Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Final
Permit Number - TC-COM-0423-00942
Inspection Description - COT - LCEL - Electrical Final
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2025 | COT - LCEL - Electrical Final | Partial Pass | 12-3-25: electrical final on electrical room-provide permanent schedules for all panels, open knockout at junction box at east wall of electrical room, weather resistant receptacles are required on all exterior receptacles [ same applies for rooftop, receptacles].Electrical final for room's, 143, 119, 120, 121, 145, 125, 126, 127, 160, 159, 158, 131, 123, 124, 130, 117, 131, 132, 134, 165, 133, 164, corridor 166, 168, 170, 169, 162, 171, 148, 151-add cover plates to receptacles at locker together with a shackle at breakers or disconnect electrical wires from breakers, 155-add cover plates & a shackle at breakers, 163, 162, 179, 187, 194, 175, 174, 173, 195. Reschedule inspection when listed above items have been corrected. Submit an RFI to the city for review/approval for the roof drains & SES, and a 3rd party inspection report for the outdoor lighting is required. |
|
| 12/05/2025 | COT - LCEL - Electrical Final | Partial Pass | 12-5-25: partial pass- on electrical final for room's 137, 13, 139, 105, 107, public lobby. Label all receptacles throughout-will verify at upcoming inspections. |
|
| 12/10/2025 | COT - LCEL - Electrical Final | Re-inspection required | 12/10/25: PD half of property: properly support EMT at RTU south east,WR receptacles required at RTU south east corner, seal conduits at roof(2), bathroom door push 5 pounds opening force, knee guards required at lavatories throughout, | |
| 12/11/2025 | COT - LCEL - Electrical Final | Partial Pass | 12-11-25: partial pass-electrical corrections made on PD half of property. |