Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2005 | BUILDING - FINAL | Approved | IVRS - Inspection :* APPROVED - OK FINAL C OF O |
|
| 05/23/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* 1) BLDG AND EGRESS COMPLETE. FINAL PENDING AS-BUILT APPROVAL BY OTHER TRADE INSPECTORS AND FINAL SPECIAL INSPECTION CERTIFICATION |
|
| 04/25/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* HAND RAIL AT STAIR 19 OK, STAIR 16 NOT READY. | |
| 04/22/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* OK TO OPEN " PRIMO SPECIALTY RESTAURANT | |
| 04/19/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* SPECIALTY KITCHEN OK TO STOCK & FIRE. NO PLUBLIC UNTIL STAIR COMPLETE. VENT SHIFT OPENINGS OK N SIDE. | |
| 03/02/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* HANDRAIL AT STAIR 16 DOES NOT MEET REQUIREMENTS OF UBC 1006.9 | |
| 01/26/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* 1) TCO TO PUBLIC NOW INCLUDES ALL AREAS EXCEPT SPECALTY KITCHEN 2) OCCUPANCY OF SPECIALTY SHOPS PREDICATED ON COMPLETION OF SEPARATE T.I PERMIT. | |
| 01/22/2005 | BUILDING - FINAL | Partial Approval | AFTER HOURS INSPECTION 108.00 TO BE CHARGED TO APA ACCOUNT. TMEPORARY C OF O EXPANDED TO INCLUDE LEVEL 4/ G & H GUEST ROOMS. THE PUBLIC T.C.O NOW INCLUDES ALL GUESTROOMS, BALLROOMS, POOLS, CONFERENCE ROOMS, BACK AT HOUSE AREAS AND POOLS AND SPA. 2) EXCLUDED AT THIS TIME ARE THE SPECIALTY SHOPS, SPECIALTY KITCHEN, AND OUTDOOR BALLROOM. |
|
| 01/21/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* TCO FOR PUBLIC EXPANDED TO INCLUDE LEVELS 2 & 3 AREAS G & H GUEST ROOMS. FOR TCO LEVEL 4 FINISH ROCK STAIR 21, SERVICE ELEVATOR LOBBY BGO5, AND 2 HR SHAFT EXTENSIONS IN STAIR 18. | |
| 01/20/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* TCO FOR PUBLIC USE EXTENDED TO AREA G & H LEVEL PI -EXERCISE ROOMS & PATIOS ALL LEVEL P2 -SPAS, LOCKERS, JUICE BARS LAP POOL AND JACUZZI LOUNGES & TREATMENT ROOMS. REMAINING AREAS OFF LIMITS TO PUBLIC ARE 1) OUTDOOR BALL ROOM 2) G & H GUEST ROOMS 3) SPECIALTY SHOPS AND KITCHEN | |
| 01/19/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* 1) STAIR 18 FIRE STOP & SHAFT EXTENSION REQUIRED. 2) CARPET & BLOCK STAIR 16 FOR LEVEL P1 3) EXIT SIGNS & FINALS FOR LEVEL P2 | |
| 01/14/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :*PARTIAL APPROVAL-(1) PER STEVE LONG HAVE GUARD @ PAVILLION LANDING. (2) CLEAR OUT CONST. STUFF @ BUS TURNAROUND. | |
| 01/13/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* RECOMMENDATION FOR T.C.O FOR PAYING PUBLIC WILL BE MADE FOR AREAS A-E ALL LEVELS: F,G,H LEVELS PI AND I ( WITH EXCEPTION AT SPECIALTY SHOPS, SPECIALTY KITCHEN, WEIGHT & MOVEMENT ROOMS) AND ALL LEVELS OF I, J CONFERENCE WING. THIS RECOMMENDATION WILL BE REVIEWED BY STEVE LONG, THE INSPECTIONS SUPERVISOR AND MAY NOT GO INTO EFFECT UNTIL APPROVED BY HIM. PLEASE HAVE ENGINEER STAMPED RFI FOR VENTILATION CHANGE IN B-111 AVAILABLE | |
