Parcel: 13815015C


Addresses:

6675 S 12TH AV


Inspection Status: Partial Pass

Inspection History: COT - HCBU - Framing

Permit Number - TC-COM-1224-02387

Inspection Description - COT - HCBU - Framing

Inspection Status - Partial Pass

Date Description Inspector Results Comments
09/03/2025 COT - HCBU - Framing Partial Pass 9-3-25: partial pass for Section B deck nailing-okay to continue with construction at progress areas.
10/28/2025 COT - HCBU - Framing Partial Pass 10-28-25: verified hold-downs, straps & nailing for plate to deck at Section B 2nd. Floor, room's 217, 216, 218, 215, 214, 219. Okay to continue with construction at progress areas.
10/29/2025 COT - HCBU - Framing Partial Pass 10-29-25: Section B, 2nd floor verified per plans hold-downs, straps, hangers, plate to decking nailing at room's, 220, laundry, 221, equipment room, 213, 223, Corridor Section B, B10-sitting room will be submitting a revision for replacement of 2x12 headers with either 5.5x9.25GLB or 3 -1.75x9.25 LVL headers. (Okay to continue with construction at this location at own risk-pending RFI approval). For all other rooms-Okay to continue with construction.
10/31/2025 COT - HCBU - Framing Partial Pass 10-31-25: verified exterior nailing for end of roof sheathing & and top of roof nailing for Section B South stairs. Okay to continue construction at progress areas.
11/04/2025 COT - HCBU - Framing Partial Pass 11-4-25: Section B-South stair well fireblocking, nailing at sheathing and hardware approved. An RFI will be submitted showing shot pins 8" o.c. Instead of tighten bolts at ground level stairwell. Okay to continue with construction at progress areas.
11/06/2025 COT - HCBU - Framing Partial Pass 11-6-25: verified anchor bolts at unit's 122, 121, 120, 114. Okay to cont with construction at progress areas.
11/07/2025 COT - HCBU - Framing Partial Pass 11-7-25: verified hangers and SDS screws at Section B corridor up to room 324 approved. Okay to continue with construction at progress areas.
11/12/2025 COT - HCBU - Framing Partial Pass 11-12-25: verified straps and hold-downs for section b at room's, 315, 319, 314,318, 316, 317.
11/13/2025 COT - HCBU - Framing Partial Pass 11-13-25; verified straps /hold-downs/ clips for Section B-Room's 320. C10,321, 313-35s, 322, 312, 323, 324, 311. Okay to continue with construction.
11/18/2025 COT - HCBU - Framing Partial Pass 11-18-25: Section A-1st floor Exterior shear approved. Okay to continue with construction at progress areas.
11/20/2025 COT - HCBU - Framing Partial Pass 11-20-25: verified interior hold-downs,straps/clips for room's 205, 204, 203, 206, 207, 202, 201, lounge , exercise room, 228, 227, 208, 227, 209, 226, 210. Okay to continue with construction at progress areas.
11/21/2025 COT - HCBU - Framing Partial Pass 11-21-25: Section A exterior shear & straps for level 2 and 3 approved. Okay to proceed with construction at progress areas. Pending trash chute located at the north east section of site.
12/09/2025 COT - HCBU - Framing Partial Pass 12-9-25: partial pass for framing at north and central staircase from ground level to third level. Pending approval from city on titan anchor bolts to shot pins at sill plates. Okay to continue with construction at progress areas.
12/11/2025 COT - HCBU - Framing Partial Pass 12-11-25: framing at maintenance garage verified per plans. Trash enclosure shear wall up to 2nd floor inspected only. Okay to continue with construction at progress areas.
12/30/2025 COT - HCBU - Framing Partial Pass 12-30-25: drywall shear bracing inspection at room's 314-320 approved. Okay to tape & texture progress areas.
Note: metal pancake boxes at hallways are overfilled-boxes are rated for 6 cubic inches and there are currently 2-12/2 awg wires in each. Make corrections and will reinspect at later date.