Permit: TC-COM-1224-02387
Permit Details
Apply Date:
12/23/2024
Applicant:
Alex Pillion
Description:
New 84-unit affordable housing, apartment building.
Permit Reviews
Permit Number - TC-COM-1224-02387
Permit Status: Complete
Permit Description: New 84-unit affordable housing, apartment building.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/23/2026 | SPECIAL INSPECTION REVIEW v.1 | 09/23/2026 | APPROVED |
| 12/23/2024 | COMMERCIAL REVIEW - FULL v.1 | 01/14/2025 | REQUIRES RESUBMIT |
| 01/24/2025 | COMMERCIAL REVIEW - FULL v.2 | 02/12/2025 | REQUIRES RESUBMIT |
| 09/25/2025 | RESTAMP - COMMERCIAL v.1 | 09/26/2025 | APPROVED |
| 02/19/2025 | COMMERCIAL REVIEW - FULL v.3 | 03/04/2025 | REQUIRES RESUBMIT |
| 03/07/2025 | COMMERCIAL REVIEW - FULL v.4 | 03/11/2025 | APPROVED |
| 09/22/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/23/2026 | APPROVED |
| 05/05/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/05/2025 | APPROVED |
| 04/15/2025 | RESTAMP - COMMERCIAL v.1 | 04/21/2025 | APPROVED |
| 06/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/01/2025 | APPROVED |
| 03/11/2025 | RESTAMP - COMMERCIAL v.1 | 03/27/2025 | APPROVED |
| 08/27/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 09/05/2025 | APPROVED |
Conditions
Permit Number - TC-COM-1224-02387
Permit Status: Complete
Permit Description: New 84-unit affordable housing, apartment building.
| Date | Description | Comments |
|---|---|---|
| 12/23/2024 | Plans on Permit Application need to match address on Construction Plans prior to issuance. Please feel free to contact me if you have any questions or concerns regarding these comments. Thank you - Doris Benoit 520.633.9084 Doris.Benoit@Tucsonaz.gov | |
| 03/10/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 05/05/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/22/2026 | ELEVATOR INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 12/23/2024 | Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection. | |
| 03/10/2025 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 03/10/2025 | Masonry Inspection Report submittal review is required. | |
| 07/22/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 03/10/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 12/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/10/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 03/10/2025 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 07/22/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-1224-02387
Permite Description: New 84-unit affordable housing, apartment building.
Total Outstanding Inspections - 22
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/29/2025 | COT - HCBU - Building Progress | N/A | Re-inspection required | 12-29-25: drywall shear inspection on room's 314-320. Add screws 7" o.c. Field and along edges. Add screws where screws are 3/8" from edges/joints and cannot over penetrate more than 1/32". |
| 08/07/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 8/7/2025 area B okay for concrete placement. |
| 10/31/2025 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 10-31-25: Section B Stairwell exterior sheathing verified at 4" at edges/joints & 12" o.c. In the field (ground level -3rd level) & CS Straps at openings. Verified Section B South Stairwell joists, LVL stringers, Simpson LUS hangers & required A35's per S3.11 detail 10 together with required holds as per shear wall schedule. Missing fireblocking at stair stringers-see 718.2.4 of the IBC for details and add nails to interior stairwell sheathing where nails over-penetrate more than 1/8" and are installed closer than 3/8" at joints. A re-inspection is required for mentioned items but okay to continue with construction at progress areas. |
| 10/10/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | 10-10-25: precon meeting to discuss firewall/firestop expectations. Soffits areas will be partially dry walled to allow for mechanical & plumbing equipment and will be inspected at each unit. |
| 10/31/2025 | COT - HCBU - Framing | N/A | Partial Pass | 10-31-25: verified exterior nailing for end of roof sheathing & and top of roof nailing for Section B South stairs. Okay to continue construction at progress areas. |
| 11/25/2025 | COT - HCBU - Roof Nailing | N/A | Partial Pass | 11/25/2025 Partial pass. roof nailing for first floor roof east side near elevator shaft and elevator shaft. |
