Permit: T03CM02796
Permit Details
Apply Date:
06/06/2003
Applicant:
ADRIANNE WALKER
Description:
NEW:HOTEL PHASE VII
Contractors:
- WEITZ COMPANY
- WEITZ COMPANY L L C *C
Permit Reviews
Permit Number - T03CM02796
Permit Status: C of o
Permit Description: NEW:HOTEL PHASE VII
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/13/2005 | 3RD PARTY REVIEW-REVISION/OTHER | 04/15/2005 | COMPLETED |
| 06/06/2003 | PLANS OK TO SUBMIT - 3RD PARTY | 06/06/2003 | COMPLETED |
| 06/09/2003 | 3RD PARTY REVIEW-COMMERCIAL | 07/03/2003 | COMPLETED |
| 07/06/2005 | 3RD PARTY REVIEW-REVISION/OTHER | 08/05/2005 | COMPLETED |
| 07/14/2003 | 3RD PARTY REVIEW-REVISION/OTHER | 08/06/2003 | COMPLETED |
| 07/21/2005 | 3RD PARTY REVIEW-REVISION/OTHER-2ND | 08/05/2005 | COMPLETED |
| 07/25/2003 | 3RD PARTY REVIEW-REVISION/OTHER | 07/31/2003 | COMPLETED |
| 08/08/2003 | 3RD PARTY REVIEW-REVISION/OTHER | 08/26/2003 | COMPLETED |
| 08/25/2003 | 3RD PARTY REVIEW-REVISION/OTHER | 09/08/2003 | COMPLETED |
| 09/03/2003 | 3RD PARTY REVIEW-REVISION/OTHER | 09/16/2003 | COMPLETED |
| 09/09/2004 | 3RD PARTY REVIEW-REVISION/OTHER | 09/21/2004 | COMPLETED |
| 09/30/2003 | 3RD PARTY REVIEW-COMMERCIAL | 10/15/2003 | COMPLETED |
| 10/16/2003 | 3RD PARTY REVIEW-COMMERCIAL | 12/24/2003 | COMPLETED |
| 12/13/2004 | 3RD PARTY REVIEW-REVISION/OTHER | 01/10/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T03CM02796
Permit Status: C of o
Permit Description: NEW:HOTEL PHASE VII
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/06/2003 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T03CM02796
Permit Description: NEW:HOTEL PHASE VII
Total Completed Inspections - 37
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2004 | MECHANICAL - TEMP PWR FOR TEST | CWILLIAM | Approved | |
| 06/23/2004 | PLUMBING - TEMP POWER FOR TEST | TRINIVJR | Approved | |
| 06/23/2004 | BUILDING - TEMP POWER FOR TEST | AMATHIES | Approved | |
| 08/19/2004 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | IVRS - Inspection :*/ 1) SOIL WATER TEST IS OK FOR GREASE INTERCEPTOR VENT AND OUTLET WASTE LINE TO P.O.C. 2) OK TO BACKFILL TRENCH 3) SOIL AIR PRESSURE TEST IS OK FOR BLDG G LEVEL 2, 3, 4 AND UP THEN ROOF ROOM # 4214, 4216, 5214, 5216, 6214, 6216 AS NOTED ON PLAN 4) 6" RWL WATER TEST IS OK FOR BLDG G LEVEL 1 AND 2 AS NOTED ON PLAN 5) MENS RESTROOM TRAP ARMS ARE OK FOR BLDG J BETWEEN JUNIOR AND GTLAND BALLROOMS 6) AIR PRESSURE TEST IS OK FOR HOT AND COLD WATER DISTRIBUTION FOR BLDG D AND E KNUCKLE ROOMS #4081, 4082, 4084, 5081, 5084, 6081, 6084, 7081, 7084, 8081, 8084 |
| 09/10/2004 | ELECTRIC - TEMP POWER FOR TEST | DSANTACR | Approved | IVRS - Inspection :* |
