Inspection Status: Partial Pass

Inspection History: COT - LCPL - Plumbing Progress 

Permit Number - TC-COM-0423-00942

Inspection Description - COT - LCPL - Plumbing Progress 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/08/2025 COT - LCPL - Plumbing Progress  Partial Pass 11/18/24: Plumbing underground for System 2 passed ok to proceed with backfill. Shading required
12/3/24: Partial plumbing pressure test on System 1 in area B. Ok to backfill shading required
12/5/24: domestic water from back flow preventer to building tie in attic south west corner under 100psi ok to backfill progress area.
12-24-24, partial pressure test for system 1 waste & vent.Okay to backfill inspected area.
1/8/25: plumbing underground at Area A rooms 251,252,253,254,255,256. Ok to backfill.
01/15/2025 COT - LCPL - Plumbing Progress  Partial Pass Plumbing underground in kitchen area; concrete has been placed in subject area.
01/17/2025 COT - LCPL - Plumbing Progress  Canceled Contractor cancelled.
01/22/2025 COT - LCPL - Plumbing Progress  Partial Pass 11/18/24: Plumbing underground for System 2 passed ok to proceed with backfill. Shading required
12/3/24: Partial plumbing pressure test on System 1 in area B. Ok to backfill shading required
12/5/24: domestic water from back flow preventer to building tie in attic south west corner under 100psi ok to backfill progress area.
12-24-24, partial pressure test for system 1 waste & vent.Okay to backfill inspected area.
1/8/25: plumbing underground at Area A rooms 251,252,253,254,255,256. Ok to backfill.
1/22/25: Sand/oil interceptor at south west corner under pressure ok to backfill.
01/31/2025 COT - LCPL - Plumbing Progress  Partial Pass 4” waste line in apparatus room,,approximately 50’. Ok to cover progress area.
02/11/2025 COT - LCPL - Plumbing Progress  Partial Pass Apparatus room Southeast area, 6” sewer line approximately 30’ for system #2. Ok to cover progress area.
02/13/2025 COT - LCPL - Plumbing Progress  Partial Pass Apparatus room, Bay #6 area, 6” line with 5 lateral lines (approximately 85’). Ok to cover progress areas.
02/20/2025 COT - LCPL - Plumbing Progress  Partial Pass 11/18/24: Plumbing underground for System 2 passed ok to proceed with backfill. Shading required
12/3/24: Partial plumbing pressure test on System 1 in area B. Ok to backfill shading required
12/5/24: domestic water from back flow preventer to building tie in attic south west corner under 100psi ok to backfill progress area.
12-24-24, partial pressure test for system 1 waste & vent.Okay to backfill inspected area.
1/8/25: plumbing underground at Area A rooms 251,252,253,254,255,256. Ok to backfill.
1/22/25: Sand/oil interceptor at south west corner under pressure ok to backfill.
2/20/25: Sewer underground at SW corner of Apparatus Bay under pressure and per plans.
05/08/2025 COT - LCPL - Plumbing Progress  Not Ready 5-8-25, not ready.
05/12/2025 COT - LCPL - Plumbing Progress  Partial Pass 5-12-25, partial pass for 4-4" Schedule 40 roof drains under test located in room 229. Okay to proceed with build at progress areas.
05/23/2025 COT - LCPL - Plumbing Progress  Partial Pass 5-23-25, storm drain's at corridor-201, community room and area A and B approved. Kitchen in wall DWV, domestic together with gas line verified under test and per plans. Okay to continue construction at progress areas.
06/05/2025 COT - LCPL - Plumbing Progress  Partial Pass 6/5/2025 Restroom 209 & 217 domestic water approved.
06/09/2025 COT - LCPL - Plumbing Progress  Partial Pass 211,209,224 area A plumbing in walls approved.
