Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-COM-0624-01172

Parcel: 11504505A


Addresses:

812 E SPEEDWAY BL

Inspection Status: Requested

Inspection History: COT - HCME - Mechanical Above Ceiling

Date Description Inspector Results Comments
COT - HCME - Mechanical Above Ceiling Requested
05/01/2026 COT - HCME - Mechanical Above Ceiling Re-inspection required 5.1.26: Hot water lines 3/4" and larger shall be properly insulated with minimum R3 insulation, properly support pex line and DWV throughout, dryer exhaust must be constructed of smooth material, kitchen hood shall be constructed of smooth materials, fire caulking required throughout at common walls, proper secure low voltage, back to back receptacles with inserts are required to have putty pad installed, provide Documentation on how large penetrations will be sealed, separate MC cable from copper lines, seal all penetrations (from low volt, mechanical, sprinkler, plumbing)
05/05/2026 COT - HCME - Mechanical Above Ceiling Partial Pass 5/5/26: M.E.P APPROVED ABOVE CEILING IN STUDIO UNITS 1ST FLOOR (112,114,116,118,120,122,124,126,128,130,132,134,136,138,140)
05/06/2026 COT - HCME - Mechanical Above Ceiling Partial Pass 5/6/2026 MEP approved above ceilings 2nd floor units 212-240. Okay to proceed progress areas.
05/08/2026 COT - HCME - Mechanical Above Ceiling Partial Pass 5/8/2026 MEP approved above ceilings 2nd floor units 262,259,260,258,256,254,255,252,253,250,251,257,213,215. Okay to proceed progress areas.
05/13/2026 COT - HCME - Mechanical Above Ceiling Partial Pass 5/13/26:In-Wall and Above Inspection for Unit 112
05/15/2026 COT - HCME - Mechanical Above Ceiling Partial Pass Inter & Above ceiling 3rd floor rooms 362,359,360,358,356,354,352,353,350,351,348,346 approved. Okay to proceed progress areas. 5/15/2026