Permit: TC-COM-0925-01634
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
10015 E OLD VAIL RD
Address NEW:
10015 E OLD VAIL RD
Apply Date:
09/05/2025
Applicant:
Jay Quitmeyer
Description:
Rev 1 - Update to electrical started 07.07.2026 New Build to Suite of a Sprouts Farmers Market.
Permit Reviews
Permit Number - TC-COM-0925-01634
Permit Status: Issued
Permit Description: Rev 1 - Update to electrical started 07.07.2026
New Build to Suite of a Sprouts Farmers Market.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/24/2025 | COMMERCIAL REVIEW - FULL v.4 | 11/25/2025 | REQUIRES RESUBMIT |
| 03/17/2026 | SPECIAL INSPECTION REVIEW v.1 | 03/18/2026 | REQUIRES RESUBMIT |
| 12/01/2025 | COMMERCIAL REVIEW - FULL v.5 | 12/08/2025 | APPROVED |
| 12/22/2025 | ADMINISTRATIVE v.2 | 12/22/2025 | REQUIRES RESUBMIT |
| 03/24/2026 | SPECIAL INSPECTION REVIEW v.2 | 03/25/2026 | APPROVED |
| 01/13/2026 | ADMINISTRATIVE v.4 | 01/13/2026 | APPROVED |
| 07/07/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 07/14/2026 | APPROVED |
| 09/05/2025 | COMMERCIAL REVIEW - FULL v.1 | 10/08/2025 | REQUIRES RESUBMIT |
| 07/29/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 08/05/2026 | APPROVED |
| 12/09/2025 | ADMINISTRATIVE v.1 | 12/09/2025 | REQUIRES RESUBMIT |
| 08/05/2026 | RESTAMP - COMMERCIAL v.1 | N/A | APPROVED |
| 01/07/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/13/2026 | APPROVED |
| 10/21/2025 | COMMERCIAL REVIEW - FULL v.2 | 11/06/2025 | REQUIRES RESUBMIT |
| 12/16/2025 | RESTAMP - COMMERCIAL v.1 | 12/22/2025 | APPROVED |
| 11/14/2025 | COMMERCIAL REVIEW - FULL v.3 | 11/14/2025 | REQUIRES RESUBMIT |
| 01/07/2026 | ADMINISTRATIVE v.3 | 01/07/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0925-01634
Permit Status: Issued
Permit Description: Rev 1 - Update to electrical started 07.07.2026
New Build to Suite of a Sprouts Farmers Market.
Total Outstanding Activity Conditions - 16
| Date | Name |
|---|---|
| 12/02/2025 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 12/02/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 12/02/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
| 12/02/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 12/02/2025 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 12/02/2025 | Masonry Inspection Report submittal review is required. |
| 12/02/2025 | Post-Installed Anchor Inspection Report is required. |
| 12/02/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
| 12/02/2025 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
| 12/02/2025 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
| 12/05/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 12/05/2025 | Masonry Inspection Report submittal review is required. |
| 12/05/2025 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
| 12/05/2025 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
| 12/17/2025 | AIR BALANCING REPORT IS REQUIRED. |
| 12/17/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0925-01634
Permit Status: Issued
Permit Description: Rev 1 - Update to electrical started 07.07.2026
New Build to Suite of a Sprouts Farmers Market.
| Date | Description | Comments |
|---|---|---|
| 12/09/2025 | Approved Set of Construction Plans was corrupted during download from Studio Session. Address must be assigned to the Permit Application and Plans prior to issuance. Please submit approved plans without City stamps including address. Along with a comment review letter, stating that this is a re-stamp to resolve the addressing issue. | |
| 09/05/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 09/05/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/05/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 12/05/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0925-01634
Permite Description: Rev 1 - Update to electrical started 07.07.2026
New Build to Suite of a Sprouts Farmers Market.