| 01/12/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* THERE IS A SERIOUS ISSUE CONCERNING USING STORAGE ROOM B-111 AS APRT OF A PLENUM AIR RETURN, THIS VIOLATES SECTION 601. 3 OF 1994 UMC ALSO BOILERS IN B-111 VIOLATE SECTION 601.2 ALSO YOU NEED COMBUTION RELIEF FOR POOL BOILERS. THIS MUST BE DEALT WITH BY DESIGN PROFFESSIONAL ASAP THIS IS HOLDING UP T.C.O FOR PUBLIC USE. | |
| 01/11/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* AREAS A-E AND F,G,H -PL & 1 AND CONFERENCE WING. FOR TCO TO PUBLIC ( EXCLUDING WEIGHT, MOVEMENT AND SPECIALTY SHOPS) 1) CONSTRUCTION PERSONAL ONLY SIGNS FOR OUTDOOR BALL?? UNTIL HARDSCAPE & HANDRAILS COMPLETE. 2) CONSTRUCTION BARRICADES @ OUTDOOR DROP OFF UNTIL WORK DONE. 3) PLUMBING FINAL FOR G-1 RESTROOMS 4) REVERSE SWING TO ACCESSIBLE TOILET MEN'S ROOM BY P??BAR? FOR FINAL AT ABOVE AREAS 1) MORE EXIT SIGNS FROM H-1 SALONS AND AS NOTED G-1 2) FINAL ELECTRIC 3) COMPLETE SPECIALTY SHOPS, SPECIALTY KITCHEN, AND EXERCISE AREA. 4) FINISH HADRAILS @ PAVILLION ?? 5) FINISH GUARD AT STAIR AND PAVILLION LANDINGS | |
| 01/07/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* 1) ADA GUESTROOMS DONE 2) HOSPITALITY SUITES DONE 3) MARIOTT STAFF MAY MOVE INTO LOBBY AREAS |
|
| 01/06/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :*/1)DONE: A)LOBBY BAR B)CASUAL RESTAURANT AND TERRACE (MINUS STAIR 3) C)STARBUCKS D)ROOL BAR E)PORT COCHERE F)FOUNTAIN 2)NOT DONE: A)NONE OF THE SIGNAGE REQUIRED BY 1994 UBC IN ACCESSIBLE SPACE'S COMPLIES WITH SECTION 703.6 OR 703.7 OF THE REFERENCED ANSI STANDARD. THESE MUST COMPLY FOR T.C.O. 3)OK TO RUN POOL HOUSE | |
| 01/04/2005 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :*POOL BAR & KITCHEN OK 1) ALL A.D.A SIGNAGE REQUIRED BY CHAPTER 11 AND ANSI MUST BE IN PLACE. 2) ELECTRIC FINAL REQUIRED IN ALL OFFICES, LAUNDRIES, ETC LEVELS II AND I AREAS FGHIJ. 3) CLOSERS REQUIRED ON 3'6'' SERVICE ROOM DOORS. 4) STAIR 3 GUARDS AND PAVILLION GUARDS TOO LOW. 5) PUBLIC RESTROOMS IN LOBBY REQUIRE ?? INSULATED AND ADA SIGNAGE. 6) THRESHOLD @ LOBBY ENTRY MISSING 7) SMOKE SEALS @ THRESHOLDS FOR STAIRS IN PARKING GARGE. | |
| 12/30/2004 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* TO COMPLETE A-E FOR PUBLIC C OF O 1) FINISH PAVILLION STAIRS, RAMPS, HANDRAILS. 2) FINISH ENTRY FLAT WORK AND LIGHTING 3) COMPLETE ADA REQUIREMENTS A) LAVATORIES@ 34 1/2" OR LESS HAVE BEEN APPROVED PER THE DIMENSIONAL TOLERANCE PROVISION IN THE ADAAE GUIDELINES B) OTHER DISCREPANCIES MUST BE ADDRESSED BY REPAIR OR APPEAL THROUGH BUILDING OFFICIAL. THIS INCLUDES AREA AT REFUGE REQUIREMENTS. |
