Parcel: 13815015C


Addresses:

6675 S 12TH AV


Inspection Status: Re-inspection required

Inspection History: COT - HCME - Mechanical Intermediate

Permit Number - TC-COM-1224-02387

Inspection Description - COT - HCME - Mechanical Intermediate

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
01/09/2026 COT - HCME - Mechanical Intermediate Re-inspection required 1-9-26: MEP's for 2-floor, Section B- Units 220- adjust/move or add receptacle at kitchen wall (receptacles are required to be installed within 30" of the stove at each side). 219-fire foam penetration at top plate above stove, fire foam horizontal penetration at same area-party wall, fire foam penetration above window, fire foam penetration at top plate restroom, 218-strap DWV, fire foam penetration at top plate. Fire foam all horizontal penetrations at party walls and all vertical penetrations where coil straps penetrate floors. Apply wool at restroom DWV's or fire foam penetrations at top plates in all units. Provide size of smart electrical box above ceiling in hallways to verify box fill. Reschedule inspection for MEP's when ready.
01/13/2026 COT - HCME - Mechanical Intermediate Partial Pass Section B; Level #2; Room units 211 - 224. Ok to insulate and sheet rock interior walls.
12/03/2025 COT - HCME - Mechanical Intermediate Partial Pass 12-3-25: mechanical intermediate inspection on 3rd floor Section B rooms, 316, 317, 315, 318, 314, 319, 320. Partial pass-okay to continue with construction at progress areas.

Note: correct following items prior to spraying insulation at the following rooms, 310, 325, 309, 326, 308-straps on range & fan exhaust, 327-support exhaust, 328, 301, 302-strap for dryer, 307, 306 support on dryer, 303, 304
12/04/2025 COT - HCME - Mechanical Intermediate Partial Pass 12-4-25: partial pass for mechanical at room's 321, 313, 322 323, 312, 311,314. Okay to continue with construction at progress areas.
Note: okay to spray insulation at upper deck areas at room's-310, 308, 327, 328, 301, 302, 307, 306 , 303, 304, 325, 309, 326,
12/11/2025 COT - HCME - Mechanical Intermediate Canceled 12-11-25: canceled by contractor.
12/12/2025 COT - HCME - Mechanical Intermediate Partial Pass 12/12/2025 partial pass. Section B third floor 7 units approved. Drop ceilings. Okay to proceed progress areas.
12/15/2025 COT - HCME - Mechanical Intermediate Partial Pass 12-15-25: Section B, 3RD Floor unit's 321, 313, 322, 312, 323-secure pex lines at tub, add Boca plate for toilet line and firefoam penetration, secure flex in soffit, 311-secure pex lines, firefoam penetration behind tub, Boca plate needed at 3" DWV for toilet line and firefoam penetration, 324-secure pex line at bathroom, add Boca plate for 3" dwv and firefoam penetration. Secure/support all HVAC cabling and copper lines in every unit. Okay to continue construction at progress areas but will have to verify corrections at units.
12/19/2025 COT - HCME - Mechanical Intermediate Re-inspection required 12-19-25: 313-penetration not fire foam at DWV in restroom, secure hvac whip, awg penetration in chute and foam penetration at decking, 322-penetration at restroom dwv not fire foamed, secure hvac whip and awg in chute, 323-fire foam penetration at hvac chute-secure hvac whip and fire foam penetration at dwv at restroom, 311-fire foam penetration at dwv in restroom top plate, secure hvac whip, fire foam penetrations at hvac chute top plate/decking, 312-secure hvac whip and fire foam wag in hvac chute, 324-secure hvac whip, fire foam awg penetration at decking/top plate in chute.
12/23/2025 COT - HCME - Mechanical Intermediate Partial Pass 12-23-25: 3rd floor plumbing intermediate reinspect for room's 311, 312, 313, 322, 324 approved. Okay to continue with construction at progress areas.