Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address:
4410 S PARK AV
Address NEW:
4410 S PARK AV
Apply Date:
04/02/2023
Applicant:
Eduardo Hernandez
Description:
City of Tucson Southside Public Safety Facility - Police and Fire Station

Permit Reviews

Permit Number - TC-COM-0423-00942
Permit Status: Inspections
Permit Description: City of Tucson Southside Public Safety Facility - Police and Fire Station
Start Date Submittal Complete Date Status  
09/05/2024 COMMERCIAL REVIEW - FULL v.5 09/17/2024 APPROVED Review Details
12/07/2023 COMMERCIAL REVIEW - FULL v.2 12/15/2023 REQUIRES RESUBMIT Review Details
03/21/2024 COMMERCIAL REVIEW - FULL v.3 03/27/2024 REQUIRES RESUBMIT Review Details
05/03/2024 COMMERCIAL REVIEW - FULL v.4 05/14/2024 REQUIRES RESUBMIT Review Details
09/17/2024 RESTAMP - COMMERCIAL v.1 09/20/2024 APPROVED Review Details
04/06/2023 COMMERCIAL REVIEW - FULL v.1 05/04/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0423-00942
Permit Status: Inspections
Permit Description: City of Tucson Southside Public Safety Facility - Police and Fire Station
Total Outstanding Activity Conditions - 13
Date Name
03/26/2024 AIR BALANCING REPORT IS REQUIRED.
03/26/2024 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
03/26/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/26/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
03/26/2024 Masonry Inspection Report submittal review is required.
03/26/2024 Post-Installed Anchor Inspection Report is required.
03/26/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
03/26/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
03/26/2024 WATER STERILIZATION REPORT IS REQUIRED.
03/26/2024 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.
03/26/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED.
09/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Confirmation of payment of sewer connection and or industrial waste fees must be provided prior to issuance of a Temporary Certificate of Occupancy. Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/18/2023 Prior to project being finalized applicant must provide easement abandonment and recordation information.

Conditions

Permit Number - TC-COM-0423-00942
Permit Status: Inspections
Permit Description: City of Tucson Southside Public Safety Facility - Police and Fire Station
Date Description Comments
04/06/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
09/05/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0423-00942
Permite Description: City of Tucson Southside Public Safety Facility - Police and Fire Station
Total Outstanding Inspections - 35
Last Inspection Date Description Inspector Results Comments
10/22/2024 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass 10/4/24: not ready still laying rebar and j bolt plates.
10/9/24: partial footing inspection at Area D ( picture provided with area that has been inspected under attachments). Ok to proceed in progress area .

