Parcel: 13216600A


Addresses:

4410 S PARK AV


Inspection Status: Partial Pass

Inspection History: COT - LCEL - Electrical Underground 

Permit Number - TC-COM-0423-00942

Inspection Description - COT - LCEL - Electrical Underground 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
10/18/2024 COT - LCEL - Electrical Underground  Partial Pass Partial pass. Electrical. Stubbed up vertically. D area. Out door receptacles. Controls for garage door. 10/18/2024
10/23/2024 COT - LCEL - Electrical Underground  Partial Pass Partial pass. Electrical. Stubbed up vertically. D area. Out door receptacles. Controls for garage door. 10/18/2024

10/23/24: electrical underground at MDF room 114 passed, (8)4” conduit 50’ run from building at SES to transformer, electrical underground for ATS per plans, electrical underground at room 196 per plans ok to proceed.
11/06/2024 COT - LCEL - Electrical Underground  Partial Pass Grounding system for Temporary Construction Power.
11/14/2024 COT - LCEL - Electrical Underground  Partial Pass Partial pass. Electrical. Stubbed up vertically. D area. Out door receptacles. Controls for garage door. 10/18/2024

10/23/24: electrical underground at MDF room 114 passed, (8)4” conduit 50’ run from building at SES to transformer, electrical underground for ATS per plans, electrical underground at room 196 per plans ok to proceed.
11/14/24: electrical underground passed from room 226 (COMM) to room 114 (MDF), storage room to ATS complete ok to backfill.
11/15/2024 COT - LCEL - Electrical Underground  Partial Pass Partial pass. Electrical. Stubbed up vertically. D area. Out door receptacles. Controls for garage door. 10/18/2024

10/23/24: electrical underground at MDF room 114 passed, (8)4” conduit 50’ run from building at SES to transformer, electrical underground for ATS per plans, electrical underground at room 196 per plans ok to proceed.
11/14/24: electrical underground passed from room 226 (COMM) to room 114 (MDF), storage room to ATS complete ok to backfill.

11/15/24: reinforcement/ grounding per plan at 3 light pole base SG at north west trash enclosure.
12/02/2024 COT - LCEL - Electrical Underground  Partial Pass Partial pass. Electrical. Stubbed up vertically. D area. Out door receptacles. Controls for garage door. 10/18/2024

10/23/24: electrical underground at MDF room 114 passed, (8)4” conduit 50’ run from building at SES to transformer, electrical underground for ATS per plans, electrical underground at room 196 per plans ok to proceed.
11/14/24: electrical underground passed from room 226 (COMM) to room 114 (MDF), storage room to ATS complete ok to backfill.

11/15/24: reinforcement/ grounding per plan at 3 light pole base SG at north west trash enclosure.
12/2/24: reinforcement/ grounding per plan at 2 light pole base one on north and one south of south entry on FAIR ST.
12/10/2024 COT - LCEL - Electrical Underground  Partial Pass Partial pass. Electrical. Stubbed up vertically. D area. Out door receptacles. Controls for garage door. 10/18/2024

10/23/24: electrical underground at MDF room 114 passed, (8)4” conduit 50’ run from building at SES to transformer, electrical underground for ATS per plans, electrical underground at room 196 per plans ok to proceed.
11/14/24: electrical underground passed from room 226 (COMM) to room 114 (MDF), storage room to ATS complete ok to backfill.

11/15/24: reinforcement/ grounding per plan at 3 light pole base SG at north west trash enclosure.
12/2/24: reinforcement/ grounding per plan at 2 light pole base one on north and one south of south entry on FAIR ST.
12/10/24:12/3/24: partial pass for pre-slab at Area C south end and area d south end
12/10/24: reinforcement per plan at slab in rooms 141,137,171,172,177,179,179,183,182,184,180,181,185,186,187,194,193,189,190,191,192.