| 09/13/2004 | TEP CLEARANCE - AM | JKOZUCH | Approved | ECO M3 ONLY |
| 09/21/2004 | BUILDING ABOVE CEILING | TRINIVJR | Approved | 1)SOIL WATER TEST IS OK FOR BLDG. G1 RESTROOM 330 &333 AND SHAMPOO SINK AREA AS NOTED ON PLAN 2)SOIL WATER TEST IS OK FOR VENTS IN BLDG H AIR HANDLE AREA 3)OVERHEAD WATER DISTRIBUTION IS OK FOR MECH RM LEVEL 7 D-WEST RM M901 COMPLETE.4)WATER DISTRIBUTIO FOR LEVEL G P-1 RM 243, 245 IS OK AS NOTED ON PLAN 5)FLOOR SINK IN BLDG. G LEVEL 2 WATER TEST IS OK |
| 10/13/2004 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :*/LEVEL 2 BUILDING H, LEVEL 3 BUILDING H, LEVEL 4 BUILDING H, INCLUDING MAINS FROM G&H KNUCKLE ON LEVEL 4 TO 4" COLD AND 3" HOT TO BE CONTINUED DOWN AT EAST END 110 PSI AIR TEST OK. SHADE PAVILLION AREA, TEST ON AREA DRAINS WATER TEST OK LEVEL 4 BUILDING E CLOSET FLANGES OK |
| 11/03/2004 | PLUMBING - INTERMEDIATE | TRINIVJR | Approved | IVRS - Inspection :*/1)HAD MEETINGS WITH PLBG. CONTRACTOR FOR TEMP C 0F O. REQUREMENTS |
| 11/18/2004 | FIRE - FINAL | LTHOMAS | Approved | O.K for Temporary C of O, for Marriott staff only, in the following areas: 1. Wings A, B & C all floors through Level 4. 2. Corridors and Restrooms Parking Level 1, Area D. 3. Employee Locker Rooms and Cafeteria Wing G.(No food preparation requiring Type 1 Exhaust Hood.) 4. Staff offices Wing H. 5. Ballrooms Wings I and J. 6. Parking Level P-3. 7. Corridors Parking Level P-1 from parking to Wings A, B, & C. Temporary C of O is granted with the understanding that the fire protection systems serving the approved areas will be in service at all times, and that no portion of the facility will be open to public occupancy until all areas are completed. |
| 12/02/2004 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* |
| 12/14/2004 | ELECTRIC - ABOVE CEILING | RMAJUTA | Approved | IVRS - Inspection :*/1)LEVEL 1 LOBBY BETWEEN BLD G & H OK. 2)LEVEL P-1 ELEVATOR LOBBY OK 3)LEVEL P-1 BLD H 6 MEETING ROOMS OK. CONTRACTOR TO CLOSE OFF OPEN J-BOXES. ALL ABOVE OK TO COVER |
| 12/14/2004 | FIRE - ALARM FINAL | LTHOMAS | Approved | |
| 12/20/2004 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection :*/KITCHEN W/TYPE I HOODS MUST BE COMPLETELY FINISHED AND FIRE CONTROL SYSTEM APPROVED BY T.F.D. PRIOR TO TURNING OVER FOR OPERATION. ALL KITCHEN AREAS. RM. CHILD ACTIVITY CONNOT ELIMINATE ACCESS PANELS TO REACH SMOKE FIRE DAMPER ACTIVATORS |
| 12/20/2004 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | IVRS - Inspection :* |
| 12/27/2004 | PLUMBING - GAS PRESSURE TEST | TRINIVJR | Approved | IVRS - Inspection :*/1)GAS PRESSURE TEST IS OK 2)THIS INSPECTIN IS FOR GAS LINES FOR PATIO HTRS ONLY. |
