Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Masonry Pregrout
Permit Number - TC-COM-0423-00942
Inspection Description - COT - HCBU - Masonry Pregrout
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | ||
| 03/25/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 3-25-25, reinforcement per plans on separation wall between the dorms at 18' 8". Public lobby east lintel 23' 4" & Fire court yard north wall @ 26' 8". Okay to grout. | |
| 03/27/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | Locker room walls at 0’ - 4’; supply/armory walls at 9’ 4”; dormitory/kitchen wall at 23’4”; public entry area topped-out at 26’8”. Ok to grout progress areas. | |
| 03/28/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 3-25-25, reinforcement per plans on separation wall between the dorms at 18' 8". Public lobby east lintel 23' 4" & Fire court yard north wall @ 26' 8". Okay to grout. 3/28/25: reinforcement per plan at Locker Rooms East Wall (Elev 4'8"-9'4"), (rooms (178,177,179,183) East wall (Elev 4'8"-9'4")). |
|
| 04/02/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 4-2-25, reinforcement per plans on corridor lintel #201-(south lintel) at 18' 8". Okay to grout | |
| 04/11/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 3-25-25, reinforcement per plans on separation wall between the dorms at 18' 8". Public lobby east lintel 23' 4" & Fire court yard north wall @ 26' 8". Okay to grout. 3/28/25: reinforcement per plan at Locker Rooms East Wall (Elev 4'8"-9'4"), (rooms (178,177,179,183) East wall (Elev 4'8"-9'4")). 4-2-25, reinforcement per plans on corridor lintel #201-(south lintel) at 18' 8". Okay to grout. 4/11/25: reinforcement per plan at Locker rooms (NORTH,SOUTH, AND WEST) top out., East wall corridor 201 lintel. |
|
| 04/14/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 3-25-25, reinforcement per plans on separation wall between the dorms at 18' 8". Public lobby east lintel 23' 4" & Fire court yard north wall @ 26' 8". Okay to grout. 3/28/25: reinforcement per plan at Locker Rooms East Wall (Elev 4'8"-9'4"), (rooms (178,177,179,183) East wall (Elev 4'8"-9'4")). 4-2-25, reinforcement per plans on corridor lintel #201-(south lintel) at 18' 8". Okay to grout. 4/11/25: reinforcement per plan at Locker rooms (NORTH,SOUTH, AND WEST) top out., East wall corridor 201 lintel. 4/14/25: Reinforcement per plan at Locker room east wall top out, public lobby east 101, evidence drop off room 175 west wall, |
|
| 04/15/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 4/15/25 west wall of 163. (14'-18'). West wall of 175,176. (14'-16'8"). West wall room 201. (13'4"-17'4"). East wall room 201 (16'-20'). North and east wall of rooms 251-257. (0-4'8"). West wall of room 257 (0-4'8"). Approved for grout per third party report. | |
| 04/18/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 3-25-25, reinforcement per plans on separation wall between the dorms at 18' 8". Public lobby east lintel 23' 4" & Fire court yard north wall @ 26' 8". Okay to grout. 3/28/25: reinforcement per plan at Locker Rooms East Wall (Elev 4'8"-9'4"), (rooms (178,177,179,183) East wall (Elev 4'8"-9'4")). 4-2-25, reinforcement per plans on corridor lintel #201-(south lintel) at 18' 8". Okay to grout. 4/11/25: reinforcement per plan at Locker rooms (NORTH,SOUTH, AND WEST) top out., East wall corridor 201 lintel. 4/14/25: Reinforcement per plan at Locker room east wall top out, public lobby east 101, evidence drop off room 175 west wall, 4/15/25 west wall of 163. (14'-18'). West wall of 175,176. (14'-16'8"). West wall room 201. (13'4"-17'4"). East wall room 201 (16'-20'). North and east wall of rooms 251-257. (0-4'8"). West wall of room 257 (0-4'8"). Approved for grout per third party report. 4/18/25: reinforcement per plan at Corridor 201 east wall, north east locker room top out, 2nd lift at rooms (254,251,252,253,255) approved. |
|
| 04/22/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 3-25-25, reinforcement per plans on separation wall between the dorms at 18' 8". Public lobby east lintel 23' 4" & Fire court yard north wall @ 26' 8". Okay to grout. 3/28/25: reinforcement per plan at Locker Rooms East Wall (Elev 4'8"-9'4"), (rooms (178,177,179,183) East wall (Elev 4'8"-9'4")). 4-2-25, reinforcement per plans on corridor lintel #201-(south lintel) at 18' 8". Okay to grout. 4/11/25: reinforcement per plan at Locker rooms (NORTH,SOUTH, AND WEST) top out., East wall corridor 201 lintel. 4/14/25: Reinforcement per plan at Locker room east wall top out, public lobby east 101, evidence drop off room 175 west wall, 4/15/25 west wall of 163. (14'-18'). West wall of 175,176. (14'-16'8"). West wall room 201. (13'4"-17'4"). East wall room 201 (16'-20'). North and east wall of rooms 251-257. (0-4'8"). West wall of room 257 (0-4'8"). Approved for grout per third party report. 4/18/25: reinforcement per plan at Corridor 201 east wall, north east locker room top out, 2nd lift at rooms (254,251,252,253,255) approved. 4/22/25: reinforcement per plans at 3rd lift at rooms (254,251,252,253,255) |
