Permit: T21CM09453
Permit Details
Apply Date:
12/12/2021
Applicant:
Description:
New Apartment Building with Underground Parking
Permit Reviews
Permit Number - T21CM09453
Permit Status: Inspections
Permit Description: New Apartment Building with Underground Parking
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/12/2022 | RESUBMITTAL - TI ALL | 03/18/2022 | COMPLETED |
| 04/01/2022 | RESUBMITTAL | 05/13/2022 | COMPLETED |
| 05/13/2022 | RESUBMITTAL | 06/28/2022 | COMPLETED |
| 12/12/2021 | COMMERCIAL - NEW | 02/02/2022 | COMPLETED |
| 12/12/2022 | COMMERCIAL REVIEW - FULL v.1 | 01/23/2023 | APPROVED |
| 04/24/2023 | COMMERCIAL REVIEW - FULL v.1 | 05/18/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T21CM09453
Permit Status: Inspections
Permit Description: New Apartment Building with Underground Parking
Total Outstanding Activity Conditions - 13
| Date | Name |
|---|---|
| 01/23/2023 | Prior to final verify impact fees have been addressed. |
| 06/28/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 06/28/2022 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. |
| 06/28/2022 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 06/28/2022 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
| 06/28/2022 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
| 06/28/2022 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 06/28/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 06/28/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 06/28/2022 | SHOP DRAWINGS REQUIRED FOR TRUSSES |
| 06/28/2022 | SHOP DRAWINGS REQUIRED FOR SPRINKLER SYSTEM. |
| 06/28/2022 | SHOP DRAWINGS REQUIRED FOR RADIO COVERAGE SYSTEM. |
| 10/05/2022 | ISSUED WITH PCRWRD & PDEQ CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWER G-2022-047/#P22WI00020 IS ACCEPTED AND RELEASED BY PCRWRDNO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE TWO PUBLIC SEWER MANHOLE TAP PERMITS TO IMS ID: 2011-010-05 ARE ACCEPTED AND RELEASED BY PCRWRD. NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PRIVATE SEWER #P22SD0074 IS ISSUED A DISCHARGE AUTHORIZATION BY PDEQ |
Conditions
Permit Number - T21CM09453
Permit Status: Inspections
Permit Description: New Apartment Building with Underground Parking
| Date | Description | Comments |
|---|---|---|
| 10/05/2022 | NEED WASTE WATER RECEIPT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: T21CM09453
Permite Description: New Apartment Building with Underground Parking
Total Outstanding Inspections - 25
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2022 | COT - FCON - Fire - Final | N/A | Re-inspection required | {Activity date: 05/11/2022; Status: Prior to Final Inspectn; Inspector: JPEEL-DAVIS; Comment: Entered by JPEELDA1 - Initial permit fees include 10 hours of inspections} |
| 06/28/2022 | COT - HCME - Mechanical Final | N/A | Re-inspection required | {Activity date: 06/28/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION} |
| 06/28/2022 | COT - HCPL - Plumbing Final | N/A | Re-inspection required | {Activity date: 06/28/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION} |
| 06/23/2023 | COT - HCBU - Building Final | N/A | Not Ready | Contractor cancelled. |
| 07/06/2023 | COT - HCBU - Preslab | N/A | Partial Pass | This inspection is for excavation/layout rebar for concrete column footings at HL: H/11 (F2), I/11 (F2), J/11 (F4). Ok to place concrete in progress areas. |
| 10/24/2024 | COT - HCEL - Electrical Final | N/A | Not Ready | Inspection to be requested at a later date. |
| 12/23/2024 | COT - HCPL - Gas Pressure Test | N/A | Partial Pass | Gas lines pressure tested at 15 psi. Not ready for a meter set at this time |
| 01/31/2025 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | East pool/retaining CMU wall at 4’ - 8’. Ok to place grout in progress areas. |
