Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0423-00942
Permit Details
Apply Date:
04/02/2023
Applicant:
Gerrald Adams
Description:
City of Tucson Southside Public Safety Facility - Police and Fire Station
Permit Reviews
Permit Number - TC-COM-0423-00942
Permit Status: Inspections
Permit Description: City of Tucson Southside Public Safety Facility - Police and Fire Station
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/05/2024 | COMMERCIAL REVIEW - FULL v.5 | 09/17/2024 | APPROVED |
12/07/2023 | COMMERCIAL REVIEW - FULL v.2 | 12/15/2023 | REQUIRES RESUBMIT |
03/21/2024 | COMMERCIAL REVIEW - FULL v.3 | 03/27/2024 | REQUIRES RESUBMIT |
05/03/2024 | COMMERCIAL REVIEW - FULL v.4 | 05/14/2024 | REQUIRES RESUBMIT |
09/17/2024 | RESTAMP - COMMERCIAL v.1 | 09/20/2024 | APPROVED |
04/06/2023 | COMMERCIAL REVIEW - FULL v.1 | 05/04/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0423-00942
Permit Status: Inspections
Permit Description: City of Tucson Southside Public Safety Facility - Police and Fire Station
Total Outstanding Activity Conditions - 13
Date | Name |
---|---|
03/26/2024 | AIR BALANCING REPORT IS REQUIRED. |
03/26/2024 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
03/26/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
03/26/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
03/26/2024 | Masonry Inspection Report submittal review is required. |
03/26/2024 | Post-Installed Anchor Inspection Report is required. |
03/26/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
03/26/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
03/26/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
03/26/2024 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
03/26/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
09/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Confirmation of payment of sewer connection and or industrial waste fees must be provided prior to issuance of a Temporary Certificate of Occupancy. Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
12/18/2023 | Prior to project being finalized applicant must provide easement abandonment and recordation information. |
Conditions
Permit Number - TC-COM-0423-00942
Permit Status: Inspections
Permit Description: City of Tucson Southside Public Safety Facility - Police and Fire Station
Date | Description | Comments |
---|---|---|
04/06/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
09/05/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0423-00942
Permite Description: City of Tucson Southside Public Safety Facility - Police and Fire Station
Total Outstanding Inspections - 11
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/22/2024 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 10/4/24: not ready still laying rebar and j bolt plates. 10/9/24: partial footing inspection at Area D ( picture provided with area that has been inspected under attachments). Ok to proceed in progress area . footing reinforcement for Area C/B. Open court yard area D. Interior Columbs at area C. Total of 5. Total of two columns at area A/B. 10/17/2024 10/22/24: footing reinforcement per plan at area A/B ok to proceed. |
10/24/2024 | COT - LCME - Mechanical Underground | N/A | Not Ready | |
11/06/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Request meter and service for temporary construction power; power for construction trailers. Code is TMPP - sent 11/22 - JConrad |
11/05/2024 | COT - LCBU - Stem Wall/Retaining Wall | N/A | Partial Pass | North portion of structure ; Fire side of structure stem walls at rooms 253, 252, 251, 255, 254, 25^, 250, 221, 222< 220, 219, 218. OK to place grout in progress areas. |
11/15/2024 | COT - LCEL - Grounding/Bonding | N/A | Partial Pass | 10/9/24: partial for UFER Partial pass. Electrical. Stubbed up vertically. D area. Out door receptacles. Controls for garage door. 10/18/2024 10/23/24: electrical underground at MDF room 114 passed, (8)4” conduit 50’ run from building at SES to transformer, electrical underground for ATS per plans, electrical underground at room 196 per plans ok to proceed. 11/14/24: electrical underground passed from room 226 (COMM) to room 114 (MDF), storage room to ATS complete ok to backfill. 11/15/24: reinforcement/ grounding per plan at 3 light pole base SG at north west trash enclosure. |
11/20/2024 | COT - LCBU - Building Progress | N/A | Partial Pass | 11/14/24: reinforcement per plan at Columns first lift @4'8" at East and West side of room 250, reinforcement per plan at open courtyard stem wall ok to proceed 11/15/24: reinforcement per plan at Apparatus bay at south wall @4'8". 11/20/24: reinforcement per plan at first lift at Freestanding 24" masonry wall, reinforcement per plan at second lift at south west wall of apparatus bay, first lift at south wall @ 5'4" at south walls of (rooms 251, 252, 253). |
12/10/2024 | COT - LCEL - Electrical Underground | N/A | Partial Pass | Partial pass. Electrical. Stubbed up vertically. D area. Out door receptacles. Controls for garage door. 10/18/2024 10/23/24: electrical underground at MDF room 114 passed, (8)4” conduit 50’ run from building at SES to transformer, electrical underground for ATS per plans, electrical underground at room 196 per plans ok to proceed. 11/14/24: electrical underground passed from room 226 (COMM) to room 114 (MDF), storage room to ATS complete ok to backfill. 11/15/24: reinforcement/ grounding per plan at 3 light pole base SG at north west trash enclosure. 12/2/24: reinforcement/ grounding per plan at 2 light pole base one on north and one south of south entry on FAIR ST. 12/10/24:12/3/24: partial pass for pre-slab at Area C south end and area d south end 12/10/24: reinforcement per plan at slab in rooms 141,137,171,172,177,179,179,183,182,184,180,181,185,186,187,194,193,189,190,191,192. |
12/11/2024 | COT - LCPL - Rough Soil | N/A | Partial Pass | 12/11/24: plumbing underground at schematic #8 waste and vent passed ok to backfill. |
12/10/2024 | COT - LCBU - Preslab | N/A | Partial Pass | 12/3/24: partial pass for pre-slab at Area C south end and area d south end 12/10/24: reinforcement per plan at slab in rooms 141,137,171,172,177,179,179,183,182,184,180,181,185,186,187,194,193,189,190,191,192. |
12/24/2024 | COT - LCPL - Plumbing Progress | N/A | Partial Pass | 12-24-24, partial pressure test for system 1 waste & vent.Okay to backfill inspected area. |
11/07/2024 | COT - LCBU - Masonry Pregrout | N/A | Partial Pass | Southeast corner of structure; double CMU wall at 0’ - 4’, at areas : CRU #132, room #129, room #117 (North wall). OK to grout progress areas. |