Permit: T03CM02796

Parcel: 11628001E

Inspection Status: Approved

Inspection History: BUILDING - PROGRESS

Date Description Inspector Results Comments
05/23/2005 BUILDING - PROGRESS Approved IVRS - Inspection :*
04/26/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
04/19/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
03/02/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
01/26/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :* OK TO ROCK CEILING OF SPECIALTY KTICHEN WHEN OTHER TRADE INSPECTORS APPPROVE INTERMEDIATES
01/24/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :* C.F.S. @ SPECIAL T-1 KITCHEN OK
01/20/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
01/18/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :* 1) FOR TCO LEVEL PI WEIGHT & MOVEMENT ROOMS A) BLOCK STAIR 16 B) FINISH CARPET AND THRESHOLDS C) LOCKER & RESTROOMS SIGNAGE IN PI CORRIDOR ( JOSH KEENE NOTIFIED ) 2) FOR P2 A) FINALS FROM ELECT, MECH, & PLUMB INSPECTORS B) EXIT SIGNAGE C) i NEED TO CHECK ON EXIT PATH THROUGH STONE ROOM B III 1994 UBC 1003.5 DOES NOT ALLOW EXITS THROUGH STOREROOMS.
01/13/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
01/12/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
01/11/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
01/10/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :* 1) PER 302.5 1994 UBC ALL THAT IS REQUIRED FOR BOILERS IN STORAGE ROOM IS THAT STORAGE ROOM IS 1 ?? SEPARATED . AIR TRANFER OPENINGS IN THIS AREA REQUIRE FIRE DAMPERS. 2) A WHEEL CURB WILL BE REQUIRED ALONG RAMPS WHERE HAND RAILS ARE REQUIRED. IT MAY BE PART OF HAND RAIL. 3) 36" CLEAR WIDTH REQUIRED AT ADA ROUTE TO LAP POOL
01/07/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/BLD PROGRESS 1)PLACE LAV. PANELS IN LOWER LOBBY RESTROOMS 2)FINISH THRESHOLD TO PAVILLION 3)FINISH FIRE PITS, GUARDS AND HAND RAILS OFF PAVILLION 4)FINISH SIDING AROUND WINDOWS (LOBBY EAST) FOR WEATHER PROFFING 5)PROVIDE NEW PLAN FOR 5 ADDITIONAL CHEMICAL PUMPS IN POOL HOUSE
-----------------------------------------------------------------------------------------
FOR PUBLIC TCO A-E: I NEED 1) GUARDS AND HANDRAILS OFF PAVILLION AND STAIR 3
2) DIRECTIONAL ADA SIGNS TO FAMILY POOL AREA AND TO POOL BAR RESTROOMS
3) BARRICADE DONE AT LAP POOL GATES WORKING AT FAMILY POOL
01/06/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/SPECIAL EVENT FRIDAY CONDITIONS GONE OVER WITH MARIOTT, MAYOR'S STATE OF CITY SPEACH REQUIRES PRRKING, CLEAN UP AND CLOSED OFF AREAS TO BE DONE 1)BANQUET KITCHEN READY TO PREP. OK TO LOOK AFTER PIRANHA SYSTEM APPROVAL TOMORROW AM 2)I & J DONE WHEN A)ADA SINGAGE FOR RESTOOMS & PARKING DONE B)OUTDOOR BALLROOM COMPLETE C)ELECTRIC FINAL IN PARKING COMPLETE
01/04/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
01/03/2005 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/1)PAVILLION STAIRS OK TO POUR 2)POOL GATES MUST CLOSE & LATCH A)GATE ON N. SIDE OF FAMILY POOL MAY BE LOCKED SHUT FOR T.C.O. 3)ROCK OK AT OUTDOOR BALLROOM WALLS OK TO LATH
12/30/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :* PROGRESS ON SHAFT WALLS IN STAIR H OK
12/29/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
1) ACCESSIBILITY ISSUES FOR H.C. ROOMS INCLUDE LIST FROM MONDAY AND SIGNAGE: A) INTERNATIONAL SIGN OF ACCESSIBILITY REQUIRED AT EACH ROOM
B) DIRECTIONAL INDICATING ROUTE TO REFUGE AREA AND WAIT HERE FOR RESCUE SIGN AT REFUGE AREA
2) PUBLIC RESTROOMS REQUIRE A MIRROR THAT MEETS ACCESSIBILITY REQUIREMENTS
A) 46" MAX TO BOTTOM OF MIRROR
B) MIRRORS MAY BE TILTED FOR VIEWING RATHER THAN LOWERED IF NECESSARY
12/28/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
12/27/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
1) ACCESSIBLE ROOM INSPECTIONS HOTEL (MAIN BLDG)
A) 18" +/- 3/4" REQUIRE TO CENTER OF W.C.
