Permit: TC-COM-0624-01172
Permit Details
Status:
In Review
Type:
Commercial Building
Address:
812 E SPEEDWAY BL
Address NEW:
812 E SPEEDWAY BL
Apply Date:
06/19/2024
Applicant:
Abraham Mier
Description:
Superstructure and TI for Multi-family structure
Permit Reviews
Permit Number - TC-COM-0624-01172
Permit Status: In review
Permit Description: Superstructure and TI for Multi-family structure
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/05/2025 | COMMERCIAL REVIEW - FULL v.6 | 08/11/2025 | APPROVED |
| 02/03/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/12/2026 | REQUIRES RESUBMIT |
| 09/03/2024 | COMMERCIAL REVIEW - FULL v.2 | 10/18/2024 | REQUIRES RESUBMIT |
| 07/03/2025 | COMMERCIAL REVIEW - FULL v.5 | 07/24/2025 | REQUIRES RESUBMIT |
| 12/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/05/2026 | REQUIRES RESUBMIT |
| 06/20/2024 | COMMERCIAL REVIEW - FULL v.1 | 06/20/2024 | REQUIRES RESUBMIT |
| 04/09/2025 | COMMERCIAL REVIEW - FULL v.4 | 04/29/2025 | REQUIRES RESUBMIT |
| 04/29/2026 | COMMERCIAL REVIEW - FULL v.1 | N/A | IN REVIEW |
| 12/06/2024 | COMMERCIAL REVIEW - FULL v.3 | 01/09/2025 | REQUIRES RESUBMIT |
| 03/26/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 04/09/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0624-01172
Permit Status: In review
Permit Description: Superstructure and TI for Multi-family structure
Total Outstanding Activity Conditions - 21
| Date | Name |
|---|---|
| 07/17/2025 | AIR BALANCING REPORT IS REQUIRED. |
| 07/17/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 07/17/2025 | Elevator Designs must be submitted and approved prior to ... |
| 07/17/2025 | ELEVATOR INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
| 07/17/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 07/17/2025 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 07/17/2025 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
| 07/17/2025 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 07/17/2025 | Masonry Inspection Report submittal review is required. |
| 07/17/2025 | elevator shop drawing Designs must be submitted and approved prior to final. |
| 07/17/2025 | roof tie backs and anchorage Designs must be submitted and approved prior to final. |
| 07/17/2025 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
| 07/17/2025 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. |
| 07/17/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/17/2025 | Post-Installed Anchor Inspection Report is required. |
| 07/17/2025 | Post-Tension Inspection Report is required. |
| 07/17/2025 | SPECIAL INSPECTION FOR SRUCTURAL STEEL IS REQUIRED |
| 07/17/2025 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
| 07/17/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
| 07/22/2024 | Prior to project being finalized applicant must provide recordation information for the dedication of a portion of the alley to the east of the project boundary and for the dedication of the portion of Euclid to the west of the project boundary. |
| 08/12/2025 | Rezoning Condition for historic home rehab (separate residential alteration permits will be issued for each) must be satisfied prior to issuance of the Certificate of Occupancy. See zoning compliance letter TP-MOD-0723-000021) Contact John Beall with any questions or concerns and for release of condition. John.Beall@tucsonaz.gov (520) 837-6966 |
Conditions
Permit Number - TC-COM-0624-01172
Permit Status: In review
Permit Description: Superstructure and TI for Multi-family structure
| Date | Description | Comments |
|---|---|---|
| 06/20/2024 | Please contact Pima County Addressing to verify official address. Addressing@pima.gov or 520-724-9512 | |
| 06/20/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/17/2025 | Exterior cladding and steel stud Designs must be submitted and approved prior to Final | |
| 07/17/2025 | post tension shop drawing Designs must be submitted and approved prior to final | |
| 07/17/2025 | storefront shop drawings Designs must be submitted and approved prior to final. | |
| 06/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/20/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 07/17/2025 | Stair Designs must be submitted and approved prior to... | |
| 07/17/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TC-COM-0624-01172
Permite Description: Superstructure and TI for Multi-family structure
Total Outstanding Inspections - 15
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/08/2025 | COT - HCBU - Stem Wall/Retaining Wall | N/A | Partial Pass | Stairwell stem wall at 16”: GL: 11 - 12/B.5 - C. Ok to place grout in progress areas. |
| 11/13/2025 | COT - HCBU - Preslab | N/A | Partial Pass | Level #3 slab for Electric and plumbing at GL: 9.9 - 13/A - G. Ok to place concrete in completed areas. |
| 12/16/2025 | COT - HCPL - Plumbing Roof Drains | N/A | Partial Pass | Roof drain at Southeast corner of structure; 3” drain line and vent lines. Ok to,cover progress areas. |
| 12/29/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Masonry pre-grout: P-1 Southwest corner at 8’ - 12’ and East wall at 8’ - 12’. Ok to grout progress areas. |
| 04/01/2026 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | 4/1/26: 5th floor interior shear bracing (partial pass) pending plumbing walls. 2nd layer Densgalss approved at GL E/1-3 & GL B.5-E.5/1 floors 3- |
| 04/29/2026 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 4/29/26: Exterior first layer densglass @ 3rd floor GL A/4-13, exterior single layer densglass @ pool area 7th floor GL C-E/6-10.5 and GL C/6-10.5 |
| 05/14/2026 | COT - HCBU - Framing | N/A | Partial Pass | 5/14/2027 Nail Inspection for Shafts and Level 1 Unit Restrooms. 134,130,126,122,118 fire tape approved behind and to the side of shower walls. |
| 05/15/2026 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | Inter & Above ceiling 3rd floor rooms 362,359,360,358,356,354,352,353,350,351,348,346 approved. Okay to proceed progress areas. 5/15/2026 |
| 05/15/2026 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | 4th floor DWV, pex along with CPVC in rooms 413,414,415,457,455,454,452,453 on test. Inter & Above ceiling 3rd floor rooms 362,359,360,358,356,354,352,353,350,351,348,346 approved. Okay to proceed progress areas. 5/15/2026 |
| 05/07/2026 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 5/7/2026 Partial pass. DWV and pex under test in all units below. 341,342,343,344,346,348,351,350 441,442,443,444,446,448,451,450. Pending CPVC not under test. Pending 444,344 pex lines. |
| 05/15/2026 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | Inter & Above ceiling 3rd floor rooms 362,359,360,358,356,354,352,353,350,351,348,346 approved. Okay to proceed progress areas. 5/15/2026 |
| 04/16/2026 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 4/13/26: electrical 114,116,118,120,122,124,,126,128,130,132,134,136,138,140, |
| 05/15/2026 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | Inter & Above ceiling 3rd floor rooms 362,359,360,358,356,354,352,353,350,351,348,346 approved. Okay to proceed progress areas. 5/15/2026 |
| 12/17/2025 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | Basement level East ramp wall area, sections A - C duct system and fan units throughout. Area Level 1 to area P-1 duct system 90% completed. |
| 05/14/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | 5/14/2026 112, 114, 116, 118, 120, 122, 124, 126,128, 130, 132, 134, 136, 138, 140. demising walls and corridor seam below metal framing at ceiling okay to proceed with fire tape. 2nd floor draft stop in units 232-212 approved. Okay to proceed progress areas. 258,256,259,257 5/8” in between both walls (divided) approved. |
Completed Inspections
Permit Status: In Review
Permit Number: TC-COM-0624-01172
Permit Description: Superstructure and TI for Multi-family structure
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2026 | COT - HCBU - Roof Nailing | Passed |