Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2026 | ENGR Engineering Final | Partial Pass | Site and DP are almost complete. Okay to apply for TCO level 2. Outstanding conditions need to be satisfied. |