B) FLUSH HANDLE OF W.C. TO BE ON OPEN SIDE
C) GRAB BARS NOT INSTALLED
D) LAVATORY HEIGHT OVER 34" MAX
E) 29" MINIMUM KNEE CLEARANCE NOT MET AT LAVATORY APRON
F) SHOWER HEAD ABOVE REACH LEVEL (48" MAX FOR FORWARD REACH)
G) TRANSFER SHOWER REQUIRES 36" CLEAR WIDTH
H) ROLL IN SHOWER REQUIRES 60" CLEAR WIDTH
I) NIGHT THRESHOLD TO BE NO MORE THAN 1/4" VERTICAL WITH 1/4"-1/2" AT 45 DEGREE ? TO BE 48" HIGH
-----------------------------------------------------------------------------------------
ROOMS 4057-A, B, C, D, E F, I AND J
5059-A, B, E, F, I AND J
6059-NO ACCESS
6060-6062-B, D, E, H, I AND J
6047/6057-NO ACCESS
7059-NO ACCESS
8059-A, B, C, D, E, F, G, I AND J
8081-D, E, F AND J
8084-A, B, D, E, H, I AND J
7084-B, D, E, H, I AND J
7081-NO ACCESS
7066-7072-ROOM INCOMPLETE
6084-B, D, E, H AND J
6081-C, E, F, G AND J
5084-A, B, D, E, H AND J
5081-NO ACCESS
4081-D, E, F AND J
ALL ROOMS REQUIRE DOORS THAT NEED NO MORE THAN SLB'S FORCE TO OPEN
ALL ROOMS REQUIRE INTERNATIONAL SIGN OF ACCESSIBILITY
12/23/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
1) STAIR 7 DONE
2) BC ELECTRIC ROOMS AND LOBBIES DONE (EXCEPTION IS 3'-6" DOOR AT SERVICE ELEVATOR)
3) P2 GARAGE EXTERIOR LANDINGS. PROPER SIGNAGE FOR ADA SPACES ($500 FINE). DOOR THRESHOLDS IN STAIRS
4) 1-H STAIR HANDRAILS, GUARDRAILS, FLAT WORK AT BUS TURN AROUND FINISH STUCCO AND EXIT SIGNS
5) P2-G FIRE DAMPERS IN STORAGE ROOM; MECH, PLUMB, ELECTRIC INSPECTIONS
6) P2-D FIRE SAFE FLOOR VOIDS AT EDGE OF SLAB
12/22/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
12/21/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
12/20/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
12/17/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
12/16/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
1) G-4 CORRIDOR READY TO ROCK
2) MEETING WITH WALLY, RANDY, DAVE AND STEVE ABOUT HOSPITALITY SUITES
3) DAVE WANTS SIDE HINGED DOOR TO BALCONY. ALSO REDUCE BALCONY SIZE FOR MAXIMUM 49 OCCUPANTS. SLIDER DOOR MAY BE SCREWED SHUT
12/15/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
12/14/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*P. 1) COLD F?RM STEEL WALLS SOUTH OF I OK. 2) CENTER STAIR SOUTHSIDE OF OUTDOOR BALLROOM OK. 3) P2-G STOREROOM B111 AND ELEVATOR LOBBY B110 ARE ??R RATED WALLS. YOU NEED DAMPERS IN AIR TRANSFER OPENINGS AND FIRE STOP AS NECESSARY.
12/13/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
1) LEVEL 1-H OK TO HANG CEILING TILE
2) AREA G LAUNDRY CHUTE OK TO COMPLETE CHASE
3) THERE ARE FLOOR PENETRATIONS IN FRONT OF ELEVATION 5-4 THAT ARE OVERSIZED FOR FIRE DAMPER. THESE MUST BE CORRECTED
4) AREA E ELECTRIC ROOM BY D KNUCKLE HAS A VERTICAL DUCR WITH PENETRATIONS AT FLOORS. YOU MUST FIRESTOP ALL FLOOR PENETRATIONS
5) ROB BELL FROM MARIOTT HAS INDICATED THEY MAY WANT TO HAVE STAFF SLEEPING IN HOTEL. TO DO THIS THE ELEVATORS LOBBIES, MECHANICAL ROOMS, ELECTRIC ROOMS AND EMERGENCY EGRESS LIGHTING MUST BE 100 PERCENT
12/10/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/1)PLEASE REPAIR 1 HOUR WALL ABOVE CLOSET P2-C ROOM 1053 ASAP 2)P2-C REQUIRES 2 HOUR SEPERATION FROM P1-D @ BRIDGE AND ARCH. REPORT. MARC WALKED AREA AND IS FAMILIAR WITH REG. REPAIR 3)P1 & 1 G & 4 WALLS, SOFFITS, HARD LIDS TEC. READY TO COVER 4)G PENTHOUSE @ EAST END REQUIRES FIRE STOP AT EDGE OF SLAB FLOOR VOIDS 5)G&H LEVEL 4 BRIDGE READY TO COVER 6)G&H ALL LEVELS READY TO FIXTURE. FIRE STOP COMPLETE IN ALL GUEST ROOMS 7)OK TO GROUT RAMP WALLS @ PAVILLION
12/09/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
1) AT D-E KNUCKLE FROM LEVEL P2-P1 UP YOU NEED TO ? 2 HR. HORIZONTAL FIRE BARRIERS BETWEEN FLOORS
2) PLEASE DO NOT LAY CEILING TILE IN P2-G/H UNTIL FIRE STOP AND INSPECTIONS OF F.S. ARE COMPLETE
12/08/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
