Permit: TC-COM-1224-02387

Parcel: 13815015C


Addresses:

6675 S 12TH AV

Inspection Status: Re-inspection required

Inspection History: COT - HCPL - Plumbing Final 

Date Description Inspector Results Comments
07/23/2026 COT - HCPL - Plumbing Final  Re-inspection required 7-23-26: building final at room's 320-add insulation to hot copper side of water heater and missing panel schedule, missing shower head. 319-same, 314-same, 315-missing shower head, panel schedule and insulation at hot copper line of water heater, 318-missing electrical cover at kitchen receptacle, missing panel schedule, and insulation at hot copper line of water heater, 317-missing insulation to hot leg of water heater, shower head and panel schedule, 316-missing stove, shower head, panel schedule and insulation to hot leg of copper at water heater.
Note: exterior mechanical was not inspected.
07/27/2026 COT - HCPL - Plumbing Final  Partial Pass 7-27-26: verified MEP's ( diffuser/light) at 2nd floor corridor by elevator. Finals at South-wing Rooftop- missing permanent labeling at disconnects. Disconnect labels shall identify purpose and circuit, complete UV taping of HVAC line sets and paint all PVC
07/28/2026 COT - HCPL - Plumbing Final  Re-inspection required 7-28-26: 313-kitchen hood exhaust must be smooth, 311, 324, 312, 322, 321, 323. Install shackles at panel breakers on each unit for water heater. Reinspected units 314-320-install shackles for each water heater breaker at panels, install smooth kitchen exhausts-see 1503.3 of the 2018 IRC for details. Unit 328 ADA-vertical grab bar missing at shower and at side wall of water closet, smooth exhaust required at kitchen exhaust, switch light improperly wired at kitchen, shackle required at water heater breaker. See 1106.1.1.1 for # of required roll in showers and tubs.
07/30/2026 COT - HCPL - Plumbing Final  Canceled 7-30-26: canceled by contractor.
08/06/2026 COT - HCPL - Plumbing Final  Partial Pass 8/6/2026 Partial pass. All corrections were made. No new items needed. 308,309,310,325,326,327,301,302,303,304,305,306,307. Approved.
08/07/2026 COT - HCPL - Plumbing Final  Partial Pass 8-7-26: electrical, mechanical, plumbing & building finals at rooms 217, 216, 215, 218, 219, 214, 220 approved.
08/10/2026 COT - HCPL - Plumbing Final  Partial Pass Partial pass 221,222,223,212, 224,

213 anti tip loose, GFCI laundry area

211 needs GFCI in laundry
08/11/2026 COT - HCPL - Plumbing Final  Partial Pass 8-11-26: 1st floor corridor- seal all penetrations, secure low voltage wires, add knockout to above ceiling junction box and install missing lid, tape all tears to flex. Finals at Room's 225, 209, 208, 226, 227 approved.
08/12/2026 COT - HCPL - Plumbing Final  Partial Pass 8-12-26: finals for units 210, 202, 207, 206,203, 204, 205 approved. Above ceiling MEP's 1st floor corridor approved.
08/18/2026 COT - HCPL - Plumbing Final  Partial Pass 8-18-26: plumbing final at room's 117, 116, 118, 115, 119, 114, 120 approved.
08/19/2026 COT - HCPL - Plumbing Final  Partial Pass 8-19-26: plumbing final at room's 121, 122, 113, 123, 112, 124, 111 approved.
08/20/2026 COT - HCPL - Plumbing Final  Partial Pass
COT - HCPL - Plumbing Final  Scheduled