Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Exterior Clips/Sheathing
Permit Number - TC-COM-1224-02387
Inspection Description - COT - HCBU - Exterior Clips/Sheathing
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 9-15-25: add anchor bolts at marked locations at unit's 122, 121, 120, 114 and at each side the corridor doors. Anchor bolts are required within 12" of a splice and a minimum of 2 anchor bolts are required per plate. Will verify at upcoming inspection together with stair framing. Area B exterior sheathing, hold-downs, hardware, and shot pins verified per plans-okay to continue with construction at progress areas. | |
| 09/15/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 9-15-25: add anchor bolts at marked locations at unit's 122, 121, 120, 114. Will verify at upcoming inspection together with stair framing. Area B exterior sheathing, hold-downs, hardware , and shot pins at 1st level verified per plans-okay to continue with construction at progress areas. | |
| 10/16/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 10-16-25: Area B of second floor nailing on exterior sheathing and straps verified per plans. Okay to continue construction at progress areas. | |
| 10/31/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 10-31-25: Section B Stairwell exterior sheathing verified at 4" at edges/joints & 12" o.c. In the field (ground level -3rd level) & CS Straps at openings. Verified Section B South Stairwell joists, LVL stringers, Simpson LUS hangers & required A35's per S3.11 detail 10 together with required holds as per shear wall schedule. Missing fireblocking at stair stringers-see 718.2.4 of the IBC for details and add nails to interior stairwell sheathing where nails over-penetrate more than 1/8" and are installed closer than 3/8" at joints. A re-inspection is required for mentioned items but okay to continue with construction at progress areas. | |
| 11/04/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 11-4-25: Section B interior clips, sill plate nailing to decking, and required hold downs for unit's 223, 212, 211, 224 and east corridor approved. Okay to continue with construction at progress areas. | |
| 11/13/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 11-13-25: rooftop at north top of staircase approved-okay to dry-in. Nailing at Exterior sheathing on west, north, and south approved. East side of top of staircase not inspected. | |
| 11/17/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 11-17-25: clips, hold-downs , interior framing at room's 310, 325, 309, 326, 309, 308, 327, 308, 327 3rd floor corridor C06 up to 327 verified per plans. Okay to continue with construction at progress areas. | |
| 11/18/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 11-18-25: framing and clips inspection at room's 228, 301-a35's at doorway, 203-h25s, 207-a35's bracing top & bottom, 206-backing at bedroom, 204, 205-a35's at window & h25's to- /bottom of bedroom, 3rd area A north wing corridor. Reschedule inspection to verify made corrections-Still pending is nailing for cs -straps from second to 3rd floor. | |
| 11/19/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 11/19/2025 1st floor. Area A. Hdu2 holdowms in place. Cs16 straps in place. 16” past down to both below top plates and above tope plates at all hold down locations. All hardware and shot pins have been verified. Corridors ledgers approved. Interior shear wall (osb sheathing) in place. Trash shoot area pending. Okay to proceed progress areas. | |
| 11/20/2025 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 11-20-25: second floor exterior shear bracing nailing and straps approved. |