12/07/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
1) 2 G AND H FIRE STOP COMPLETE FOR GUEST ROOMS OK TO FIXTURE
2) G-3 KNUCKLE NOT REAY F.S. CU PIPE AND SPRINKLER PIPE
3) D ? HOUSES NOT READY-COULD NOT INSPECT NORTH, SOUTH REQUIRES FIX AT FLOOR VERT AND AT HORIZONTAL FIRE DAMPER
4) TCO D AND E NOT READY. YOU NEED RATED DOORS ON SHAFTS AT DAMPERS. REMOVE GRILLS BY STAIR 7 SO I CAN DO INSPECTION. FIX SHOWER DRAIN LEAK 5098
5) G-P2 FOUNTAIN BASE OK
12/02/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :ALL OF G-1 READY TO ROCK
G2 CONNECTION OK TO COVER
12/01/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
11/30/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/1)STEEL FOR FOUNTAIN @ STAIR 16 OK 2)KNUCKLES G & H NOT READY
11/29/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) OK FINISH CHASES AT D-6. PLEASE FINISH APPLYING FIRESTOP AROUND DATA CABLES
2) ABOVE CEILING FIRESTOP AT G-1 STILL INCOMPLETE
3) FIRESTOP REQUIRED AT 4" DRAIN WHERE IT PENETRATES FLOOR OF G-1
11/26/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :PART COCHERE FRAMING OK TO COVER
11/24/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/1)P1-D OK TO LAY CEILING TILE IN STORAGE ROOMS 2)P1-H OK TO LAY CEILING TILE IN K221 3)1-G OK TO ROCK WALLS EXCEPT LEAVE PANEL OFF BY 4" DRAIN @ PASS THRU SO I CAN INSPECT FIRESTOP. DO NOT ROCK CEILING UNTIL FIRE STOP @ STAIRS AND ELEVATORS IS COMPLETE AND INSPECTED BY ME. 4)F-ALL LEVELS READY TO ROCK, LATH & STUCCO AS NECESSARY 5)6-D SHAFTS-FRAME IS OK BUT FIRESTOP AT CORE BOARD LAYER MUST BE COMPLETED AND INSPECTION DONE BEFORE COMPLETING SHEETROCK 6)PLEASE KEEP REMINDING PEOPLE NOT TO BLOCK OPEN DOORS. RATED DOORS ARE FOR OCCUPANCY SEPERATIONS AND DO NOT WORK WHEN BLOCKED OPEN.. I KNOW ITS DIFFICULT TO HAVE TO OPEN A DOOR EVERY TIME YOU WALK THRIUGH IT BUT THE T.C.O. REQUIRES FIRE SAFETY TO BE IN PLACE
11/22/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
11/19/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
11/18/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :I-H FIRESTOP AND SHEETROCK PROGRESS OK EXCEPT EAST END OF H ON NORTH SIDE IN SPLIT LEVEL
ALL OTHER STUCCO ETC IS READY TO GO
11/17/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
11/16/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
11/15/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
11/12/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :FOR TCO:
RESTROOMS FOR ADMIN MUST BE UP AND RUNNING
CLEAN OUT STAIRWELLS & EXITING AREAS INCLUDING CORRIDORS (NO MAJOR CONST. EQUIP, NO BLOCKING AISLES)
LIMIT ACCESS - SIGNAGE AND bARRICADES AS NEEDED
FINISH HANDRAILS @ STAIR FROM PARKING LOT
11/09/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
11/09/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) YOU MUST FINISH 1 HR SEPERATION ABOVE CEILING LEVEL P2-C LAST ROOM ON WEST BY STAIRWELL
2) FIRESTOP AREAS I AND J ABOVE POCKET CEILING IS OK
11/08/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) PROGRESS ON MARBLE PARTITION CEILINGS OK
2) PLEASE PROVIDE AT LIFT SO I CAN SET UP TO CEILING
11/05/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :* TIE GRID WIRES PROPERLY FOR ACCOUSTIC CEILING. GUARDRAILS @ STAIRS ARE OK PER 1994 UBC SECTION 509 HEIGHT OF OPENINGS. DESIGN OF RAILS OK AS IS.
11/03/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/1)4-H FIRE STOP OK. OK TO COMPLETE ROCK & TAPE WHEN 2MINOR CORRECTIONS MADE & ISAI?? CONFIRMS 2)PI-J CORRIDOR @ MECH & DISHWASHING OK 3)P1-H - CEILING GRID REQUIRES SUFF??T WIRES TO HAVE 3 TIGHT TURNS IN 3"
11/02/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) NOTE: YOU DO NOT HAVE A T.C.O.. YOU SHOULD NOT BE STOCKING COMBUSTIBLES IN ANY AREA WHERE SPRINKLERS ARE NOT UP AND RUNNING. THIS MEANS MARRIOTT SHOULD NOT BE STOCKING BEDS, WOOD FURNITURE, BOXES, ETC...