|
| 04/24/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 3-25-25, reinforcement per plans on separation wall between the dorms at 18' 8". Public lobby east lintel 23' 4" & Fire court yard north wall @ 26' 8". Okay to grout. 3/28/25: reinforcement per plan at Locker Rooms East Wall (Elev 4'8"-9'4"), (rooms (178,177,179,183) East wall (Elev 4'8"-9'4")). 4-2-25, reinforcement per plans on corridor lintel #201-(south lintel) at 18' 8". Okay to grout. 4/11/25: reinforcement per plan at Locker rooms (NORTH,SOUTH, AND WEST) top out., East wall corridor 201 lintel. 4/14/25: Reinforcement per plan at Locker room east wall top out, public lobby east 101, evidence drop off room 175 west wall, 4/15/25 west wall of 163. (14'-18'). West wall of 175,176. (14'-16'8"). West wall room 201. (13'4"-17'4"). East wall room 201 (16'-20'). North and east wall of rooms 251-257. (0-4'8"). West wall of room 257 (0-4'8"). Approved for grout per third party report. 4/18/25: reinforcement per plan at Corridor 201 east wall, north east locker room top out, 2nd lift at rooms (254,251,252,253,255) approved. 4/22/25: reinforcement per plans at 3rd lift at rooms (254,251,252,253,255) 4/24/25: reinforcement per plan at North wall of Rooms (254,255,256,257)Elev 9'4"-14', East walls (254,256,257) Elev 9'4"-14'., West wall of room 257 Elev 9'4"-14'. |
|
| 04/28/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 4-28-25, Storage,turnout, workshop, Docon, scba rooms #251, 252, 253, 255 & 256 for interior walls are at top out-18' 8". Exterior walls at 5th lift 18' 8"- okay to pour grout. | |
| 04/30/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 4-30-25, reinforcement per plan-top out at 20' for room's 255&256. Room's 251-254 at 18' 8"-okay to grout. | |
| 05/01/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-1-25, reinforcement verified per plan on rooms 178-194(minus toilet areas together with exterior walls). Okay to grout progress areas on 1st lift at 4'. | |
| 05/02/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-2-25, reinforcement verified per plans for exterior walls at turnout area.Okay to pour grout 6th lift at 23' 4". | |
| 05/06/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-6-25, reinforcement at turnout verified -okay to pour top out 26'8", reinforcement for electrical room #196-second lift at north & east wall., reinforcement at processing area on bathrooms verified-okay to pour at 1st lift | |
| 05/08/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-8-25, east & north wall electrical wall room, 191, 192, corridor-188, 181 southwest north wall, 183, 193 @ 9' 4" 2 lift-okay to grout. | |
| 05/13/2025 | COT - HCBU - Masonry Pregrout | Canceled | 5-13-25, canceled by contractor. | |
| 05/15/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | Interior walls of Processing Area,topped-out at 12’2”; Ok to place grout in progress areas (rooms 178 - 194). | |
| 05/20/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | Area B, dorm rooms #184 - 190 at 9’4”; SES electric room at 14’4”; Electric room and bike room at 12’8”; exterior walls North 4’8”, West at 9’4”, South at 9’4”. Ok to place grout in,progress areas. | |
| 05/21/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | Processing area exterior walls; Electric room,,bike storage, rooms 181 - 190 at 16’4”; beam pockets at 15’ 3”. Ok to,grout progress areas. | |
| 05/22/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-8-25, east & north wall electrical wall room, 191, 192, corridor-188, 181 southwest north wall, 183, 193 @ 9' 4" 2 lift-okay to grout. 5-13-25, canceled by contractor. 5/22/25:3rd @ room#195,196 West wall, 3rd lift @rooms 184,185,186,187,188,189,190 South wall, 3rd lift @ room 184 East wall. |
|