| 12/28/2004 | MECHANICAL - ABOVE CEILING | CWILLIAM | Approved | IVRS - Inspection :*/CASUAL KITCHEN OK. OK TO USE WHEN RELEASED BY TFD |
| 12/29/2004 | ELECTRIC - FINAL | RMAJUTA | Approved | IVRS - Inspection :* 1) CASUAL KITCHEN P-1C OK TO OCCUPY 2) FLOOR EP-1 3) ELECTRIC ROOM LEVEL 2 WING D AND E 4) MISSING FIXTURES IN HALLWAY LEVEL P-1 #2) 5) STAR BUCKS COFFEE SHOP INCLUDING PANEL AND FEEDER OK TO OCCUPY 6) ROOMS LEVEL 1-E OK 7) ROOMS LEVEL 2-E OK 8) ROOMS LEVEL 3-E OK 9) ROOMS LEVEL 3-D OK 10) ROOMS LEVEL L 4 E OK 11) ROOMS LEVEL 4-D OK 12) ROOMS LEVEL 5-D OK 13) ROOMS LEVEL 5-E OK 14) ROOMS LEVEL 6-D OK 15) BLDG P-1 I-NOT COMPLETE 16) BLDG P-1 H-NOT COMPLETE 17) ALL DBL SUITE FLOORS 5 AND 6, ADDED ON FANS NOT FINISHED |
| 12/30/2004 | BUILDING - PROGRESS | LHANLY | Approved | IVRS - Inspection :* PROGRESS ON SHAFT WALLS IN STAIR H OK |
| 12/30/2004 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection :* TO COMPLETE A-E FOR PUBLIC C OF O 1) FINISH PAVILLION STAIRS, RAMPS, HANDRAILS. 2) FINISH ENTRY FLAT WORK AND LIGHTING 3) COMPLETE ADA REQUIREMENTS A) LAVATORIES@ 34 1/2" OR LESS HAVE BEEN APPROVED PER THE DIMENSIONAL TOLERANCE PROVISION IN THE ADAAE GUIDELINES B) OTHER DISCREPANCIES MUST BE ADDRESSED BY REPAIR OR APPEAL THROUGH BUILDING OFFICIAL. THIS INCLUDES AREA AT REFUGE REQUIREMENTS. |
| 12/30/2004 | FRAMING | LHANLY | Approved | IVRS - Inspection :* |
| 12/31/2004 | PLUMBING - FINAL | TRINIVJR | Approved | IVRS - Inspection :* 1) WOMENS RESTROOM FOR POOL BAR IS OK 2) LOBBY BAR FINAL IS OK 3) NOTE: MENS POOL BAR RESTROOM THERE IS ONE WATER CLOSET THAT DOES NOT MEET MIN SIDE WALL CLEARANCE |
| 01/24/2005 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
| 01/24/2005 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
| 01/24/2005 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
| 05/24/2005 | OUTDOOR LIGHTING FINAL | RMAJUTA | Approved | |
| 06/30/2005 | FIRE - KITCHEN EXH HOOD FINAL | LTHOMAS | Approved | |
| 06/30/2005 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
| 06/30/2005 | RIGHT OF WAY - FINAL | LLOPEZ | Approved | |
| 07/05/2005 | ENGINEERING - FINAL | DROBERTS | Approved | C OF O APPROVED |
| 08/01/2005 | SIGN - FINAL | DCAPPLE | Approved | |
| 08/05/2005 | PERMIT FINALED | JMORALES | Approved | |
| 08/05/2005 | ELECTRIC - PROGRESS | RMAJUTA | Approved | |
| 08/05/2005 | ELECTRIC - CONSTRUCTION POWER | RMAJUTA | Approved | |
| 08/05/2005 | PLUMBING - SEWER HCS CONNECT | TRINIVJR | Approved | |
| 08/05/2005 | PLUMBING - ROOF DRAINS | TRINIVJR | Approved | |
| 08/05/2005 | PLUMBING - ABOVE CEILING | TRINIVJR | Approved |