Review Status: Completed
Review Details: 3RD PARTY REVIEW-REVISION/OTHER
Permit Number - T03CM02796
Review Name: 3RD PARTY REVIEW-REVISION/OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/06/2003 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | SCOPE OF REVIEW: The scope of this review covers electrical for Wings A, B, and C only. All features were checked only to the extent allowed by the submittal provided. All portions of the project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. The project was reviewed under the City of Tucson's local amendments to UBC Chapter 11. All accessibility requirements must be identified and detailed on the plans according to those rules and guidelines. GENERAL: q The mechanical equipment names on the electrical plans are different than the mechanical equipment names on the mechanical plans. This makes plan check coordination between the mechanical and electrical disciplines much more difficult. q Some plans or partial plans do not show building grid lines. This makes plan check coordination more difficult. q This review does not include review of any kitchen electrical design information. ELECTRICAL: q On Sheet E2.03B, define panel "NACPS" in the legend sheet. Typical for all sheets showing panels labeled as "NACPS". q On Sheet E3.4, why does circuit 4004 not have a ground conductor for service between the utility transformer and SES - 3? How is the utility transformer grounded? q On Sheet E3.4, circuit 224VD is not defined. q On Sheet E3.4, circuit for 30 kVA transformer shown on one line diagram fed from panel BP2HA is not shown on BP2HA panel schedule q On Sheet 3.4, circuit 304 feeding panel BKP1H is not properly protected by the feeder circuit breaker in panel BP1HA. q On Sheet 3.4, confirm AIC ratings of all automatic transfer switches. q On Sheet E3.3, show sheet continuation information for the connections from the automatic transfer switches and the generator. q On Sheet E3.3, the fuse sizes shown for elevators EL-P1, EL-P2 and EL-S1 exceed the maximum fuse size allowed in NEC table 430-152. q On Sheet E3.5, confirm and coordinate the information shown on the fault current calculations and one line diagram. Revise the fault calculations accordingly. Cable size shown for fault points 3 through 9, 35, 41, 42 and 54 do not match cable size shown on the one line diagram on sheet E3.3. Fault point 58 source fault value does not match the fault calculated for point BP2HB. q On Sheet E4.18, panel BP2HA schedule does not show a circuit for the 30kVA transformer shown on the one line diagram on Sheet 3.3. q On Sheet E4.21, revise all panel schedules and load summaries to be consistent with the load calculations shown at the bottom of the sheet. q On Sheet E4.21, panel BP1HA circuit breaker for circuits 38,40,42 does not protect conductor shown on the one line diagram on Sheet E3.3. q On Sheet E4.22, revise all panel schedules and load summaries to be consistent with the load calculations shown at the bottom of the sheet. q On Sheet E4.23, revise all panel schedules and load summaries to be consistent with the load calculations shown at the bottom of the sheet. q On Sheet E4.23, why is panel B3PC schedule shown with feed through lugs? q On Sheet E4.24, AHU-4 load shown on panel B7HA schedule is not correct for the motor horsepower shown on the plans. q On Sheet E4.24, why is panel BP1PB schedule shown with feed through lugs? q On Sheet E4.24, panel BP1PA load summary is not consistent with the load calculations for that panel at the bottom of the sheet. q On Sheet E4.25, revise all panel schedules and load summaries to be consistent with the load calculations shown at the bottom of the sheet. q On Sheet E4.25, voltages for panels BPPHA and BPPHB appear to be incorrect. q On Sheet E4.26, panel BP2LP size and feed through configuration do not match information shown on the one line diagram on sheet E3.3 q On Sheet E4.26, load summaries for panels BP2LP, B2LP and B5LP are not consistent with the configurations shown on the one line diagram on Sheet E3.3. -End of Review- |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/06/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |