Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2026 | COT - LCME - Mechanical Final | Partial Pass | 4-17-26: mechanical final inspection at Fire side- provide " ADA-Knee Guards" on lavatories at Decon room & at the ADA restroom located in the dorm corridor. Decon room-Complete condensation line installation with 90 degree elbow over to floor drain. Note: pending exterior. I will inspect Final MEP's at rooftop at upcoming inspection. Also, extractor and any pending equipment must be installed for a full C of O. We can only issue a TCO Level 4 without having equipment installed. |
|
| 04/21/2026 | COT - LCME - Mechanical Final | Partial Pass | Roof inspection completed. Pending other items 4/21/2026 | |
| 12/10/2025 | COT - LCME - Mechanical Final | Partial Pass | 12/10/25: registers (supply and return) at PD section of building approved, rooftop was walked and condensate drains were approved, disconnect boxes have been labeled and are all properly fused, Mini splits were properly installed at roof (pending discharge of condensate drains), | |
| 12/17/2025 | COT - LCME - Mechanical Final | Not Ready |