footing reinforcement for Area C/B. Open court yard area D. Interior Columbs at area C. Total of 5.
Total of two columns at area A/B. 10/17/2024
10/22/24: footing reinforcement per plan at area A/B ok to proceed.
10/24/2024 COT - LCME - Mechanical Underground N/A Not Ready
11/05/2024 COT - LCBU - Stem Wall/Retaining Wall N/A Partial Pass North portion of structure ; Fire side of structure stem walls at rooms 253, 252, 251, 255, 254, 25^, 250, 221, 222< 220, 219, 218. OK to place grout in progress areas.
12/11/2024 COT - LCPL - Rough Soil N/A Partial Pass 12/11/24: plumbing underground at schematic #8 waste and vent passed ok to backfill.
04/18/2025 COT - LCBU - Masonry Pregrout N/A Partial Pass 11/14/24: reinforcement per plan at Columns first lift @4'8" at East and West side of room 250, reinforcement per plan at open courtyard stem wall ok to proceed
11/15/24: reinforcement per plan at Apparatus bay at south wall @4'8".
11/20/24: reinforcement per plan at first lift at Freestanding 24" masonry wall, reinforcement per plan at second lift at south west wall of apparatus bay, first lift at south wall @ 5'4" at south walls of (rooms 251, 252, 253).
12/3/24: first lift at Southwest corner of apparatus Bay MC2 and MC1 per plans at 5'4". Ok to grout progress area. Freestanding 24" masonry wall third lift approved ok to proceed with grout.
12/9/24: reinforcement per plan 5th lift at south end of apparatus bay from 18'8"- 23'4"
12/11/24: reinforcement per plan at 5th lift north end of apparatus bay from 18'8-23'4", reinforcement per plan at free standing masonry wall from 18'8"-23'4".
12/12/24: reinforcement per plan at south west corner of room 250 elev 14'8"-18'8"
12/23/24: top out at free standing masonry wall passed. Double wall at south east corner first lift passed ok to proceed with grout.
12/31/24: reinforcement at south walls in the public lobby, mdf, tactics, exam/atpt off, fitness ok to grout first lift from 0"-4'8", apparatus bay east wall and piers from 9'4"-14'.
4/18/25: reinforcement per plan at Corridor 201 east wall, north east locker room top out, 2nd lift at rooms (254,251,252,253,255) approved.
04/18/2025 COT - HCBU - Masonry Pregrout N/A Partial Pass 3-25-25, reinforcement per plans on separation wall between the dorms at 18' 8". Public lobby east lintel 23' 4" & Fire court yard north wall @ 26' 8". Okay to grout.
3/28/25: reinforcement per plan at Locker Rooms East Wall (Elev 4'8"-9'4"), (rooms (178,177,179,183) East wall (Elev 4'8"-9'4")).
4-2-25, reinforcement per plans on corridor lintel #201-(south lintel) at 18' 8". Okay to grout.
4/11/25: reinforcement per plan at Locker rooms (NORTH,SOUTH, AND WEST) top out., East wall corridor 201 lintel.
4/14/25: Reinforcement per plan at Locker room east wall top out, public lobby east 101, evidence drop off room 175 west wall,

4/15/25 west wall of 163. (14'-18'). West wall of 175,176. (14'-16'8"). West wall room 201. (13'4"-17'4"). East wall room 201 (16'-20'). North and east wall of rooms 251-257. (0-4'8"). West wall of room 257 (0-4'8"). Approved for grout per third party report.
4/18/25: reinforcement per plan at Corridor 201 east wall, north east locker room top out, 2nd lift at rooms (254,251,252,253,255) approved.
06/17/2025 COT - LCBU - Roof Nailing N/A Partial Pass 6-17-25: fitness parapet nailing inspection approved. Okay to proceed with construction.
07/10/2025 COT - LCEL - Outdoor Lighting N/A Partial Pass Lighting in exterior soffits at fitness area and West soffit of apparatus area. Ok to cover progress areas.
12/10/2024 COT - LCEL - Electrical Underground N/A Partial Pass Partial pass. Electrical. Stubbed up vertically. D area. Out door receptacles. Controls for garage door. 10/18/2024

10/23/24: electrical underground at MDF room 114 passed, (8)4” conduit 50’ run from building at SES to transformer, electrical underground for ATS per plans, electrical underground at room 196 per plans ok to proceed.
11/14/24: electrical underground passed from room 226 (COMM) to room 114 (MDF), storage room to ATS complete ok to backfill.

