Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCBU - Stem Wall/Retaining Wall
Permit Number - TC-COM-0423-00942
Inspection Description - COT - LCBU - Stem Wall/Retaining Wall
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2024 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | Stem wall/ area perimeter of locker rooms pending east wall. Perimeter of processing building including west wing wall of sally port area. Okay to grout progress areas. 10/17/2024 |
|
10/18/2024 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | east wall from evidence drop off 175 to CRU 132. Wall along the Men’s room 170, supply 171, armory 172. Okay to grout progress areas. 10/18/2024 | |
10/24/2024 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | Corridor wall west end of 149 and 176 all the way to south end of sally port. Break room 148. Open courtyard area. Corridor 142 and 113. Admin 111. North wall of those rooms. East wall of room 102,112, and 115. 10/24/2024 | |
10/28/2024 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | Vertical and horizontal reinforcements along with c hooks approved. Double width wall at CRU #132 - Detective #129 towards front lobby #116-#117 heading north. Public entrance (northeast). 1st lift. Okay to grout progress areas. 10/28/2024 | |
10/29/2024 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | Área D. West side. 181 north side. 4 adult pods. 189-192. 195,193,194,180,177,178,179. Okay to grout progress areas. 10/29/2024 | |
10/30/2024 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | Stem wall/ area perimeter of locker rooms pending east wall. Perimeter of processing building including west wing wall of sally port area. Okay to grout progress areas. 10/17/2024 east wall from evidence drop off 175 to CRU 132. Wall along the Men’s room 170, supply 171, armory 172. Okay to grout progress areas. 10/18/2024 Corridor wall west end of 149 and 176 all the way to south end of sally port. Break room 148. Open courtyard area. Corridor 142 and 113. Admin 111. North wall of those rooms. East wall of room 102,112, and 115. 10/24/2024 Vertical and horizontal reinforcements along with c hooks approved. Double width wall at CRU #132 - Detective #129 towards front lobby #116-#117 heading north. Public entrance (northeast). 1st lift. Okay to grout progress areas. 10/28/2024 Área D. West side. 181 north side. 4 adult pods. 189-192. 195,193,194,180,177,178,179. Okay to grout progress areas. 10/29/2024 10/30/24: reinforcement per plan at stem wall in rooms. 104,105,106,107,108,109,110 ok to fully grout progress areas. |
|
11/04/2024 | COT - LCBU - Stem Wall/Retaining Wall | Not Ready | Contractor cancelled due to inclement weather. | |
11/05/2024 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | North portion of structure ; Fire side of structure stem walls at rooms 253, 252, 251, 255, 254, 25^, 250, 221, 222< 220, 219, 218. OK to place grout in progress areas. | |
11/06/2024 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | Stem walls at Fire portion of building; turn-out, 253, 252, 251, 255, 254, 256, 250, 221, 222, 220, 219, 218. OK to place grout in progress areas. |