2) SHAFTS AT STAIR 1 AND 2 OK TO CLOSE
3) COMPLETE 2 LAYER ROCK UNDER SHAFT AT STAIR 2/P2
4) MAKE SURE FIRE DAMPERS INSTALLED PER RUSKIN LISTING E.G. THERE ARE LIMITS TO LENGTH OF SLEEVE
5) P2-H OK FIRE STOP ABOVE CEILING
6) OK TO SET TILE
11/01/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/1)PLEASE REMOVE CEILING TILES AS NEEDED FOR FIRE STOP INSPECTION ALONG MECH ROOM WALLS IN "J"
10/27/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) OK TO FINISH SHAFT WALLS BLDG ? ELECTRIC ROOM LEVEL 1-TOP 2) RAISE CHASE AT P1-A TO OVERHEAD-THE SAME AS DID IN P2-B FOR EGRESS CLEARANCE 3) G-STAIR 18 READY TO ROCK, I STILL NEED TO SEE 2 LAYERS 5/8 LEVEL P1 AND LEVEL 4 ON SUITE SIDE 4) STAIR ? READY TO ROCK MAKE REPAIR ABOVE CEILING LEVEL P1
10/26/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) OK TO SET CEILING TILES BACK OF I 2) P2 B, P1 A STAIRWELL NOT READY
10/25/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) BACK OF J OK TO SET CEILING TILE. BACK OF I NOT READY. I NEED TO SEE LISTED 2 HOUR DOOR ASSEMBLY FOR PARTITION STORAGE AT BALOONS OR FIRE STOP AT STEEL BEAMS IN CEILING 2) F-1 REPAIR MONOKOTE AT BEAMS BEFORE COVERING 3) ?-4 NORTH SIDE NOT READY
10/22/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/1)LEVEL 3-H READY TO ROCK 2)LEVEL 4-H SOUTH SIDE OK TO ROCK 3)OK TO DROP CEILING TILE P1-H SECURITY ON NON-RATED LAUNDRY ROOMS
10/21/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
10/20/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/AT DISCONTINUOUS GYR?BOARD CHASE IN BUILDING D U.C. ASSEMBLY HNLJ.U-19 WILL BE USED ALONG WITH THROUGH PENETRATION FIRESTOP XHEZ.W-L-7044. THIS IS TO ALLOW OFFSET ROOF VENT TO BE DUCTED TO 2 HOUR CHASE. U.L. ASSENBLY IS 2 HR RATED
10/19/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) FIRESTOP 4-G FIX ROOMS 1, 2, 4 AND 18. FIRESTOP 2-H FIX 1 PIPE SOUTH RIDE 2) RECEIVED PAPERWORK FOR FIRE MASTER WRAP TO CREATE 2 HOUR SHAFT EXTENSION FOR 6-D
10/15/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :OK TO SET FAN COILS N SIDE H-4
OK TO ROCK STAIR @ B EXCEPT BOTTOM FLOOR
10/14/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/1)STAIR WELL WEST END OF A OK TO ROCK EXCEPT LEVEL P1 WHICH REQUIRES 2 LAYERS 5/8" BYP BOARD SHAFT 2)STAIR WELL WEST END OF B OK TO ROCK EXCEPT LEVEL P2-SEE NOTE 1 ABOVE 3)STAIR WELL N END OF E NOT READY. SHAFT WALL BETWEEN STAIR AND CORRIDOR NOT PROPERLY CONSTRUCTED 4)STAIR WELL SOUTH END OF C NOT READY. LEVEL P2 HAS HAD 1HR SEPERATIOHN TO CORRIDOR SERVIOUSLY BREACHED ABOVE CEILING BETWEEN GUEST SUITE & CORRIDOR. THERE IS ALSO NO PROTECTION ON LEVEL 1 BETWEEN GUEST SUITE AND STAIR WELL - 2 HR. SEPERATION REQUIRED
10/13/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*1)G LEVEL 4 FIRE STOP INSPECTION FAILED A)HOLES IN MEMBRANES B)FAILED JOINT SYSTEMS @ ROOF DRAINS C)DOMESTIC WATER SUPPLY NOT READY @ STAIR WELL (2 HR WALL) NOR SEVERAL OTHER PLACES 2)4 LEVEL 2 FIRESTIP INSPECTION FAILED A)1ST ROOMI WALKED IN WAS NOT DONE @ 2" DVV PENETRATIONS 3)MET WITH JEREMY, PAUL AND ISAIH FROM WETZ AND PLACED CONFERENCE CALL TO ENGINEER @ RUSKIN ABOUT THERE DAMPER INSTALLATIONS @ STAIR SHAFTS. ATTACHED COPY OF APPROVED SYSTEM-OK TO PUT MOUNTING ANGLE ON EITHER SIDE OF SHAFT WALL
10/12/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) 4-H NOT READY-REMOVE FAN COILS ON NORTH SIDE FOR FIRESTOP INSPECTION 2) STAIRWELLS ON A, B, C, E OK TO ROCK 3 EXTERIOR. WALLS DO NOT ROCK CORRIDOR WALL. DO NOT CLOSE VENTILATION SHELF TS. REMOVE ROCK AS NECESSARY SO I MAY INSPECT INSIDE OF SHAFT
10/11/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :RESPONS BY ADAMS ENGINEERING INDICATING ITS OK TO INSTAL A FIRE DAMPER @ THE TOP OF THE VENTILATION CHASES ON LEVEL 6-D HAS BBEEN REJECTED BY THE BUILDING OFFICIAL
SPECIFICALLY FIRE RATED ASSEMBLIES MUST MUST STOP PASSAGE OF HOT FLAME AND GASSES PURSUANT TO UBC STANDARD 7-1 AND YOU HAVE USED EXCEPTION 1 FROM 1994 UBC WHICH IS ONLY APPLICABLE WHEN THE "AIR FLOW IS UPWARD". WHEN DAMPER AT TOP CLOSES DUE TO FIRE THE AIRFLOW IS NO LONGER CONTINOUSLY UPWARD
G-H/234 EDGE AT SLAB FIRE STOP OK AT CROSSOVERS
4/H SOUTH SIDE FAN COILS OK TO PLACE
4-5/E YOU NEED EDGE OF SLAB FIRE PROTECTION BETWEEN 4 AND PENTHOUSE
