Parcel: 13815015C


Addresses:

6675 S 12TH AV


Inspection Status: Re-inspection required

Inspection History: COT - HCPL - Plumbing Intermediate 

Permit Number - TC-COM-1224-02387

Inspection Description - COT - HCPL - Plumbing Intermediate 

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
01/09/2026 COT - HCPL - Plumbing Intermediate  Re-inspection required 1-9-26: MEP's for 2-floor, Section B- Units 220- adjust/move or add receptacle at kitchen wall (receptacles are required to be installed within 30" of the stove at each side). 219-fire foam penetration at top plate above stove, fire foam horizontal penetration at same area-party wall, fire foam penetration above window, fire foam penetration at top plate restroom, 218-strap DWV, fire foam penetration at top plate. Fire foam all horizontal penetrations at party walls and all vertical penetrations where coil straps penetrate floors. Apply wool at restroom DWV's or fire foam penetrations at top plates in all units. Provide size of smart electrical box above ceiling in hallways to verify box fill. Reschedule inspection for MEP's when ready.
01/13/2026 COT - HCPL - Plumbing Intermediate  Partial Pass Section B, Level #2: Room units 211 - 224. Ok to insulate and sheet rock interior walls.
10/24/2025 COT - HCPL - Plumbing Intermediate  Partial Pass 10/24/25: Section B drain waste and vent inspection(pressure test approved) 1,2,3 floor
11/14/2025 COT - HCPL - Plumbing Intermediate  Partial Pass 11-14-25: DWV Section A inspection floors 1-3 ( pressure test approved).Room's 128, 228, 328 ADA Showers not tested due to truss in way-pending engineers fix. Okay to continue with construction at progress areas.
11/19/2025 COT - HCPL - Plumbing Intermediate  Partial Pass 11/19/2025 Section B tub inspection levels 2 and 3. Approved.
11/21/2025 COT - HCPL - Plumbing Intermediate  Partial Pass 11-21-25: partial pass on Section B-level 1 tub inspection. DWV at Room's 111, 121, 124 were not wrapped protecting them from pourbqck. Cut back concrete to where DWV is exposed and properly wrap to avoid future damage of piping.
12/12/2025 COT - HCPL - Plumbing Intermediate  Partial Pass 12/12/2025 partial pass. Section B third floor 7 units approved. Okay to proceed progress areas.
12/15/2025 COT - HCPL - Plumbing Intermediate  Partial Pass 12-15-25: Section B, 3RD Floor unit's 321, 313, 322, 312, 323-secure pex lines at tub, add Boca plate for toilet line and firefoam penetration, secure flex in soffit, 311-secure pex lines, firefoam penetration behind tub, Boca plate needed at 3" DWV for toilet line and firefoam penetration, 324-secure pex line at bathroom, add Boca plate for 3" dwv and firefoam penetration. Secure/support all HVAC cabling and copper lines in every unit. Okay to continue construction at progress areas but will have to verify corrections at units.
12/19/2025 COT - HCPL - Plumbing Intermediate  Re-inspection required 12-19-25: 313-penetration not fire foam at DWV in restroom, secure hvac whip, awg penetration in chute and foam penetration at decking, 322-penetration at restroom dwv not fire foamed, secure hvac whip and awg in chute, 323-fire foam penetration at hvac chute-secure hvac whip and fire foam penetration at dwv at restroom, 311-fire foam penetration at dwv in restroom top plate, secure hvac whip, fire foam penetrations at hvac chute top plate/decking, 312-secure hvac whip and fire foam wag in hvac chute, 324-secure hvac whip, fire foam awg penetration at decking/top plate in chute.
12/23/2025 COT - HCPL - Plumbing Intermediate  Partial Pass 12-23-25: 3rd floor plumbing intermediate reinspect for room's 311, 312, 313, 322, 324 approved. Okay to continue with construction at progress areas.