11/15/24: reinforcement/ grounding per plan at 3 light pole base SG at north west trash enclosure.
12/2/24: reinforcement/ grounding per plan at 2 light pole base one on north and one south of south entry on FAIR ST.
12/10/24:12/3/24: partial pass for pre-slab at Area C south end and area d south end
12/10/24: reinforcement per plan at slab in rooms 141,137,171,172,177,179,179,183,182,184,180,181,185,186,187,194,193,189,190,191,192.
11/06/2024 BULD - Electrical Clearance N/A Partial Pass Request meter and service for temporary construction power; power for construction trailers. Code is TMPP - sent 11/22 - JConrad
09/17/2025 COT - LCPL - Gas Pressure Test N/A Partial Pass Overhead 2” gas line from Area A through apparatus room to SW gas meter location.
09/22/2025 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Partial Pass 9-22-25: firewall caulking, framing, plumbing, mechanical, electrical above ceiling, electrical intermediates verified per plans at room's 193, 177, 194, 181, 182, 183, 184, 185. 186, 187, 188, 189, 190, 191. Okay to continue with construction at progress areas.
09/22/2025 COT - LCEL - Electrical Intermediate N/A Partial Pass 9-22-25: firewall caulking, framing, plumbing, mechanical, electrical above ceiling, electrical intermediates verified per plans at room's 193, 177, 194, 181, 182, 183, 184, 185. 186, 187, 188, 189, 190, 191. Okay to continue with construction at progress areas.
08/28/2025 COT - LCBU - Framing N/A Partial Pass Fitness room soffits, Ok to set mechanical and lighting
05/23/2025 COT - LCEL - Electrical Progress N/A Partial Pass 5-23-25, in wall electrical at kitchen, office-room 223, and Area A verified per plans. Okay to spray foam at progress areas.
10/17/2025 COT - LCME - Mechanical Above Ceiling N/A Partial Pass 10-17-25: all MEP's building above ceiling and in wall for rooms 254,255 and lockers 152&153 173,173,174,175,178,179, and 194 verified per plans. Okay to continue construction at progress areas.
09/10/2025 COT - LCPL - Plumbing Above Ceiling N/A Partial Pass Areas C and D all joints above ceilings; Ok to insulate joint areas.
COT - FCON - Hood System - Final N/A Not Ready We dont do smoke test.
07/17/2025 COT - LCBU - Building Progress N/A Partial Pass 7-17-25: drywall/durock nailing on room's 237-240 verified per plans. Okay for tape & texture.
10/29/2025 COT - LCME - Kitchen Hood N/A Partial Pass 10-29-25: verified 1st layer of hood wrap-okay for second layer at room's 204& 148.
10/29/2025 COT - LCPL - Plumbing Roof Drains N/A Partial Pass 10-29-25: roof drains at apparatus bay verified under test.
08/11/2025 COT - LCPL - Sewer N/A Partial Pass Roughly 60’ transition from 6” to 4”. Tracer wire in place along with bedding heading toward the apperatus bay from man hole at park. Okay to backfill progress areas at own risk. Shading material is required. 8/11/2025
11/13/2025 COT - LCBU - Building Above Ceiling N/A Partial Pass 11-13-25: mechanical, electrical and plumbing above ceiling at Debriefing and interview lobby LMS approved. Okay to continue with construction at progress areas.
08/26/2025 COT - LCME - Mechanical Progress N/A Partial Pass Metal duct systems in processing area; ensure pooky covering is complete on all ducts.
12/24/2024 COT - LCPL - Plumbing Progress N/A Partial Pass 12-24-24, partial pressure test for system 1 waste & vent.Okay to backfill inspected area.
12/10/2024 COT - LCBU - Preslab N/A Partial Pass 12/3/24: partial pass for pre-slab at Area C south end and area d south end
12/10/24: reinforcement per plan at slab in rooms 141,137,171,172,177,179,179,183,182,184,180,181,185,186,187,194,193,189,190,191,192.
12/02/2025 COT - FCON - Sprinkler - Final N/A Partial Pass Partial Pass for Police Station side of Sprinkler System.
12/03/2025 COT - LCPL - Gas Final N/A Partial Pass 12-3-25: partial pass.
07/10/2025 COT - LCEL - Electrical Above Ceiling N/A Partial Pass Dormitory areas A and B unit rooms and restrooms above hard ceilings. Ok to cover progress areas.
11/15/2024 COT - LCEL - Grounding/Bonding N/A Partial Pass 10/9/24: partial for UFER
Partial pass. Electrical. Stubbed up vertically. D area. Out door receptacles. Controls for garage door. 10/18/2024

10/23/24: electrical underground at MDF room 114 passed, (8)4” conduit 50’ run from building at SES to transformer, electrical underground for ATS per plans, electrical underground at room 196 per plans ok to proceed.
11/14/24: electrical underground passed from room 226 (COMM) to room 114 (MDF), storage room to ATS complete ok to backfill.