10/08/2004 BUILDING - PROGRESS Denied IVRS - Inspection :STAIR WEST END OF A #1, WEST END B #2 SOUTH END C #6 ARE NOT READY
CORIDOR SIDE OF STAIRWELLS AND SHAFT ENCLOSURES HAS NOT BEEN PROPERLY FIRE STOPPPED
REMEMBER STAIR IS A 2 HOUR ENCLOSURE SHAFTS @ STAIR 6 WERE NEVER INSPECTED AND THE ONES I CAN SEE ARE NOT PROPERLY BUILT
10/06/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/GET IN WRITING THE PROPOSAL TO REPAIR SHAFT @ D-6 (FINE DAMPER INSTEAD AT CONTINIOUS SHAFT) AND I WILL ASK BUILDING OFFICIAL IF ITS OK.
10/05/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) 3-G READY TO ROCK GUEST ROOMS 2) P1-J E210 CEILING OK TO PLACE 3) AREA D OK TO CLOSE SHAFT AT WEST END
10/04/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
10/01/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*PARTIAL APPROVAL. BLDG. G LEVEL 2 NOT READY.
09/30/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) OK TO CLOSE LAUNDRY CHUTES IN D 2) OK TO CLOSE SHAFTS G/2 & 3 3) MAKE REPAIRS AS INDICATED DURING WALK THRU 4) AS DUCTS AT STAIR WELLS ARE CURRENTLY INSTALLED THEY DO NOT MEET REQUIREMENTS SET FOURTH IN FIRE DAMPER INSTALLATION SHEETS FROM RUSKIN
09/28/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/AREA G LEVEL 3 & 4 NORTH SIDE FAN COILS OK TO SET.
09/27/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/01035-CFS FRAMING P2/G IS COMPLETE. PLEASE DO NOT COVER LID IN HALL UNTIL THE ISSUE OF WHETHER OR NOT THIS IS A RATED CORRIDOR IS RESOLVED.
01033- DECK NAILING AREA F OK
09/24/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
09/23/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) G 2, 3 AND 4 SOUTHSIDE FAN COILS
09/22/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
09/21/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) P-1 3/ E AND D FIRE SAFING IN GUEST SUITES OK EXCEPT FOR KNUCKLES. MARK-FIRE SAFING WAS NOT DONE IN CORRIDOR BETWEEN I AND H ABOVE CEILING
09/15/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
09/14/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/1)1-E FIRE STOP IN GUEST ROOMS OK
2)2-D ABOVE CIELING OK BUT EXAUST DUCTS MUST GO UP INTO SHAFT NOT DOWN. REPAIR AS NEEDED.
09/13/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/1)2/G&H NORTH SIDE OK TO PLACE FAN COILS 2)P1/E; 4/A,B,C; S/B FIRESTOP IN GUEST ROOMS COMPLETE
09/10/2004 BUILDING - PROGRESS Partial Approval 01005-1P2-G STAIR 16 FOOTING OK
09/09/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*1) I BELIEVE THAT THE 2 HOUR SHAFTS FOR EXHAUST FANS @ LEVE D-6 NEEDS TO CONTINUE TO ROOF OPENINGS, CURRENTLY A DUCT COMES OUT OF SHAFT @ 6TH FLOOR AND TRANSVERSES CIELING OVER TO ROOF OPENING
09/08/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/1)D-6 VENTS OK IN SHAFT
2)D/3-5 VENTS @ KNUCKLES NEED TO EXTEND UP, PLEASE REPAIR AS PER RFI FOR LEVEL 6
3)PROVIDE INFORMATION FROM MANUFACTURER FOR HOW TO RATE FLOURESCENT FIXTURES 2 HOURS, OR HOW THEY MAY BE ENCLOSED FOR 2 HOURS RATING. AREA P-1-H/I
09/07/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/1)LEVEL 3/A,B,C FIRE STEP IN GUEST ROOMS COMPLETE
2aa)LEVEL 2/B,C GUEST ROOMS COMPLETE
3)2-A HAS HOLE IN FLOOR @ HOSP. SUITE
4)S-D KNUCKLES OK ABOVE CEILING
09/02/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :4-D FIRESTOP @ KNUCKLES OK
09/01/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :4-D KNUCKLE FIRESTOP DENIED*
08/31/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) LEVEL 1 AREA A,B,C GUEST SUITE FIRE STOP AND SHEET ROCK COMPLETE 2) LEVEL 3 AREA D KNUCKLES; BOTH LAYERS OF ROCK AT SHAFTS (INTERIOR AND EXTERIOR) REQUIRE FIRESTOP
08/30/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/NOT READY
TOWCM05318-STAIR 33 NOT READY
08/26/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :OK TO SET W.C'S ON LEVEL 1 A,B,C
08/25/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) P2/B & C FIRESTOP IN GUESTROOMS COMPLETE 2) P1/A & B FIRESTOP IN GUESTROOMS COMPLETE
08/24/2004 BUILDING - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*/DENIED-1)G-D FIRESTOP
A)CAULK AROUND GAS PIPES B) DUCT PENETRATIONS INT SHAFT MUST EXTEND VERTICALLY UPWARD 22"
2) PZ-PI/ABC FIND A WAY FOR ME TO SEE BEHIND ESCUCHEAN PLATES @ WATER CLOSET.
