Inspection Status: Re-inspection required
Inspection History: COT - HCEL - Electrical Above Ceiling
| Date |
Description |
Inspector |
Results |
Comments |
| 07/10/2026 |
COT - HCEL - Electrical Above Ceiling |
|
Re-inspection required |
7/10/2026 3rd floor corridors. provide 2 seismic wires alternate corners for all lighting. Secure mc cable coming out of boxes and off grid. One j box not labeled. South end multiple areas need to fire caulk penetrations. |
| 07/14/2026 |
COT - HCEL - Electrical Above Ceiling |
|
Re-inspection required |
7-14-26: 3rd floor corridor reinspect-seismic wires together with labeling of junction boxes verified. Add fire foam to each conduit at chases and seal all low voltage and wall penetrations. |
| 07/15/2026 |
COT - HCEL - Electrical Above Ceiling |
|
Partial Pass |
7-15-26: 3rd floor corridor corrections made-Okay to proceed with construction at progress areas. |
| 07/21/2026 |
COT - HCEL - Electrical Above Ceiling |
|
Partial Pass |
7-21-26: partial pass for 2nd floor above ceiling corridor MEP's. Pending Supply/Return in front of elevator. Okay to continue with construction at progress areas. |
| 07/27/2026 |
COT - HCEL - Electrical Above Ceiling |
|
Partial Pass |
7-27-26: verified MEP's ( diffuser/light) at 2nd floor corridor by elevator. Finals at South-wing Rooftop- missing permanent labeling at disconnects. Disconnect labels shall identify purpose and circuit, complete UV taping of HVAC line sets and paint all PVC |