Area B. 237,238,239,240. In wall and OH. Approved.
06/13/2025 COT - LCPL - Plumbing Progress  Not Ready
06/17/2025 COT - LCPL - Plumbing Progress  Partial Pass 6-17-25: (In wall domestic/roof drains/gas line inspections)in wall domestic on restroom room 140, 4" Charlotte roof drains at corridor 136, open courtyard gas line, police courtyard hose bib and gas line-under test, room 148 domestic and DWV, room 151-domestic and 4-4" Charlotte roof drains, Area C & D (spray foam areas only)-room 132 domestic & 2-4" Charlotte roof drains, rm 129-4" Charlotte roof drains, fire riser rm 115-hose bib, Area-A kitchen in wall domestic and 3 Condensate lines at rm 222. Areas mentioned were verified under test and per approved plans-okay to continue construction at progress areas.
07/07/2025 COT - LCPL - Plumbing Progress  Partial Pass 7/7/25: plumbing intermediate in-wall at break room 123 per approved plans and under pressure.
07/23/2025 COT - LCPL - Plumbing Progress  Partial Pass Area A, rooms and restrooms 105, 107, 168, 172 in wall plumbing.
08/01/2025 COT - LCPL - Plumbing Progress  Partial Pass 8-1-25: in wall domestic Area D, room 147 verified per plans. Okay to continue construction at progress area.
08/07/2025 COT - LCPL - Plumbing Progress  Partial Pass 8-7-25: sewer connection verified per plans. Okay to backfill approximately 80' of 6" SDR35 PVC.
10/09/2025 COT - LCPL - Plumbing Progress  Partial Pass 10/9/25: 252-255 in wall domestic and DWV above ceiling
10/17/2025 COT - LCPL - Plumbing Progress  Partial Pass 10-17-25: all MEP's building above ceiling and in wall for rooms 254,255 and lockers 152&153 173,173,174,175,178,179, and 194 verified per plans. Okay to continue construction at progress areas.
10/28/2024 COT - LCPL - Plumbing Progress  Not Ready
10/29/2024 COT - LCPL - Plumbing Progress  Not Ready
10/29/2025 COT - LCPL - Plumbing Progress  Partial Pass 10-29-25: overhead domestic pressure test verified at 100psi at apparatus bay. Okay to continue with construction at progress areas.
11/10/2025 COT - LCPL - Plumbing Progress  Partial Pass 11/10/2025 partial pass tie in from Underground inspection for sand/oil interceptor to 4 trench drains north of apparatus bay. Okay to backfill progress areas.
11/13/2025 COT - LCPL - Plumbing Progress  Partial Pass 11-13-25: mechanical, electrical and plumbing above ceiling at Debriefing and interview lobby LMS approved. Okay to continue with construction at progress areas.
11/18/2024 COT - LCPL - Plumbing Progress  Partial Pass 11/18/24: Plumbing underground for System 2 passed ok to proceed with backfill. Shading required
11/22/2024 COT - LCPL - Plumbing Progress  Partial Pass Underground plumbing in area C. Ok to cover progress areas.
12/03/2024 COT - LCPL - Plumbing Progress  Partial Pass 11/18/24: Plumbing underground for System 2 passed ok to proceed with backfill. Shading required
12/3/24: Partial plumbing pressure test on System 1 in area B. Ok to backfill shading required
12/06/2024 COT - LCPL - Plumbing Progress  Partial Pass 11/18/24: Plumbing underground for System 2 passed ok to proceed with backfill. Shading required
12/3/24: Partial plumbing pressure test on System 1 in area B. Ok to backfill shading required
12/5/24: domestic water from back flow preventer to building tie in attic south west corner under 100psi ok to backfill progress area.
12/17/2024 COT - LCPL - Plumbing Progress  Not Ready Contractor cancelled.
12/24/2024 COT - LCPL - Plumbing Progress  Partial Pass 12-24-24, partial pressure test for system 1 waste & vent.Okay to backfill inspected area.