Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - LCBU - Building Final
Permit Number - TC-COM-0423-00942
Inspection Description - COT - LCBU - Building Final
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2025 | COT - LCBU - Building Final | Re-inspection required | 12/10/25: registers (supply and return) at PD section of building approved, rooftop was walked and condensate drains were approved, disconnect boxes have been labeled and are all properly fused, Mini splits were properly installed at roof (pending discharge of condensate drains), 12/10/25: PD half of property: properly support EMT at RTU south east,WR receptacles required at RTU south east corner, seal conduits at roof(2), bathroom door push 5 pounds opening force, knee guards required at lavatories throughout, full walk through required for signs and ADA requirements. | |
| 12/12/2025 | COT - LCBU - Building Final | Partial Pass | 12-12-25: many of the required corrections have been addresses, however, restrooms are missing toilet paper dispensers, janitor rooms are missing hose/soap dispensers, and several lavatories in holding area must have the lavatories lowered to 34" AFF. Room 106 is missing knee guard-see plumbing notes for more details. Condensate drains have been installed-pending Engineering approval. |