Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2005 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 12/27/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :*/1)GAS PRESSURE TEST IS OK 2)THIS INSPECTIN IS FOR GAS LINES FOR PATIO HTRS ONLY. | |
| 12/22/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :*/GAS PRESSURE TEST IS OK FOR 3/4" CSST SUPPLYS FOR KIVAS IN LOBBY TERRACE | |
| 11/05/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :*/1)GAS PRESSURE TEST IS OK 2)NOTE: THIS INSPECTION IS FOR 1 1/2" GAS SERVICE FROM METER TO STUBB UP @ POOL EQUIPMENT RM 3)SHALL SEE FINAL CONNECTIONS TO EQUIPMENT & FINAL CONNECTION TO REGULATOR 4)OK TO BACK FILL TRENCH | |
| 10/18/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :*/ 1) VENTS FOR REGULATION FOR BLDG C AND E 7TH FLOOR MECH ROOM BOTH SIDES AND FIRE PLACE REGULATOR AS WELL 2) NOTE: GAS CLEARNCE CARD HAS BEEN ISSUED FOR THIS SYTEM ONLY 3) CLOSET FLANGES IN BLDG E LEVEL 5 ARE OK | |
| 10/14/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 10/12/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
| 10/12/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 10/11/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :*/ 1) SOIL WATER TEST FOR BRIDGE DECK DRAINS ON BOTH SIDES ARE OK 2) HOT WATER RETRUN LINES 140 DEGREE AND 165 DEGREE IN BLDG J MEZZENINE LEVEL IS OK | |
| 10/07/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | / 1) BLDG E LEVEL 2 AND 3 CLOSET FLANGES ALL OK 2) GAS PRESSURE TEST FOR BLDG C AND D FIREPLACE GAS LINES AND FOR GAS SYSTEM IN MECH ROOM LEVEL 7TH BOTH ROOMS | |
| 10/01/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :*/ 1) LEVEL 5 BLDG B CLOSET FLANGES, OK 2) 60 PSI AIR TEST ON 1 1/4 FROM PIZZA OVEN BACK TO ANSUL VALVE, OK 3) 60 PSI AIR TEST ON 3" HEADER WITH (2) 1 1/4" DROPS, (1) 3/4" DROP 4) (1) 1/2" DROP FOR SPECIALTY KITCHEN PER RED LINE DRAWING ON SHEET P5.04 MY INITIALED | |
| 08/25/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
| 06/22/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :*/ 1) SOIL WTR TEST FOR OVERHEAD VENT SYSTEM FOR BLDG 'D' LEVEL P-1 BETWEEN GRID 22.3 TO 22.6 AS NOTED ON PLAN. 2) GAS PRESSURE TEST IS OK FOR 2" MED PRESSURE GAS SYSTEM BLDG I AND J BETWEEN GRID OO AND UU AND BETWEEN COLUMN 24.1 AND 25 AS NOTED ON PLAN. | |
| 05/10/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 04/22/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 04/16/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection 0999* | |
| 04/14/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection 0000* |