires every 4', fire caulk horizontal penetrations at corridor rated walls. Room's 508, 507-flex is severely crush and repairs shall be made to avoid loss of airflow, 506-add a support to exhaust in bedroom to avoid sagging, 505-seal opening above ceiling with drywall at bedroom, add supports to hvac whip and remove from ceiling grid. Per NEC 300.1.1(B), awg wires cannot be zip tied to ceiling grids-make corrections by adding supports using an independent approved method (applies to room's 508, 507, 506, and 505). | |
| 04/14/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | 4/14/26: ABOVE CEILING IN CORRIDOR A approved in north building ok to proceed. | |
| 04/22/2025 | COT - HCPL - Plumbing Above Ceiling | Canceled | ||
| 04/28/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | Above at drop ceilings approved in rooms 527,525,524,501,502,503,506,508. Okay to proceed progress areas. Re walk 504,505,507 4/28/2026 |
|
| 04/29/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | 4/29/2026 Re walk 504,507,515,520 505,528,512,513,514,517,518,519 401&402 in wall MEP approved. |
|
| 05/01/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | 5/1/2026 All corrections were made in rooms 504,507,515. Above ceiling at drop lids. Pending 520. Okay to proceed progress areas. |
|
| 05/07/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | 5/7/2026 partial pass. Commercial unit 119 above ceiling and 520. 121 not ready. |
|
| 06/01/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | 6/1/2026 partial pass. 5th floor all corridors approved. | |
| 06/02/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | 6/1/2026 partial pass. 5th floor all corridors areas need fire caulking or rock wool. 6/2/2026 partial pass. 5th floor all corridors corrections were completed. Okay to proceed progress areas. |
|
| 06/17/2025 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | 6-17-25: plumbing above ceiling in room's (pex lines) 531, 532, 534, 533, 535, 536, 538 verified per plans and under test. Penetrations at top plates fire caulked and pex lines properly supported. Okay to continue with construction at progress areas. | |
| 07/16/2026 | COT - HCPL - Plumbing Above Ceiling | Not Ready | ||
| 07/28/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | 7-28-26: Inspection of MEP's above ceiling at garage entryway- add ground screws to 6-metal boxes. Penetrations above ceiling grid properly fire caulked and DWV supported. Will need to verify ground screws but okay to continue with construction at progress areas. | |
| 08/01/2025 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | Domestic water lines and fire sprinkler lines in trash chutes on Level #5. | |
| 08/27/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | 8/27/2026 partial pass. Drop ceilings 5th floor unit 526. 4th floor unit 408 approved. Okay to proceed progress areas. | |
| 09/03/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | 9-3-26: above ceiling MEP's at 408, 407, 405, 406-ground screw required at metal junction box at living room, 404-add straps to restroom exhaust, make corrections to dev above ceiling at living room and fire caulk penetrations, 403, 402-ground metal pancake boxes above ceiling, 401-ground metal pancake boxes, 424-ground pancake boxes, 425-ground pancake boxes, 426-ground screw at metal junction boxes, 428-same, 427-same | |
| 09/04/2026 | COT - HCPL - Plumbing Above Ceiling | Re-inspection required | 9-4-26: 412-move smoke detector over away from ceiling grid, 413, 414-secure line set from grid, 415-secure exhaust in bedroom, 416-secure line set from grid in living room, 418-remove line set from ceiling grid. Have electricians walk units from 9/3/26 and ground all metal boxes above ceiling. Stopped inspection-additional items may be noted. | |
| 09/09/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | 9/9/26: MEP's above ceiling at room's 407, 406, 405, 404, 403, 402, 401, 424, 425, 426, 428, 427, 412, 413, 414, 415, 416, 418, 417, 419, 420, 424, 161. Okay to continue with construction at progress areas. | |
| 09/16/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | ||
| 09/18/2026 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | ||
| 10/16/2024 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | Level #1, Area B, rooms 131 and 142 waste lines for tubs above. | |
| 10/24/2024 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | Level #1, Room,units S133, S135, S138, S139, S140, S157, S158, S160. | |
| 10/29/2024 | COT - HCPL - Plumbing Above Ceiling | Partial Pass | Level #1, room units S131, S143< S144, S148, S159. |