Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCEL - Electrical Intermediate
Permit Number - TC-COM-1224-02387
Inspection Description - COT - HCEL - Electrical Intermediate
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2026 | COT - HCEL - Electrical Intermediate | Re-inspection required | 1-9-26: MEP's for 2-floor, Section B- Units 220- adjust/move or add receptacle at kitchen wall (receptacles are required to be installed within 30" of the stove at each side). 219-fire foam penetration at top plate above stove, fire foam horizontal penetration at same area-party wall, fire foam penetration above window, fire foam penetration at top plate restroom, 218-strap DWV, fire foam penetration at top plate. Fire foam all horizontal penetrations at party walls and all vertical penetrations where coil straps penetrate floors. Apply wool at restroom DWV's or fire foam penetrations at top plates in all units. Provide size of smart electrical box above ceiling in hallways to verify box fill. Reschedule inspection for MEP's when ready. | |
| 01/13/2026 | COT - HCEL - Electrical Intermediate | Partial Pass | Section B; Level #2; Room units 211 - 224. OK to insulate and sheet rock interior walls. | |
| 01/20/2026 | COT - HCEL - Electrical Intermediate | Canceled | 1-20-26: canceled by contractor. | |
| 01/21/2026 | COT - HCEL - Electrical Intermediate | Re-inspection required | 1/21/26: M.E.P inspections conducted (in unit# 310,325,309,326,308,327,328), properly support NM cable at chase near restrooms, seal all penetrations through top plates/draft stop/corridor wall, Properly insulate all hot water piping 3/4" or larger, properly seal all rated assemblies at mechanical areas in hallways, receptacle spacing in bedroom in unit 325 shall be spaced not greater than 12', properly secure all dryer vent ducts in-wall, properly seal all openings at chase near restrooms, nail plates required throughout where electrical/plumbing come within 1 1/4" from face of stud, seal penetration near water closet at all bathrooms, | |
| 01/22/2026 | COT - HCEL - Electrical Intermediate | Canceled | 1-22-26: canceled by contractor. | |
| 01/23/2026 | COT - HCEL - Electrical Intermediate | Partial Pass | 1-23-26: reinspected MEP's at room's 310,325,309,326,308,327,328. All corrections made-okay to continue construction at progress areas. | |
| 01/28/2026 | COT - HCEL - Electrical Intermediate | Partial Pass | 1-28-26: MEP's at room's 301, 302, 307,306, 303-staple electrical, 304- fire foam/firecaulk penetrations along the east side wall party wall , 305- seal penetration at restroom penetration top plate at dwv. Add grounding screws to all metal pancake boxes in all rooms. Okay to continue construction at progress areas but listed above items need a reinspect prior to covering. | |
| 01/30/2026 | COT - HCEL - Electrical Intermediate | Partial Pass | 1-30-26: MEP's 2nd floor, room's 228, 227, 208, 226, 209, 210, 225 verified per plans. Okay to continue with construction at progress areas. | |
| 02/02/2026 | COT - HCEL - Electrical Intermediate | Partial Pass | 2-2-26: electrical intermediate on all 3 stairwells approved. | |
| 02/04/2026 | COT - HCEL - Electrical Intermediate | Partial Pass | 2-4-26: 2nd floor Section A-MEP's at room's 201, 202, 207, 203, 206, 205, 204 approved. Okay to drywall progress areas. | |
| 02/09/2026 | COT - HCEL - Electrical Intermediate | Partial Pass | 2/9/26:First floor Section B MEP Rooms 117, 116, 118, 115,114,119,120 | |
| 02/11/2026 | COT - HCEL - Electrical Intermediate | Partial Pass | 2-11-26: MEP' s at room's 121, 113, 122, 123-seal penetrations at marked locations, add Boca plates in restroom, 112-add bank plate marked locations,111-fire foam at top plate subpanel, 124. Fire foam penetrations in majority of units where hvac line sets penetrate exterior walls, and fix broken or damaged decking areas marked with an X.Okay to cover soffits on south side up to 121. Drywall screw inspection room's 210, 226, 209, 226, 208-okay to tape & texture progress areas but reschedule MEP's to verify corrections. | |
| 02/18/2026 | COT - HCEL - Electrical Intermediate | Re-inspection required | 2-18-26: MEP's for room 110, 125, 109, 126, 108-penetrations at party wall, 127, 128. Seal/firefoam all mechanical line set penetrations. Will need to verify corrections prior to drywall. | |
| 02/19/2026 | COT - HCEL - Electrical Intermediate | Re-inspection required | 2-19-26: 108-penetrations at partywall not sealed/hvac line set not sealed at exterior wall, 125-hvac line set at exterior wall not sealed, 127-hvac line set at exterior wall not sealed, 109-same (line set not sealed) , 110-same(line set not sealed). Okay to continue with construction at rooms not listed above but reschedule the others. | |
| 02/20/2026 | COT - HCEL - Electrical Intermediate | Partial Pass | 2-20-26: MEP's 3rd floor common area room's C01, C02, C03 approved. Okay to continue with construction at progress areas. | |
| 02/23/2026 | COT - HCEL - Electrical Intermediate | Canceled | 2/23/2026 canceled per contractor. | |
| 02/24/2026 | COT - HCEL - Electrical Intermediate | Partial Pass | 2-24-26: MEP's 108-110, 124-128 , B01, B02, B03 approved. Okay to continue construction at progress areas | |
| COT - HCEL - Electrical Intermediate | Scheduled | |||
| 12/03/2025 | COT - HCEL - Electrical Intermediate | Partial Pass | 12-3-25: partial pass on electrical intermediate inspection on 3rd floor Section B rooms, 316, 317, 315, 318, 314, 319, 320. Okay to continue with construction at progress areas. | |
| 12/04/2025 | COT - HCEL - Electrical Intermediate | Partial Pass | 12-4-25: partial pass for in wall electrical intermediates at room's 321, 313, 322 323, 312, 311,314. Okay to continue with construction at progress areas. |