| 12/09/2025 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 12-9-25: verified 4-4" schedule 40 electrical conduits for SES 2 located on northeast side of building. |
| 08/27/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | 8-27-26: not applicable. |
| 02/11/2026 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 2-11-26: MEP' s at room's 121, 113, 122, 123-seal penetrations at marked locations, add Boca plates in restroom, 112-add bank plate marked locations,111-fire foam at top plate subpanel, 124. Fire foam penetrations in majority of units where hvac line sets penetrate exterior walls, and fix broken or damaged decking areas marked with an X.Okay to cover soffits on south side up to 121. Drywall screw inspection room's 210, 226, 209, 226, 208-okay to tape & texture progress areas but reschedule MEP's to verify corrections. |
| 02/11/2026 | COT - HCME - Mechanical Progress | N/A | Partial Pass | 2-11-26: MEP' s at room's 121, 113, 122, 123-seal penetrations at marked locations, add Boca plates in restroom, 112-add bank plate marked locations,111-fire foam at top plate subpanel, 124. Fire foam penetrations in majority of units where hvac line sets penetrate exterior walls, and fix broken or damaged decking areas marked with an X.Okay to cover soffits on south side up to 121. Drywall screw inspection room's 210, 226, 209, 226, 208-okay to tape & texture progress areas but reschedule MEP's to verify corrections. |
| 08/27/2026 | COT - HCPL - Gas Final | N/A | Not Applicable | 8-27-26: not applicable. |
| 02/11/2026 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 2-11-26: MEP' s at room's 121, 113, 122, 123-seal penetrations at marked locations, add Boca plates in restroom, 112-add bank plate marked locations,111-fire foam at top plate subpanel, 124. Fire foam penetrations in majority of units where hvac line sets penetrate exterior walls, and fix broken or damaged decking areas marked with an X.Okay to cover soffits on south side up to 121. Drywall screw inspection room's 210, 226, 209, 226, 208-okay to tape & texture progress areas but reschedule MEP's to verify corrections. |
| 12/23/2025 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 12-23-25: Level 2-Section A tub test room 201-shower not installed, 228-ADA missing shower. 3rd level tub test-328 not ready and room 304 verified under test. Okay to continue with construction at progress areas. |
| 08/27/2026 | COT - HCPL - Plumbing Roof Drains | N/A | Not Applicable | 8-27-26: not applicable. |
| 09/15/2026 | HCBU - Preslab and Floodplain Inspection | N/A | Not Applicable | 9/15/26: not applicable. |
| 09/15/2026 | COT - HCPL - Gas Pressure Test | N/A | Not Applicable | 9/15/26: not applicable. |
| 12/17/2025 | COT - HCPL - Sewer | N/A | Partial Pass | 12-17-25: verified trench depth on a 6" SDR35 PVC sewer line located on south end of site at the connection point to manhole. Okay to backfill progress areas. |
| 11/17/2025 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | 11-17-25: Mechanical & DWV supports above ceiling for room's 317, 316, 315, 318, 319, 314, 320, C09, 321, 313, 322, 312, 323, 324, 311. Okay to spray foam 10" above ceiling. |
| 05/05/2026 | BULD - Electrical Clearance | N/A | Partial Pass | 5-5-26: okay to energize SES3 & unit's 311, 312, 313, 314, 315, 316, 317, 318, 319, 320, 321, 322, 323, 324. ECO clearance issued to TEP. NOTE: verified ground-okay to pour back. |
| 09/11/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | Elevator report shall be provided, Egress path on west side shall be finished, construction fence shall be removed. |
| 09/25/2026 | COT - HCBU - Building Final | N/A | Partial Pass | Okay to apply for Level 4 TCO. Site is Almost complete. Stabilized DG sidewalk on west side will be done today and other sidewalk panels at Cleanouts is poured. Reschedule this inspection when complete. |
| 09/25/2026 | COT - HCBU - CofO | N/A | Partial Pass | Okay to apply for Level 4 TCO. Site is Almost complete. Stabilized DG sidewalk on west side will be done today and other sidewalk panels at Cleanouts is poured. Reschedule this inspection when complete. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-1224-02387
Permit Description: New 84-unit affordable housing, apartment building.