| 05/15/2025 | COT - HCBU - Roof Nailing | N/A | Partial Pass | 5/15/25: roof at bridge per plans ok to proceed with crickets]. |
| 05/27/2025 | COT - HCPL - Plumbing Roof Drains | N/A | Partial Pass | Roof drains #1, 2, 3, 5: under hydro test. |
| 05/28/2025 | COT - HCME - Mechanical Above Ceiling | N/A | Canceled | |
| 12/13/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | Level #2, Area B, Room units; S243, S244, S245, S249, S250, S251, S252, S253, S254, S255. |
| 05/27/2025 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | Domestic water lines (pex) at Level #4, section D:,room units 413, 426, 428. Level #5 Section D: all room units in this section. |
| 12/12/2023 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | Information only..plans for plumbing changes. |
| 05/01/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 3/19/25: section A rooms, 431,432,434,433,435,436,439,440 ( Not ready will need to re-inspect rooms) 3/25/25: Section A 4th floor rooms (441,460,459,458,457,456) not ready multiple issues need to be addressed prior to re-inspection. 3rd floor room 352 not ready 3/28/25: Section B 4th floor rooms (455,454,453,452,451,450,449,448,446) Not ready multiple issues need to be addressed prior to re-inspection. 4/3/25: Re-inspection required with fee 5/1/25: Electrical intermediate in rooms 557,558,559,560,536 approved. |
| 05/13/2025 | COT - HCEL - Electrical Progress | N/A | Not Ready | 3/19/25: section A rooms, 431,432,434,433,435,436,439,440 ( Not ready will need to re-inspect rooms) 3/25/25: Section A 4th floor rooms (441,460,459,458,457,456) not ready multiple issues need to be addressed prior to re-inspection. 3rd floor room 352 not ready 3/28/25: Section B 4th floor rooms (455,454,453,452,451,450,449,448,446) Not ready multiple issues need to be addressed prior to re-inspection. 4/3/25: Re-inspection required with fee 5/1/25: Electrical intermediate in rooms 557,558,559,560,536 approved. 5/13/25:not ready |
| 06/23/2025 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | |
| 04/22/2025 | COT - HCPL - Plumbing Above Ceiling | N/A | Canceled | |
| 10/10/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | SES conduit lines (4”): 15 lines on North side of building, and 15 lines on South side of building. Ensure that marking tape is in place before,covering progress atres. |
| 10/23/2025 | COT - HCBU - Building Progress | N/A | Partial Pass | 10/23/25: electrical in wall approved in rooms 512,513,514,515,518,517, 520,519, south building. |
| 10/16/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Large planters in central courtyard: concrete placed as per plans. |
| 08/05/2025 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | Strapping at Levels 3 - 5 courtyard in section D. |
| 09/25/2025 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | Level #5, Section A: Room units 531 - 568. Ok to sheet rock ceiling areas. South exterior of building at Levels 1 - 5; exterior sheathing, Ok to cover progress areas. |
| 10/30/2025 | COT - HCBU - Interior Shear Bracing | N/A | Re-inspection required | 10/30/25: all penetrations must be properly sealed. NB-L1---112; 113; 124; 125; SB-L1---142 |
| 10/30/2025 | COT - HCBU - Framing | N/A | Partial Pass | 10/30/25: Commercial units # 166; 165; 164; 163; 162; 161 c-channels installed ok to proceed. |
Completed Inspections
Permit Status: Inspections
Permit Number: T21CM09453
Permit Description: New Apartment Building with Underground Parking
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2024 | COT - HCPL - Rough Soil | Passed | ||
| 06/17/2024 | COT - HCPL - Sewer | Passed |
Scheduled Inspections
Scheduled Inspections - T21CM09453
Status: Inspections
Description: New Apartment Building with Underground Parking
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 12/05/2025 | COT - HCBU - Framing | Scheduled | |
| 12/05/2025 | COT - HCBU - Interior Shear Bracing | Scheduled |