01035-DECKS STAIR > OK TO ROOF.
08/18/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) P2-P1-ABC FIRESTOP DENIED INSTALL PER UL LISTED SYSTEMS
08/17/2004 BUILDING - PROGRESS Not ready for Inspection IVRS - Inspection :*/NOT READY-AREA'S REQUIRING INP. NOT SPECIFIED
08/16/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
08/13/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
08/12/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) ROOM 7063 PENETRATIONS AT CEILING FOR LAV NEEDS 2 HR PENETRATION 2) S-D MIDDLE ROOMS OK TO ROCK
08/10/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/1)FIRE STEP ABOVE CIELING OK 17 CENTRAL AREAS. KNUCKLES NOT READY. YOU MAY NOT USE FLEX-DUCTING (EXHAUST DUCT) INSIDE FIRE RATED WALLS @ LUXURY SUITES. DO NOT COBER THESE AREAS UNTIL RE-INSPECTION. ALSO BE AWARE OF INHERENT DIFFICULTY OF FIRE STOP AROUND BALANCING VALVES.
08/09/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
08/09/2004 BUILDING - PROGRESS Denied DENIED-(1) AREA D INSTALL FIRE STOP PER STI CUT SHEETS. (2) AREA E FLOOR VOIDS MISSED BETWEEN 3-4-5 IN SUITES BY CONNECTION TO D ON WEST SIDE (7081, 6081, 5081).
08/06/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) D/4 & 5 FIRESTOP NOT INSTALLED PER SUBMITTED UL SYSTEM. PLEASE DO NOT ALTER YOUR SUBMITTED FIRE STOP SYSTEMS. THE CITY OF TUCSON HAS ALREADY ACCEPTED 6 DIFFERENT SYSTEMS FOR FLOOR AND WALL PROTECTION. IF THESE SYSTEMS ARE INSTLALED CORRECTLY YOU WILL PASS INSPECTION. MODIFYING, ALTERING OR REPLACING SUBMITTED SYSTEMS REQUIRES PRIOR APPROVAL BY THE BLDG INSPECTOR
08/05/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
08/04/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :FIRESTOP AREA D NOT READY PLEASE REFER TO SPEC-SEAL WC 4008 NOTE 1A
HANDRAILS IN STAIRWELLS MAY BE USED AS GUARDS PER 1994 UBC 509.2.3. PLEASE NOTE THAT THIS DOES NOT APPLY TO LANDINGS
I WILL CONFER WITH THE BUILDING OFFICIAL AS TO WHETHER THE TUCSON CITY CODE AMENDMENT 509-3.3 APPLYS TO STAIR RAIL APPLICATIONS LOOKING AT DEFINITION OF HORIZONTAL I BELIEVE YOU ARE OK
VIGAS IN LOBBY ARE PART OF INTERIOR ENVIRONMENT NOT PART OF STRUCTURE SO THERE FORE THEY NEED TO MEET FLAME/SMOKE SPREAD REQUIREMENTS ONLY
08/02/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :3-D PROVIDE LISTED SYSTEM FOR SPEC-SEAL PILLOWS IN RATED WALLS. YOU MUST USE SYSTEMS SUPPLIED FOR APPROVAL AND YOU MUST INSTALL ACCORDINGLY. IF YOU DO NOT USE HILTI CAULK AROUND A SPEC-SEAL LILLOW- ETC.
