Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address:
165 S LINDA AV
Apply Date:
12/12/2021
Applicant:
Brian Bready
Description:
New Apartment Building with Underground Parking

Permit Reviews

Permit Number - T21CM09453
Permit Status: Issued
Permit Description: New Apartment Building with Underground Parking
Start Date Submittal Complete Date Status  
02/12/2022 RESUBMITTAL - TI ALL 03/18/2022 COMPLETED Review Details
04/01/2022 RESUBMITTAL 05/13/2022 COMPLETED Review Details
05/13/2022 RESUBMITTAL 06/28/2022 COMPLETED Review Details
12/12/2021 COMMERCIAL - NEW 02/02/2022 COMPLETED Review Details
12/12/2022 COMMERCIAL REVIEW - FULL v.1 01/23/2023 APPROVED Review Details
04/24/2023 COMMERCIAL REVIEW - FULL v.1 05/18/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T21CM09453
Permit Status: Issued
Permit Description: New Apartment Building with Underground Parking
Total Outstanding Activity Conditions - 13
Date Name
01/23/2023 Prior to final verify impact fees have been addressed.
06/28/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/28/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
06/28/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/28/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/28/2022 SHOP DRAWINGS REQUIRED FOR TRUSSES
06/28/2022 SHOP DRAWINGS REQUIRED FOR SPRINKLER SYSTEM.
06/28/2022 SHOP DRAWINGS REQUIRED FOR RADIO COVERAGE SYSTEM.
10/05/2022 ISSUED WITH PCRWRD & PDEQ CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWER G-2022-047/#P22WI00020 IS ACCEPTED AND RELEASED BY PCRWRDNO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE TWO PUBLIC SEWER MANHOLE TAP PERMITS TO IMS ID: 2011-010-05 ARE ACCEPTED AND RELEASED BY PCRWRD. NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PRIVATE SEWER #P22SD0074 IS ISSUED A DISCHARGE AUTHORIZATION BY PDEQ

Conditions

Permit Number - T21CM09453
Permit Status: Issued
Permit Description: New Apartment Building with Underground Parking
Date Description Comments
10/05/2022 NEED WASTE WATER RECEIPT

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM09453
Permite Description: New Apartment Building with Underground Parking
Total Outstanding Inspections - 17
Last Inspection Date Description Inspector Results Comments
05/11/2022 COT - FCON - Fire - Final N/A Re-inspection required {Activity date: 05/11/2022; Status: Prior to Final Inspectn; Inspector: JPEEL-DAVIS; Comment: Entered by JPEELDA1 - Initial permit fees include 10 hours of inspections}
06/28/2022 COT - HCME - Mechanical Final N/A Re-inspection required {Activity date: 06/28/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION}
06/28/2022 COT - HCPL - Plumbing Final N/A Re-inspection required {Activity date: 06/28/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION}
06/23/2023 COT - HCBU - Building Final N/A Not Ready Contractor cancelled.
07/06/2023 COT - HCBU - Preslab N/A Partial Pass This inspection is for excavation/layout rebar for concrete column footings at HL: H/11 (F2), I/11 (F2), J/11 (F4). Ok to place concrete in progress areas.
06/23/2023 COT - HCBU - Building Progress N/A Not Ready Contractor cancelled.
12/08/2023 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Podium areas A & B, placement #5 top mat. Ok to place concrete in progress areas.
10/10/2024 COT - HCEL - Electrical Underground N/A Partial Pass SES conduit lines (4”): 15 lines on North side of building, and 15 lines on South side of building. Ensure that marking tape is in place before,covering progress atres.
10/24/2024 COT - HCEL - Electrical Final N/A Not Ready Inspection to be requested at a later date.
12/12/2023 COT - HCPL - Plumbing Intermediate N/A Partial Pass Information only..plans for plumbing changes.
10/29/2024 COT - HCPL - Plumbing Above Ceiling N/A Partial Pass Level #1, room units S131, S143< S144, S148, S159.
04/19/2024 COT - HCBU - Framing N/A Partial Pass Information,walk through in areas A & B Level #1: All hardware must be installed before framing at Level #2 in a designated area. Areas in question must be inspected before progressing to next level.
12/06/2024 COT - HCPL - Plumbing Progress N/A Partial Pass Domestic water lines on Levels 3, 4, 5 in sections A and B. Lines under test at 110 psi.
12/10/2024 COT - HCEL - Electrical Above Ceiling N/A Partial Pass Level #2, Room units: S229, S230, S231, S232, S233, S234, S235, S236, S238, S239, S240, S241, S256, S258, S260
12/10/2024 COT - HCEL - Electrical Intermediate N/A Partial Pass Level #2 Room units: S229, S230, S231, S232, S233, S234, S235, S236, S238, S239, S240, S241, S256,S258, S260
12/06/2024 COT - HCEL - Electrical Progress N/A Not Ready Contractor cancelled; will reschedule for 9 December
12/10/2024 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Partial Pass Level #2 Room units: S229, S230, S231, S232, S233, S234, S235, S236, S238, S239, S240, S241, S256, S258, S260.

Completed Inspections

Permit Status: Issued
Permit Number: T21CM09453
Permit Description: New Apartment Building with Underground Parking
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/17/2024 COT - HCPL - Rough Soil Passed
06/17/2024 COT - HCPL - Sewer Passed

Documents

File Name Document Type  
REV1_PLAN SET_V1.PDF DOCUMENTS VIEW
CONS-SAFEBUILT APPROVED STAMPED_PLAN SET_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REV1_PLAN SET_V1.PDF DOCUMENTS VIEW
REV1_REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
4_ELEVATOR SHAFT COOLING SYSTEM APPROVAL LETTER_V1.PDF DOCUMENTS VIEW
APPLICATION_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SAFEBUILT APPROVED STAMPED_PLAN SET_V1.PDF DOCUMENTS VIEW
IECC CERTIFICATE - LIGHTING_V1.PDF DOCUMENTS VIEW
LETTER FROM CLAYTON_V1.PDF DOCUMENTS VIEW
MECHANICAL LOAD COMPLIANCE_V1.PDF DOCUMENTS VIEW
MECHANICAL LOAD COMPLIANCE2_V1.PDF DOCUMENTS VIEW
SIC-2022-12-12_V1.PDF DOCUMENTS VIEW
SOILS REPORT_BAUTISTA PLAZA_V1.PDF DOCUMENTS VIEW
STRUCTURAL CALCS VOLUME 1_V1.PDF DOCUMENTS VIEW
STRUCTURAL CALCS VOLUME 2_V1.PDF DOCUMENTS VIEW