|
| 12/29/2004 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* 1) CASUAL KITCHEN OK TO OCCUPY |
|
| 12/28/2004 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :*/THE ONLY AREAS THAT WERE OPENED TO MARRIOTT WERE GUEST ROOMS A-E FOR STOCKING; BALLROOMS I,J FOR TRAINING; PARKING P-3 FOR PARKING. THE LOBBIES A-E, THE KITCHENS, THE SPAS, THE POOLS, THE PUBLIC RESTROOMS ETC. HAVE NOT BEEN RELEASEED! CONSTRUCTION AREAS F.G.H. HAVE NOT BEEN RELEASED! | |
| 12/23/2004 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* | |
| 12/22/2004 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* 1) TO MAINTAIN T.C.O. SERVICE ROADS MUST BE CLEAR WITH ABSOLUTELY NO PARKING, STANDING, STOPPING DUMPSTERS ETC. ALONG HYDRANT SIDE OF ROAD WITH AT LEAT 20' IN WIDTH AVAILABLE WHEN ANYTHING IS BLOCKING ONE SIDE AT ROAD 2) CITY OF TUCSON WILL TICKET AND TOW IF NECESSARY BEGINING MONDAY |
|
| 12/21/2004 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* 1) GUESTROOMS ABC T.C.O. CHANGE TO ALLOW MARIOTT STAFF TO START SLEEPING ON SITE 2) THIS IS ACCEPTABLE IF AREA SEPERATION DOORS TO AREA D STAY OPERABLE AND ARE NOT BLOCKED OPEN 3) THIS DOES NOT CONSTITUTE A FINAL FOR THIS AREA. THERE ARE STILL ADA SIGNAGE AND CLEARANCE ISSUES FOR THIS AREA 4) ALSO FIRE ACCESS ROADS MUST BE CLEARED. THIS MEANS NO MORE PARKING, STANDING DUMPSTERS, ETC... ALONG HOTEL SIDE OF SERVICE ROAD |
|
| 12/20/2004 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 12/17/2004 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :*/FOR CHANGES OF TCO FOR PEOPLE TO SLEEP IN ROOMS AREA A-C 1)ALL RATED DOORS MUST CLOSE PROPERLY 2)SMOKE SEALS AND SWEEPS MUST BE COMPLETED AND PROPERLY ADJUSTED @ STAIR WELLS. 3)REMOVE LARGE RUBBLE FROM EXTERIOR EXIT PATHS. 4)HAVE ALL DIRECTIONALS AN EXIT SIGNS POPPED OUT 5)COMPLETE ALL ROOM SIGNAGE 6)REPAIR STUCCO WHERE CUT OUT FOR OTHER MODIFICATIONS 7)ELEVATORS AND MAG-LOCKS FOR AREA SEPERATION MUST BE UP AND RUNNING 8)PATIO SLIDERS TO HOSPITALITY SUITE DECK MUST BE FIXED SHUT. 9)CAULK ALL FLOOR JOINTS FOR TUBS & TOILETS 10)FOR CASUAL KITCHEN I NEED ELECTRICAL MECH AND FIRE APPROVALS FOR CASUAL KITCHEN | |
| 11/17/2004 | BUILDING - FINAL | Partial Approval | OK TEMP C OF O FOR MARRIOTT STAFF FOLLOWING AREAS: 1) WINGS A, B AND C ALL FLOORS 2) CORRIDOR AND RESTROOMS P1-D 3) EMPLOYEE LOCKER ROOMS AND CAFETERIA WING G 4) BACK OF HOUSE OFFICES WING H 5) BALLROOMS WINGS I AND J 6) P3 PARKING AND ALL CORRIDORS LEVEL P1 FROM PARKING TO HOTEL WINGS A, B AND C |
|
| 06/04/2004 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 04/19/2004 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* DETAIL FOR GUARD PP A8.55 WILL NOT MEET CODE. FRED RECH & STEVE FENNER NOTIFIED. |