07/30/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) NEED TO APPLY FIRESTOP AT LAV PENETRATIONS. CUT OUT TAPE AND MUST THAT IS CURRENTLY AT THOSE LOCATIONS
07/29/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) OK TO SET FAN COILS D-4 AND D-5 AFTER MAKING MINOR NOTED REPAIRS 2) D-6 OK TO SET FAN COILS ON SOUTH SIDE EXCEPT AT KNUCKLES
07/28/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) BALLROOM LEVEL I, J SHEETROCK PROGRESS OK
07/27/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :3-E OK TO ROCK
4-E OK TO ROCK
5-E OK TO ROCK
3-D OK TO SET FAN COILS
07/26/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :E/3&4 FIRESTEP MISSING BETWEEN FLOORS ROOM 5105
PLUMBERS HAVE DAMAGED ROCK BEHIND TUBS IN 4 ROOMS
THERE ARE STILL PLUMBING REPAIRS GOING ON AT BOTH LEVELS
ROCK INCOMPLETE BEHIND FAN COIL ROOMS 5104/5105
YOU MUST BE 100% READY TO COVER WALLS & CEILINGS WHEN I COME FOR INSPECTION
D-3 BEHIND FAN COILS DENIED
FLOOR PENETRATIONS ROOM 5061 & HOLE IN ROCK
JOINT SYSTEM FOR SEVERAL ROOMS ALONG WESTSIDE INCORRECTLY APPLIED
07/22/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :AREA E "SKIN" ROCK OK TO COMPLETE LATH
07/21/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
07/20/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection YOU MUST USE APPROVED JOINT SYSTEM WHERE ROCK ABUTS EXTERIOR WALL
A GAP SIZE MORE THAN 1/8" REQUIRES A FIRE STRAP SYSTEM
THE APPROVED SYSTEM FOR SDI IS TO FILL VOID WITH SHEETROCK ACCOUSTICAL SEALANT THIS IS APPROVED FOR TOP OF WALL BOTTOM OF WALL AND END OF WALL JOINTS ONLY
07/15/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*FIRE RESISTIVE CONSTRUCTION NOT NEEDED AT MECHANICAL PENTHOUSES PER "94" UBC SECTION 1511.4 EXCEPTION 3.
07/14/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*OK TO SET FAN COILS.
07/13/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
07/09/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*S-E FS BEHIND A/CCOILS NOT READY.
07/07/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :* YOU ARE LATHING LEVEL 8D W/OUT HAVING SHOWN HOW YOU ARE GOING TO MAKE COLUMNS INSIDE WALL. MEET UBC TABLE 6H RQMTS.
07/06/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
07/02/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) P1-E FIRE STOP OK EXCEPT AT INSULATED PIPES
06/30/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
06/29/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
06/25/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) LEVEL 5 WING B FIRE CAULKING
06/23/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) LEVEL 4 A, B AND C FIRE CAULKING OK
06/17/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
06/16/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
06/15/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) THE CITY OF TUCSON CAN NOT BE USED AS YOUR QUALITY CONTROL. FOR FIRE STOP INSPECTIONS ON RATED WALLS YOU NEEED TO BE 100 PERCENT COMPLETE IN ANY GIVEN AREA 2) PLEASE PROVIDE NEW COPIES LISTED ASSEMBLIES FOR ANY/ALL TYPES OF PENETRATIONS OF FIRE RATED WALLS. I HAVE MISPLACED ORIGINAL COPIES. I ALSO NEED A COPY OF LISTED ASSEMBLY FOR EDGE OF SLAB FLOOR VOID ASSEMBLY AND SHAFT WALL ASSEMBLY
06/14/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
06/09/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) 3/A,8-REPAIR/INSTALL FIRE CAULK AS NOTED WITH ISAIAH
06/08/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
06/07/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :* 1) AREA A& B EXTERIOR ROCK OK. 2) AREAD INSIDE PARAPETS ROCK OK. 3) 2-A,B,C FIRE STOP OK - OKTO ROCK ALL GUEST SUITES. 4) P1& 1/A,B,C FIRE STOP REQUIRED IN BATH PENETRATION @ LAVATORIES
06/04/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
06/03/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :* LEVEL 2 A-B-C FIRE STOP OK. EXCEPT 1 HR DEMISING WALL @ FAN COIL UNITS NOT EXTEND TO EXTERIOR OF EXTERIOR WALL. CURRENTLY THERE IS A 3" X 6" HOLE @ TOP TRACK
06/02/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
05/28/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ LEVEL 2 AREA A,B AND C 1) DWV PENETRATIONS INTO SIDE AT SHAFT GENERALLY NOT DONE 2) PROVIDE UL SYSTEM FOR FLOOR PENETRATIONS AT A/C UNITS 3) MOST A/C UNIT AREAS ARE LACKING PROPER FIRE STOP AT TOP OF WALLS, AT MC CABLE PENETRATIONS AND AT FLOOR PENETRATIONS 4) MECH VENT OPENINGS INTO SHAFT MUST BE FIRE STOPPED IF ANNULAR SPACE EXCEEDS 1/8" TO ROCK 5) HOW WILL YOU PROVIDE 1 HR SEPERATION AT 6' DWV PIPE BETWEEN 4003 AND 4005 ? 6) 2 HR. SEPERATION REQUIRED BETWEEN 4006 AND STAIR WELL 7) AT TUB WATER SUPPLY ROOM 4020 THE ANNULAR SPACE AROUND PENETRATIONS HAS NOT BEEN FILLED 8) HAVE YOUR FIRE STOP PEOPLE REVIEW THE UL SYSTEM CUT SHEETS
