Permit: T03CM02796

Parcel: 11628001E

Inspection Status: Approved

Inspection History: MECHANICAL - INTERMEDIATE

Date Description Inspector Results Comments
08/05/2005 MECHANICAL - INTERMEDIATE Approved
02/23/2005 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :* SPEC, KITCHEN DINING AREA PROGRESSING
02/07/2005 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :* SPECIALTY KITCHEN PROGRESSING. NOTE! AIRHANDLER # 8 & 9 THIS IS NOT A HOUSE KEEPING STORAGE ROOM.
01/04/2005 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*PARTIAL
12/20/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
12/01/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/1)H BLDG ROOF TOP. I.D. TAGS ON SWITCHES/BLOWERS, ETC. 2)BLK IRON - NEEDS PAINT 3)NOTE! WANT TO SEE SMOKE DETECTOR/ALARM ACTIVATED
11/24/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/RETURN AIR PLENIUM, OK IF INSUL. IS PLENIUM RATED. HAVE INSUL CO. SUBMIT WRITTEN TYPE USED. BLDG G&H AREA ABOVE HARD LIDS? - GREASE DUCTS, WRAPS, ROOF TOP GREASE DUCTS & BLOWERS
11/17/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
11/16/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/STAIR B (2) ROOF ACCESS - 14" SPIRAL EXH. DUCT ? CH???! STAIR 6, LEVEL 3 P-2 TO TOP
11/10/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/MECHANICAL TEMP. C/O OK FOR CERTAIN AREAS APPROVED BY BUILDING INSP. IN HAVE NO DESIGNATED/NUMBERED AREAS TO APPROVE. THIS WILL BE SUBJECT TO LERAY HANLY
11/08/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/RM M205-COMPLETE SEALING PENETRATION OPENINGS INTO RM. ABOVE GRID, M-206 - FIRE DAMPER - 14"X10" CORRIDOR TO BRIDGE LEVEL P-1
11/02/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
10/29/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/1)DISCUSSED SEALING FIRE DAMPER PEN IN MASONARY WALLS 3RD TIME 2)FIRE DAMPERS IN EXH. DUCTG STAIRWELL OK TO PROCEED IF IN AGREEMENT W/BUILDING INSP. 3)DISCUSSED ENLARGE ? OPENINGS FOR FUTURE REPLACEMENT OF CHILLERS 3RD TIME
10/26/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/CORRIDOR H AREA ABOVE GRID, OPENINGS NOT SEALED IN WALL. DO NOT SET TILES IN CORRIDOR OR ADJOINING RM'S. NOT READY. MIKE KING. PLEASE CALL ME
10/21/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/GP-1 #235A OUTSIDE AIR-HP-1 HOUSE KEEPING AREA-OK TO COVER GRID
10/20/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/CHILD ACTIVITY RM. P111 OK TO FRAME & COVER. BANQUET KIT. PROGRESSING
10/18/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
10/07/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/LEVEL 1-H BLDG 6-1/6-7 VAV. 120 PSI. TEST #24
10/04/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ 1) REVIEWING FIRE DAMPER TOPS END OF ? CORRIDORS INTO 2 HR CHASES
09/29/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
09/24/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/1)BLDG G - CHASE WEST END OF CORRIDOR. HOW IS INTEGRITY OF CHASE BEING RETAINED, FROM TOP OF CHASE OVER TO REMOTE EXH. BLOWER LOCATION?? 2)BLDG H BANQUET KIT. SMOKE TEST, 3-EXHAUST, GREASE DUCTS, HORIZONTAL RUNS OK TO WRAP 3)3RD TIME. OPENINGS OUT OF MECH. ROM. OPENINGS PROVIDED NOT FULL SIZE OPPOSITE CHILLERS - ARE FULL OPENINGS IN HEIGHT GOING TO BE PROVIDED??
09/22/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
09/21/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/1)LEVEL 2 BLDG 3 COMM. RM. AUX. DRAIN PAN? 2)CHILLED WATER PRESS. TEST #33. LEVEL 1. BLDG G VAV-G-8 TO G-20. PLUMB. - CHILLED WATER PIPING 115 PSI. 3)PROGRESS INSP-EQUIP. RIM. BLDG D-C ROOF TOP BOILER, ELEVATOR EQUIP. RMS.
09/20/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/1)P-I OF BLDG D TRANSFER DUCT REST. M.S.? TO CORRIDOR 2)P-I DOUBLE RM ADM. OFF. UNINSU? LUTED? DUCT. 3)PI ELECT. VERTICLE CHASE , GREASE DUCTS & EXHAUST DUCT BOTTOM OF PENETRATIONS NEED TO BE SEALED OFF. 4)P-I C KITCHEN AREA, VAV CONTROL BOX ABOVE GREASE SUMP. 5)STAINLESS GREASE SUMPS. DO THEY NEED TO BE WRAPED? 6)LEVEL 1, C & D CORRIDOR? SUPPLY DUCT
09/15/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/P2-C TYPE CEILING, PLENUIM? MATL.
