| 02/26/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
Exterior sheathing on West walls at Levels #1 - 4. Ok to cover progress areas. |
| 03/08/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
3/6/26: exterior sheathing fastened per approved plans at 3rd & 4th floor north west corner of building GL C-G/3-12. Dens glass sheathing installed per approved plans at 2nd floor GL F.9/4-12 |
| 03/11/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
3/11/26: Inspection for Exterior Shear & Sheathing on the Southwest Elevation floors (3,4,5,6) |
| 03/13/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
3/13/26: Exterior sheathing at GL F.5-D/ 1 on floors (3,4,5,6), exterior sheathing at GL G/4-6 approved at floor 6 |
| 03/17/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
3/17/26: exterior sheathing at GL B-D/1 on floors (3,4,5,6), Densgalss approved first layer with fasteners spaced at 24" o.c at GL B.5-F/ 1 on floors (2,4,5), Densgalss approved first layer at GL C-F.5/ 3-4 on floors (2,4,5) |
| 03/20/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
3/20/26: EXTERIOR SHEAR WALLS APPROVED AT pool/courtyard area from floors 3-5, south walls exterior sheathing approved from floors 2- |
| 03/24/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
3/24/26: exterior Densgalss approved first layer at GL C-F.9/ 3-4 (floors 5 and 6), exterior Densgalss approved first layer at GL D-E.5/1 (floors 3-6) |
| 03/26/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
3/26/26: 4TH FLOOR SHEAR WALLS APPROVED (pending plumbing walls), Densgalss approved at exterior walls at GL E/6-11 (floors 2-4),Densgalss approved at exterior walls second layer at GL F-G/4 (floors 3-6) |
| 03/27/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
3/27/26: DensGlass approved at floors 3-6 @ GL B.5-E.5/ |
| 04/01/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
4/1/26: 5th floor interior shear bracing (partial pass) pending plumbing walls. 2nd layer Densgalss approved at GL E/1-3 & GL B.5-E.5/1 floors 3- |
| 04/03/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
4/3/26: Exterior Drywall at Pool Area South Elevation 2-5 |
| 04/08/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
4/8/26: exterior shearwall per approved plans floors 3-7 @ GL A/1-5 |
| 04/09/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
4/9/26:Exterior Drywall for Level 2 East Side |
| 04/10/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
3/10/26: Exterior Drywall at the pool area for the east and north walls. Also exterior plywood sheathing for the east elevation floors 1-6 |
| 04/13/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
4/13/26: Exterior shear inspection for level 7 for the west and south elevations |
| 04/17/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
4/16/16: 613,615,655,654,652,653,650,651,648,646,644,643,642,641 (interior shear walls , pending plumbing walls) |
| 04/21/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
4/21/26: 7th floor dens glass first layer approved from GL C-G/1- |
| 04/24/2026 |
COT - HCBU - Exterior Clips/Sheathing |
|
Partial Pass |
4/24/26: Exterior Shear for Level 5,6,7 on the West Side & around the Pool Area |