Permit: TC-COM-0624-01172

Parcel: 11504505A


Addresses:

812 E SPEEDWAY BL

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Interior Shear Bracing 

Date Description Inspector Results Comments
02/11/2026 COT - HCBU - Interior Shear Bracing  Partial Pass Level #3, inter shear walls,in Sections B and Section C.
02/23/2026 COT - HCBU - Interior Shear Bracing  Canceled Will reschedule for 24 February.
03/10/2026 COT - HCBU - Interior Shear Bracing  Partial Pass 3/10/26: exterior shear walls approved per plans specifications @ levels 5 and 6 GL C-G/3-4. Ok to proceed
03/26/2026 COT - HCBU - Interior Shear Bracing  Partial Pass 3/26/26: 4TH FLOOR SHEAR WALLS APPROVED (pending plumbing walls), Densgalss approved at exterior walls at GL E/6-11 (floors 2-4),Densgalss approved at exterior walls second layer at GL F-G/4 (floors 3-6)
04/01/2026 COT - HCBU - Interior Shear Bracing  Partial Pass 4/1/26: 5th floor interior shear bracing (partial pass) pending plumbing walls. 2nd layer Densgalss approved at GL E/1-3 & GL B.5-E.5/1 floors 3-
04/17/2026 COT - HCBU - Interior Shear Bracing  Partial Pass 4/16/16: 613,615,655,654,652,653,650,651,648,646,644,643,642,641 (interior shear walls , pending plumbing walls)
04/27/2026 COT - HCBU - Interior Shear Bracing  Partial Pass 4/27/26:
7th floor shear, 790,760,759,758,756,757,713
04/29/2026 COT - HCBU - Interior Shear Bracing  Partial Pass 4/29/26: interior shear walls approved at 7th floor units (715,755,754,752,753,750,751,748), first layer drywall in electrical rooms east wall only (276,376,476,576,676,767)
05/01/2026 COT - HCBU - Interior Shear Bracing  Partial Pass 5/1/26:Interior Shear Inspection for Level 7 Area A
05/07/2026 COT - HCBU - Interior Shear Bracing  Partial Pass 5/7/2026 Nail Inspection for Level 2 West Side Units 1st Layer Drywall. rooms 212-240 approved.