11/15/24: reinforcement/ grounding per plan at 3 light pole base SG at north west trash enclosure.
COT - FCON - Fire - Final N/A Scheduled
12/04/2025 COT - FCON - Alarm - Final N/A Partial Pass Tested All Smoke Detectors, Heat Detectors, Duct Detectors, Horn/Strobes, Tampers and Water Flows on Police Station Side. All passed. Will test Fire Station at a later date.
COT - LCBU - Building Final N/A Requested
12/05/2025 COT - LCEL - Electrical Final N/A Partial Pass 12-5-25: partial pass- on electrical final for room's 137, 13, 139, 105, 107, public lobby.
Label all receptacles throughout-will verify at upcoming inspections.
COT - LCME - Mechanical Final N/A Requested

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0423-00942
Permit Description: City of Tucson Southside Public Safety Facility - Police and Fire Station
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/16/2025 BULD - Electrical Clearance Passed Ok to set meter; cannot energize system until 2nd Party Final Inspection (1 August). Code: ECO
12/03/2025 COT - LCEL - Electrical Above Ceiling Passed 12-3-25: electrical above ceiling approved.
12/03/2025 COT - LCEL - Grounding/Bonding Passed 12-3-25: grounding/bonding approved.
12/03/2025 COT - BULD - SWG Clearance Passed 12-3-25: okay to install meter. Clearance issued to SWG.

Scheduled Inspections

Scheduled Inspections - TC-COM-0423-00942
Status: Inspections
Description: City of Tucson Southside Public Safety Facility - Police and Fire Station
Scheduled Date Description Entered By Entered Date
12/02/2025 COT - FCON - Fire - Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-COT_PUBLIC_SAFETY_BUILDING_V1_V1.PDF DOCUMENTS VIEW
TC-COM-0423-00942-2024-09-20_V1.PDF DOCUMENTS VIEW
PERLMAN_RESPONSE LETTER_BUILDING_V1.PDF DOCUMENTS VIEW
SPECIAL_INSPECTION_CERTIFICATE_STRUCTURAL-2023-12-07_V1.PDF DOCUMENTS VIEW
PERLMAN_RESPONSE LETTER_BUILDING_V1.PDF DOCUMENTS VIEW
TSS PSF FS10 SPEC BINDER_V1.PDF DOCUMENTS VIEW
CONS-BUILDING BIND 120123_V1.PDF DOCUMENTS VIEW
CONS-COT_PUBLIC_SAFETY_BUILDING_V1.PDF DOCUMENTS VIEW
22110 HYDRAULIC CALCULATIONS_BIND_V1.PDF DOCUMENTS VIEW
FP CUT SHEETS_V1.PDF DOCUMENTS VIEW
CONS-COT_PUBLIC_SAFETY_BUILDING_V1.PDF DOCUMENTS VIEW
COT_PUBLIC_SAFETY_DEVELOPMENT_V1.PDF DOCUMENTS VIEW
COT_PUBLIC_SAFETY_SPECS_V1.PDF DOCUMENTS VIEW
COT SSPSF GEOTECHNICAL REPORT_V1.PDF DOCUMENTS VIEW
COT SSPSF GEOTECHNICAL REPORT-ADD NO 1_V1.PDF DOCUMENTS VIEW
UTILITY CLEARENCE LETTERS_V1.PDF DOCUMENTS VIEW
SOUTHSIDE PUBLIC SAFETY - STRUCTURAL CALCS_V1.PDF DOCUMENTS VIEW