Total Outstanding Inspections - 17
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2026 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | 3/19/26: 3rd lift approved at east and west walls, 2nd lift approved at north and south walls |
| 04/22/2026 | COT - HCPL - Sewer | N/A | Partial Pass | 4-22-26: grease interceptor verified under test and per civil plans- P.400 Detail 5. Okay to backfill progress areas using shading materials. |
| 02/20/2026 | COT - HCBU - Preslab | N/A | Partial Pass | 2/20/26: EXCAVATION/REBAR PER APPROVED PLANS AT EXTERIOR CMU wall footing GL 1-4/ A-D |
| 05/28/2026 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 5-28-26: verified walker duct located at sales floor per plans. Okay to continue with construction at progress areas. |
| 06/05/2026 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Not Ready | 6-5-26: scheduled for 6-8-26. |
| 06/04/2026 | COT - HCPL - Rough Soil | N/A | Partial Pass | 6/4/26: plumbing intermediate for PVC (DWV) and Copper (Domestic) at produce prep Area located behind coolers and freezers approved. Hangers and supports above ceiling will be looked at during above ceiling inspection. |
| 06/05/2026 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 6-5-26: sheathing screw inspection at canal-yard decking, at Sprouts metal framing pop out at south side of building together with sheathing at rooftop tower approved. Okay to continue with construction at progress areas. |
| 05/19/2026 | COT - HCBU - Roof Nailing | N/A | Canceled | 5-19-26; canceled by contractor. |
| 03/19/2026 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 3/19/26: rough-soil for produce prep room. Ok to backfill. Shading required |
| 07/27/2026 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 7-27-26: verified pex lines at back of house all under test at 100 psi. |
| 07/29/2026 | COT - HCBU - Framing | N/A | Partial Pass | 7-29-26: Framing at hard lid areas at front offices approved. Add screws to east wall metal framing at "mother's room". Okay to continue with construction at front offices. |
| 07/29/2026 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | 7-29-26: verified pookie at mother's room and at front & back of house hard lid areas. Okay o continue with construction at progress areas. |
| 07/31/2026 | BULD - Electrical Clearance | N/A | Partial Pass | 7-31-26: partial pass pending address RFI approval by the city- okay to energize SES at 10015 E. Old Vail Rd. ECO clearance issued to TEP. |
| 07/08/2026 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | 7/8/26: one-side drywall screw inspection at GL E-F/1-2 okay to tape and texture |
| 07/08/2026 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 7/8/26: entry Canopies framing approved, roof nailing approved For both canopies, electrical above ceiling approved at both canopies. |
| 08/10/2026 | COT - HCME - Mechanical Progress | N/A | Partial Pass | 8/10/26: 1st smoke tests approved. Once clean outs are installed we will need to come back for 2nd smoke tests. Clean-outs required at every change of direction and 10' |
| 08/03/2026 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 8-3-26: partial pass at above ceiling electrical at sales areas. Install plastic bushings at junction boxes, add pigtails/ground screws and label all junction boxes. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0925-01634
Permit Description: Rev 1 - Update to electrical started 07.07.2026
New Build to Suite of a Sprouts Farmers Market.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2026 | COT - HCBU - Preslab | Passed | 5-7-26: reinforcement @ preslab for slab recess freezer verified per S300/Detail 6-okay to pour footings & over mesh. Schedule inspection to verify #3's @18" o.c. Prior to pouring 4" pad. Reinforcement/Preslab for dock leveler verified per S300 Detail's 9, 13, 14 & Dry pack for steel posts at G/L-A/3.3-3.5 & 2.8-2.7 all approved. Okay for concrete placement at progress areas. | |
| 07/31/2026 | COT - HCPL - Gas Pressure Test | Passed | 7-31-26: gas pressure test approved-verified system at 15 PSI. | |
| 08/03/2026 | COT - BULD - SWG Clearance | Passed | 8-3-26: okay to install meter- SWG clearance issued. |
Scheduled Inspections
Scheduled Inspections - TC-COM-0925-01634
Status: Issued
Description: Rev 1 - Update to electrical started 07.07.2026
New Build to Suite of a Sprouts Farmers Market.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 08/20/2026 | COT - HCEL - Electrical Intermediate | Scheduled |