09/13/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/TEST #32-CHILLED WATER - FAN COILS
#4/#5 LEVEL 7 BLDG. D & E ELEVATOR EQUIP MS? 105 PSI
08/31/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ 1) LEVEL GP-II CHILLED WATER FAN COIL 2) TEST #31 3) FULL SIZE OPENINGS, REMOVE/REPLACE CHILLERS ?? 4) SMOKE TEST BLK IRON EXH. DUCT 5) LAUNDRY EXH. DUCTS
08/27/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ 1) BLDG B AND D. TEST #30 ELEVATOR EQUIP ROOMS. PIPING MAINS TO AIR HANDLERS #3 AND 4 105 PSI 2) AUX. DRAIN PANS UNDER SLAB COILS WITH 2ND DRAIN RUN TO OBVIOUS LOCATION, OR AUX. DRAIN SENSOR
08/25/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/PARTIAL-940-1708 LARRY
TEST #28
BLDG. LEVEL P-2 TO LEVEL #4 CHILLED WATER VERTICLE TO ICE MACHINE 105 PSI
TEST #29 BLDG # D & E
CHILLED WATER ICE MACHINE WERTICLE LEVEL I TO #6
105 PSI
08/19/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/PARTIAL-INSPECTED HOT WATER SUPPLY & RETURN TO SAPS BLDG. G P2 LEVEL. OK TO INSULATE PIPE.
08/13/2004 MECHANICAL - INTERMEDIATE Partial Approval BLDG D- P1 LEVEL CH PENETRATIONS ABOVE REST LID
08/12/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ 1) TEST #26 MAINS BOILER ROOM MEZZANE . J-BLDG TO P2 C BLDG MECHANICAL ROOM. PIPING P-1 LEVEL CORRIDOR 100 PSI
08/11/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/BLDG. G& H VERTICLES CWP TO ICE MACHINES 110 PSI
08/10/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/TEST #25 VERTICLES-P1 TO LEVEL 4-SOUTH SIDE-BLDG. G-120 PSI CHILLED WATER SUPPLY RETURNS
08/09/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ 1) BLDG G LEVEL P-1 TO LEVEL 4 CHILLED WATER PIPING SUPPLY/RETURN 119 PSI. NORH SIDE ONLY. TEST #24
08/06/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ 1) BLDG H SOUTHSIDE LEVEL P-1 TO LEVEL 4 2) CHILLED WATER PIPING 3) 120 PSI + OR -
08/05/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ 1) BLDG H (LEVEL P-1) UP TO LEVEL 4 CHILLS WATER PIPING VERTICALS 6 NORTH SIDE ROOMS.
07/27/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*PARTIAL APPROVAL. PROGRESS INSPECTIONS. (ORIENTATION INSP. FOR JIM M.)
07/26/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ 1) H BLDG, P-1 KITCHEN AREA, BEGINING SUSPENDED 16 GA. DUCT
07/02/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ SUPPLY LINES IN PLENIUM ABOVE BALLROOMS I & J. BLDG 'H' LEVEL P-1 PROGRESSING.
06/29/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ PRESSURE TEST #21 - CHILLER CENTRAL PLANT, BLDG J, I, H, G, A, B, C, D, E, F, CHILLED WTR SUPPLY/RETURN MAINS, CORRIDORS UP TO ROOF. TEST PRESS 100 PSI.
06/22/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ CHILLED WTR INSIDE CHILLER ROOM, 2 CHILLERS AND PIPING TO THE MAINS AND DOWN TO PLATE HT EXCHANGER CUT OFF VALVES - 100 PSI.
06/18/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ TEST 18 - BLDG 'D' AND 'E' - CHILLED WTR VERTICLE MAINS TO A/H VA HORIZONTAL MAINS LEVEL 3 AND REMAINING PIPING LEVEL P-1. TEST 19 - CHILLED WTR RISERS, FAN COILS FROM L-2 TO LEVEL 6 VERTICLES, BLDG 'D' - 118 PSI.
06/10/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ 1) BLDG "H" LOADING DOCK 2) BALLROOM SUSPENDED SUPPLY DUCTS, PROGRESSING
06/09/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ HTG WTR MAINS VERTICLE FROM P-1 TO AIR HANDLER #4. BRANCH PIPING LEVEL 1 TO VAV'S 2-6, 2-7, 2-9, BLDG D AND E. 105 PSI STEEL/COPPER. TEST #16 BLDG E VERTICLES EAST SIDE P-1 TO 5, 100# PSI - WEST SIDE LEVEL 1-5, TEST #17.
05/28/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*
05/24/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ BLDG 'B' LEVEL 1 TO 5 ROOMS 4039, 5039, 6039, 7039, TEST #. - 115 PSI - TEST #15.
05/14/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ PRESS - CHILLED WATER LINES - BLDG 'G' - 105 PSI SUSPENDED LINES - ERU - 1, LEVEL P-1.
