Permit: TC-COM-1224-02387

Parcel: 13815015C


Addresses:

6675 S 12TH AV

Inspection Status: Not Ready

Inspection History: COT - HCEL - Electrical Underground 

Date Description Inspector Results Comments
05/04/2026 COT - HCEL - Electrical Underground  Not Ready 5-4-26: not ready-trench depth on 1" schedule 40 must be 18" min.
05/05/2026 COT - HCEL - Electrical Underground  Partial Pass 5-5-26: verified trench depth of 18" for 5-1" Schedule 40 electrical conduits for EV Chargers at the north side. Conduits run from east end to west-okay to backfill approximately 80' of open trench using shading materials.
05/06/2026 COT - HCEL - Electrical Underground  Partial Pass 5-6-26: excavation/ reinforcement for light pole cage in front of trash enclosure approved to pour.
05/07/2026 COT - HCEL - Electrical Underground  Partial Pass 5-7-26: excavation/reinforcement on light pole cage south of pergola verified per revision. Please submit revision to the city for review-okay for concrete placement at own risk.
05/11/2026 COT - HCEL - Electrical Underground  Partial Pass 5-11-26: verified trench depth on 2-1 1/2 & 2-2" Schedule 40 electrical conduits. The conduits are located at the north east end and run west approximately 50'. Conduits are for solar and light pole cages-okay to backfill progress areas using shading materials.
05/18/2026 COT - HCEL - Electrical Underground  Partial Pass 5/18/2026 1” schedule 40 conduit at 24” depth. West end of courtyard. Running and tied into light pole bases. Okay to backfill all progress areas. Shading required.
05/21/2026 COT - HCEL - Electrical Underground  Partial Pass 5-21-26: 3-1' schedule 40 EV conduits along court yard, 1-1" light trench near trash enclosure, 1-1 1/2", 9-1" together with 2-2" schedule 40 electrical conduits for EV chargers running north to south along east end of site. Okay to backfill progress areas using shading materials.
05/22/2026 COT - HCEL - Electrical Underground  Partial Pass 5-22-26: approximately 60' of trench depth verified for a 1" light pole schedule 40 conduit running north to south on east side of driveway near trash enclosure. Reinforcement/excavation for same light pole cage approved- okay for concrete placement.
05/27/2026 COT - HCEL - Electrical Underground  Partial Pass 5-27-26: reinforcement/excavation on 1 light pole at court yard together with another at the northeast corner of site verified per plans. 3-1" schedule 40 conduits for EV chargers running north to south at the courtyard approved. Okay to backfill progress areas and pour the light pole cages.
05/28/2026 COT - HCEL - Electrical Underground  Partial Pass 5-28-26: reinforcement/excavation for 2 light pole cages on west side of building verified per plans. Okay to backfill approximately 140' of open trench for a 1" schedule 40 electrical conduit and okay to pour cages.
05/29/2026 COT - HCEL - Electrical Underground  Canceled 5-29-26: canceled by contractor.
06/04/2026 COT - HCEL - Electrical Underground  Partial Pass 6-4-26: reinforcement/excavation for 2 light pole cages located on north side of site verified per plans-Okay for concrete placement. Verified trench depth at 18" for a 1" Schedule 40 electrical conduit for cages and a 1" Schedule 40 electrical conduit for a Monument Sign- all located at north end. Okay to backfill approximately 110' of trench using shading materials.
06/11/2026 COT - HCEL - Electrical Underground  Partial Pass 6-11-26: verified schedule 40 electrical conduits for site lighting together with conduit for ev chargers along the north and northeast corners of building. Okay to backfill progress areas using shading materials.
06/23/2026 COT - HCEL - Electrical Underground  Partial Pass 6-23-26: reinforcement/excavation for the light pole cage located on the southeast corner of site. Okay for concrete placement.
07/30/2025 COT - HCEL - Electrical Underground  Partial Pass 7/30/25: electrical underground approved from elevator 16' run to the outside of building east end Area A
08/04/2026 COT - HCEL - Electrical Underground  Not Ready Light pole base north side not ready. Clean footing. Loose fill. Provide 3" minimum. 8/4/2026
08/21/2025 COT - HCEL - Electrical Underground  Partial Pass 8-21-25: partial pass -UFER /grounding 3/0 copper attached to rebar through Area A.
12/04/2025 COT - HCEL - Electrical Underground  Partial Pass 12-4-25: verified 4-4" schedule 40 electrical secondary conduits from transformer to SES 3 at section b. Okay to backfill progress areas.
12/09/2025 COT - HCEL - Electrical Underground  Partial Pass 12-9-25: verified 4-4" schedule 40 electrical conduits for SES 2 located on northeast side of building.