05/27/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
05/26/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*2/A-C FIRE STOP FAILED INSPECTION 1ST ROOM I WENT IN (4013) DID NOT HAVE FIRESTOP PROPERLY APPLIED AT DRAIN PENETRATION. PLEASE HAVE YOUR SUBS REVIEW THE INSTALLATION SYSTEMS THEY PROVIDED AND INSTALL FIRE STOP MATERIAL ACCORDINGLY 2) TIGHTEN DRYWALL JOINTS AT EXTINGUISHER RECESSES
05/20/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) 2-A, B, C ABOVE CEILING FIRE STOP PROGRESS. PLEASE MAEK REPAIRS AS NOTED DURING WALK THRU WITH PAUL OF WEITZ
05/18/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
05/17/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) P1-C FLLOR VOIDS AT CASUAL KITCHEN "SHAFT" OK 2) THE FLOOR PENETRATIONS AT THE COOLING/HEAT UNITS MUST BE FIRE STOPPED. NON AT LEVEL 1 DOWN TO P1 ARE COMPLETE. NONE ABOVE LEVEL 1 ARE COMPLETE 3) J-GROUND BALLROOM A) FIRE CAULK IS TOB E APPLIED FROM OUTSIDE OF 2ND SHEET OF ROCK B) DO NOT TAPE AT OR AROUND ANY PENETRAITONS UNTIL FIRE STOP INSPECTION IS COMPLETE C) DO NOT OVERSIZE CUT OUTS FOR CONDUIT THE ANNULAR SPACE LEFT OPEN MUST BE MAXIMUM 1 1/4 > 2" DEPENDING ON CAULK 4) SPEC SEAL LCI MAX 2" ANNULAR OTHER PRODUCTS VARY 5) SEAL EDGE OF WALLS AT POSTS
05/13/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) FIRE STOP AT FLOOR VOIDS WINGS A/B IS PROGRESSING OK BUT VOIDS/PENETRATIONS AT MECHANICAL UNITS (CHILLER PIPES) MUST BE PROPERLY FIRE STOPPED
05/06/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) GENERAL REVIEW AREAS G-J. MET WITH SDI AND F. RODGERS ABOUT AREA OPPERATION REQ. AT BALL ROOM. ALL PROGRESS OK
05/03/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) LEVEL 1/A-C FIRE STOP OK EXCEPT AT ELEV., MECH AND STAIRS 2) OK TO ROCK GUEST SUITES
04/20/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection 0000* 1) P2-8 FIRE STOP REQUIRED @ LAVS & WATER CLOSET SUPPLIES. 2) P2-D NEED FIRE STOP AT MECH ROOMS & ELEVATORS. 3) P2-C FIRE STOP PLBG SUPPLY @ LAVS & TOILETS IN GUEST ROOMS.
04/19/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection 0000* 1-C AND 2-C PERIMETER FIRE STOP OK AT FLOOR VOIDS.
04/16/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection 0000* 1) P1-A,B ABOVE CEILINGS FIRE STOP OK 2)P1-A,B,C OK TO ROCK WALLS. b) P1 A-B OK TO ROCK CEILINGS. c) P1-C FIRE STOP STILL NEEDS TO BE CHECKED ALL WALLS. 3) FIRESTOP FLOOR PENETRATIONS @ W.C. & SHOWER.
04/15/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection 0000* P1-I, J PROGRESS ON AREA SEPARATION (RATED FIRE BARRIERS) SHEET ROCK OK. A FIRE STOP SYSTEM IS NECCESSARY WHERE SHEET ROCK ABUTS STEEL BEAMS.
04/05/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection 0000*
03/29/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection 0000* P2-B & P2-C ABOVE CEILING OK.
03/25/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection 0000* WALKTHRU WITH PAUL OF WEITZ & SEVERAL OTHER TRADESMEN TO GO OVER REQUIREMENTS OF FIRE STOP APPLICATION.
03/24/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection 0000* FIRESTOP P2 B & C N/R
03/23/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection 0000* 1) OK TO START STUCCO MESH EAST & SOUTH OF AREA C. 2) DO NOT HANG ANYMORE INTERIOR ROCK. FIRE STOPPING ABOVE CEILING IS MISSING AND/OR INCORRECTLY PLACED IN SEVERAL AREAS. I NEED TO REINSPECT ALL ABOVE CEILING FIRESTOP BEFORE YOU HANG THE REST OF THE SHEET ROCK.
02/24/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection 0000* FIRE STOP OF HALL WALLS IN FRONT OF MOCK UPS OK. OK TO COVER LID FRONT OF MOCK UPS ONLY. 2) FLOOR/CEILING PENETRATIONS THAT REQUIRE ADDITIONAL FIRE STOP WILL BE DONE AS FLOOR INSP AS WE MOVE UP.
02/12/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection 0000* MOCK UP'S OK TO TAPE
02/11/2004 BUILDING - PROGRESS Partial Approval IVRS - Inspection 0000* DO NOT ROCK LIDS IN MOCK UPS UNTIL FIRE STOP HAS BEEN APPROVED. MOCK UP ROOMS ARE NOT OK. HAVE YOUR SUBS REVIEW FIRE STOP SUBMITTALS AND CAULK PENETRATIONS ACCORDINGLY