Parcel: 11504505A


Addresses:

812 E SPEEDWAY BL


Inspection Status: Partial Pass

Inspection History: COT - HCBU - Preslab  

Permit Number - TC-COM-0624-01172

Inspection Description - COT - HCBU - Preslab  

Inspection Status - Partial Pass

Date Description Inspector Results Comments
09/02/2025 COT - HCBU - Preslab   Partial Pass Basement first level pre-slab at GL:1 - 10/A - E.5. OK to place concrete in progress areas.
09/29/2025 COT - HCBU - Preslab   Partial Pass Level #2, podium area Post Tension Cable system GL: 1 - 7/E.5 - A. OK to place concrete in progress areas.
10/01/2025 COT - HCBU - Preslab   Partial Pass Rebar for swimming pool at GL: D.5/7 - 8, 8/D.5 - C.5. OK to,place concrete in progress areas.
10/09/2025 COT - HCBU - Preslab   Partial Pass Post Tension Cable System on Level #2
Podium at GL: 5 - 7.5/D.5 -A. SOG at GL: 12.5 - 13/ E.9 - A. OK to place concrete in progress areas.
10/21/2025 COT - HCBU - Preslab   Partial Pass Level #2; Post tension Cable System at GL: 8 -12/A - F.9; F.9 - B/12.5. Ok to place concrete in progress areas.
10/23/2025 COT - HCBU - Preslab   Partial Pass Level #1 slab area at GL; 9.9 - 13/F.9 - E.9. Number 3 rebar reinforcement throughout slab area. OK to place concrete in slab area.
10/27/2025 COT - HCBU - Preslab   Partial Pass Level #3; double matted rebar system at GL: 9 - 13/F.9 - A. OK to place concrete in progress areas.
11/05/2025 COT - HCBU - Preslab   Partial Pass Level #3, second rebar mat at GL: 9.9 - 12/F.9 - D.5. OK to place concrete in progress areas.
11/06/2025 COT - HCBU - Preslab   Partial Pass Level #1 slab on grade at GL: 9 - 12/ E.5 - D. OK to place concrete in progress areas.
11/13/2025 COT - HCBU - Preslab   Partial Pass Level #3 slab for Electric and plumbing at GL: 9.9 - 13/A - G. Ok to place concrete in completed areas.