05/06/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ test 12 - heating wtr for vav's 2-44, 41, 38, bldg b level 1. test press 120 psi. access to vav's ?TEST 13 - CHILLED WTR VERTICLE - 120 PSI - ROOMS 3042 AND ROOMS ABOVE, LEVELS 1 & 4. TEST 14 - CHILLED WTR E WING LEVEL 1 MAINS AND BRANCHES TO VALVES, HORIZONTAL RUNS. TOTAL PRESS TEST 109 PSI.
05/05/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ TEST #11 BLDG 'B' - CHILLED WTR MAINS, LEVEL 1 ROOMS 4031, 4033, 4035, 4037, AND ROOMS ABOVE OPERATING PRESS - 105 PSI TEST. HORIZONTAL CW AND VERTICAL RISERS BLDG 'B'
05/04/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ 1) TEST #10 ICE MACHINES CHILLED WATER SUPPLY AND RETURN. WING SOUTH KNUCKLE LEVEL P2 TO LEVEL #5. 100 PSI. COPPER
04/26/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ TEST #8 - CHILLED WTR - MAINS BRANCHES - FROM BLDG B TO D - EXCLUDING CHASE. 100 PSI. TEST #9 - HEATING WTR - MAINS AND BRANCHES BLDG 'D' - CHASE TO LEVEL 1. 100 PSI.
04/23/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ NORTH END OF BLDG G. UNDERGRID OUTSIDE AIR INTAKE. PCS REINFORCED. OK
04/22/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection :*/ 1) 'A' BLDG LEVELS P2 TO L4, CHILLED WATER LOOP, VERTICAL PIPING, TO FAN COILS IN ROOMS. 110 PSI GA. PRESSURE #15100-3.17
04/14/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/TEST #6 - BLDG 'C'. CHILLED WTR MAINS HORIZONTAL AND VERTICAL. ICE MACHINE LP FROM P1 TO LEVEL I 105 PSI VERTICLES TO FAN COIL LOCATION 107 PSI.
04/09/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/ BLDG 'B' - LEVEL I. FOLLOW UP FIRE DAMPERS VERTICLE UP THRU FLOORS. CHECK ON SEALING HOLES.
04/08/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/ MAIN LOBBY AREA. UNDERGROUND SUPPLY DUCT AT PERIMETER, FLOOR LEVEL. OK TO COVER PCS STEEL. / ADMIN OFF - BLDG 'B'. HAVE ENGINEERS O CK OWLELDGE OPENINGS, TRANS AIR OUT OF PLENIUM,
04/06/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/ PRESS TEST #5 - BLDG A/B LEVEL 1 - CHILLED WTR HORIZONTAL PIPING SUPPLY/RETURN 3" MAINS. 100 PSI.
04/01/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/ VAV 2-12, 2-16. BLDG 'D' - P1 LEVEL. ACCESS TO ELECT. LOBBY AREA - 22" PCS UND. GRID SUPPLY AIR TO 18" (2) UNDGRD LINEARS PROGRESSING. REVIEWED PLANS IN TRAILER.
03/31/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/ PIPE # 15100-3.17 CWS/R - NOTE: KITCHEN CONTR. REMOTE COMPRESSOR REFRIG LINES?? PRESS TESTS?? ETC. PLEASE ADVISE GEN. CONTR. INSP NECESSARY.
03/29/2004 MECHANICAL - INTERMEDIATE Partial Approval BLDG A, B, CORRIDOR P-1 - 115 PSI - CW MAINS - GREASE DUCT , WITH SUMP FF 4 WANT TO SEE DUCT EXTENSION POST SUMP. JOINT IN WALL.
03/26/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/ HW BLDG 'C' P2. VAV'S POOL BAR 120 PSI.
03/12/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/ CHILLED WTR PRESSURE TEST TO ROOMS WING 'A' P-1 TO L-2 CHILLED WTR 100 PSI.
03/04/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/ BLDG 'B' - CHILLED WTR LP. VERTICLE PRESSURE TEST - SOUTH SIDE.
03/03/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/ CHILLED WATER PIPING, VERTICAL UP 4 FLOORS OK 100 PSI - 2 RISERS OK - SOUTH SIDE, 2 SOUTH WEST NOT HOLDING PRESSURE.
03/02/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*
02/27/2004 MECHANICAL - INTERMEDIATE Partial Approval 1) BLDG C-P1 TO P2, 3" HWP, 4" CWP/SUPPLY/RETURN 100 PSI 2) REVIWERS APP. PLAN AND REVIEWERS FIRE DAMPERS DETAIL SPECS
02/24/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*
02/23/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/ 1) BLDG C 2ND FLOOR B-1 LEVEL. TYPE I EXHAUST HOOD DUCT. LEAK CHECKED, DUMP SUMP HORIZONTAL OVER INTO VERTICAL CHASERS. OK TO WRAP 2) LITT ON FIRE DAMPER
01/20/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/ 1) CHECKED VARIOUS BLDG'S
01/13/2004 MECHANICAL - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/ BLDG C LEVEL P-2. MOCH UP ROOMS - CHILLED WTR PIPING, 100 PSI.