Total Completed Inspections - 34
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2025 | COT - HCBU - Masonry Pregrout | Passed | 9-25-25: reinforcement at elevator shaft walls verified per plans-top out at 34'. | |
| 02/09/2026 | COT - HCME - Mechanical Intermediate | Passed | 2/9/26:First floor Section B MEP Rooms 117, 116, 118, 115,114,119,120 | |
| 02/27/2026 | COT - HCBU - Building Progress | Passed | 2-27-26: drywall screw inspection room's 116, 117, 118, 115, 119, 120. Okay to tape & texture progress areas | |
| 08/26/2026 | COT - HCBU - Excavation/Rebar/Zoning | Passed | 8-26-26: previously inspected & approved. | |
| 08/26/2026 | COT - HCBU - Exterior Clips/Sheathing | Passed | 8-26-26: approved. | |
| 08/26/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | 8-26-26: approved. | |
| 08/26/2026 | COT - HCBU - Framing | Passed | 8-26-26: previously inspected & approved. | |
| 08/26/2026 | COT - HCBU - Preslab | Passed | 8-26-26: previously inspected & approved. | |
| 08/26/2026 | COT - HCBU - Roof Nailing | Passed | 8-26-26: approved. | |
| 08/26/2026 | COT - HCPL - Rough Soil | Passed | 8-26-26: previously inspected & approved. | |
| 08/26/2026 | COT - HCEL - Electrical Underground | Passed | 8-26-26: electrical underground approved. | |
| 08/26/2026 | COT - HCEL - Grounding/Bonding | Passed | 8-26-26: previously inspected & approved. | |
| 08/27/2026 | COT - HCEL - Electrical Above Ceiling | Passed | 8-27-26: previously inspected & approved. | |
| 08/27/2026 | COT - HCEL - Electrical Intermediate | Passed | 8-27-26: electrical intermediate approved. | |
| 08/27/2026 | COT - HCEL - Electrical Progress | Passed | 8-27-26: electrical progress approved. | |
| 08/27/2026 | COT - HCME - Mechanical Above Ceiling | Passed | 8-27-26: previously inspected & approved. | |
| 08/27/2026 | COT - HCME - Mechanical Progress | Passed | 8-27-26: mechanical progress approved. | |
| 08/27/2026 | COT - HCPL - Plumbing Above Ceiling | Passed | 8-27-26: plumbing above ceiling approved. | |
| 08/27/2026 | COT - HCPL - Plumbing Intermediate | Passed | 8-27-26: plumbing intermediate approved. | |
| 08/27/2026 | COT - HCPL - Plumbing Progress | Passed | 8-27-26: plumbing progress approved. | |
| 09/11/2026 | COT - FCON - Alarm - Final | Passed | ||
| 09/11/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 09/11/2026 | TRSP - ROW - Notice of Completion | Passed | ||
| 09/15/2026 | COT - HCPL - Sewer | Passed | 9/15/26: previously inspected & approved. | |
| 09/15/2026 | COT - HCEL - Outdoor Lighting | Passed | 9/15/26: outdoor lighting approved. | |
| 09/15/2026 | COT - HCBU - Building Above Ceiling | Passed | 9/15/26: rooftop electrical, plumbing & mechanical approved. | |
| 09/15/2026 | BULD - Electrical Clearance | Passed | 9/15/26: previously inspected & approved. | |
| 09/25/2026 | COT - HCPL - Plumbing Final | Passed | ||
| 09/25/2026 | COT - HCME - Mechanical Final | Passed | ||
| 09/25/2026 | COT - HCEL - Electrical Final | Passed | ||
| 09/29/2026 | COT - FCON - Fire - Final | Passed | ||
| 10/01/2026 | ENGR Engineering Final | Passed | ||
| 10/01/2026 | COT - HCBU - Building Final | Passed | ||
| 10/01/2026 | COT - HCBU - CofO | Passed |