| 05/22/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 3-25-25, reinforcement per plans on separation wall between the dorms at 18' 8". Public lobby east lintel 23' 4" & Fire court yard north wall @ 26' 8". Okay to grout. 3/28/25: reinforcement per plan at Locker Rooms East Wall (Elev 4'8"-9'4"), (rooms (178,177,179,183) East wall (Elev 4'8"-9'4")). 4-2-25, reinforcement per plans on corridor lintel #201-(south lintel) at 18' 8". Okay to grout. 4/11/25: reinforcement per plan at Locker rooms (NORTH,SOUTH, AND WEST) top out., East wall corridor 201 lintel. 4/14/25: Reinforcement per plan at Locker room east wall top out, public lobby east 101, evidence drop off room 175 west wall, 4/15/25 west wall of 163. (14'-18'). West wall of 175,176. (14'-16'8"). West wall room 201. (13'4"-17'4"). East wall room 201 (16'-20'). North and east wall of rooms 251-257. (0-4'8"). West wall of room 257 (0-4'8"). Approved for grout per third party report. 4/18/25: reinforcement per plan at Corridor 201 east wall, north east locker room top out, 2nd lift at rooms (254,251,252,253,255) approved. 4/22/25: reinforcement per plans at 3rd lift at rooms (254,251,252,253,255) 4/24/25: reinforcement per plan at North wall of Rooms (254,255,256,257)Elev 9'4"-14', East walls (254,256,257) Elev 9'4"-14'., West wall of room 257 Elev 9'4"-14'. 4-28-25, Storage,turnout, workshop, Docon, scba rooms #251, 252, 253, 255 & 256 for interior walls are at top out-18' 8". Exterior walls at 5th lift 18' 8"- okay to pour grout. 4-30-25, top out at 20' for room's 255&256. Room's 251-254 at 18' 8"-okay to grout. 5-1-25, reinforcement verified per plan on rooms 178-194(minus toilet areas together with exterior walls). Okay to grout progress areas on 1st lift at 4'. 5-2-25, reinforcement verified per plans for exterior walls at turnout area.Okay to pour grout 6th lift at 23' 4". |
|
| 05/28/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 5-8-25, east & north wall electrical wall room, 191, 192, corridor-188, 181 southwest north wall, 183, 193 @ 9' 4" 2 lift-okay to grout. 5-13-25, canceled by contractor. 5/22/25:3rd @ room#195,196 West wall, 3rd lift @rooms 184,185,186,187,188,189,190 South wall, 3rd lift @ room 184 East wall. 5/28/25:reinforcement per plan at south wall of rooms 196, 190 elev 16'-20'. West wall rooms 195, 196 elevation 16'-20'. North walls of room 195 elevation 12'-16'. West wall room 197 elevation 0'-4'8". |
|
| 06/02/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 1/8/25: reinforcement per plan at apparatus bay east wall and piers from 14'-18', apparatus bay west wall and piers top out per plan ok to proceed with grout. Reinforcement per plan at south walls in the public lobby, mdf, tactics, exam/atpt off, fitness ok to grout first lift from 4'8"-8'. Ok to proceed with grout at progress areas. 1/22/25: reinforcement per plans at apparatus bay south west piers. North wall of rooms (143,142,113,111,102,) per plan at third lift ok to continue, first lift at west and south walls rooms (195,192,196,190). 2/3/25: reinforcement approved by third party inspector at East wall of rooms (102,112,115,116,117) Elevation 9'4" to 14', North Wall of rooms (116 (Lintels)) Elevation 12' to 14', West wall Column at SW Corner of room (205) Elevation 14' to 18'8". 3-4-25, partial pass-pre grout for captain's office (room 218) captain's dorms (213 &215), top out at community room 108). Okay to grout 5 lift at 23' 4" 3/7/25: canceled per Contractor 3/20/25: First lift from 0’-4’8” at west wall of rooms (163,149,176,172,171,164), first lift from 0’-4’8” East walls of rooms (176,172,171), first lift from 0’-4’8” south walls in rooms (176,172,171,170), south wall of room 223 at 26’ approved, west walls of rooms ( 226,225,224,223) at 14’. 3/21/25: reinforcement per plan at south wall of room 208 and 205 18'8"-23'4" 3/24/25: reinforcement per plans at east wall courtyard (police) 16'8-20', south wall courtyard (police) 16'8"-20',west wall of courtyard (police) 16'8"-20', 3/28/25: reinforcement per plan at Locker Rooms East Wall (Elev 4'8"-9'4"), (rooms (178,177,179,183) East wall (Elev 4'8"-9'4")). 4-1-25, reinforcement per plans on east wall of community room at 23' 4"-okay to grout. 5-9-25, reinforcement on interior walls -Section D, rooms 177-184 verified per plans. Okay to grout 2nd lift at 9' 4". |
|
| 06/03/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | Celly port East wall at top out. Room 173 first lift. Okay to grout progress areas. 6/3/2025 | |
| 06/04/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | 6-4-25: reinforcement at cmu wall on room173 verified per plans. Okay to pour 2nd lift at 9' 4". | |
| 06/05/2025 | COT - HCBU - Masonry Pregrout | Partial Pass | Bull evidence Room 173 3rd lift at top out approved. Okay to grout progress areas. 6/5/2025 |