| 02/26/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | Exterior sheathing on West walls at Levels #1 - 4. Ok to cover progress areas. | |
| 03/08/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 3/6/26: exterior sheathing fastened per approved plans at 3rd & 4th floor north west corner of building GL C-G/3-12. Dens glass sheathing installed per approved plans at 2nd floor GL F.9/4-12 | |
| 03/11/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 3/11/26: Inspection for Exterior Shear & Sheathing on the Southwest Elevation floors (3,4,5,6) | |
| 03/13/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 3/13/26: Exterior sheathing at GL F.5-D/ 1 on floors (3,4,5,6), exterior sheathing at GL G/4-6 approved at floor 6 | |
| 03/17/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 3/17/26: exterior sheathing at GL B-D/1 on floors (3,4,5,6), Densgalss approved first layer with fasteners spaced at 24" o.c at GL B.5-F/ 1 on floors (2,4,5), Densgalss approved first layer at GL C-F.5/ 3-4 on floors (2,4,5) | |
| 03/20/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 3/20/26: EXTERIOR SHEAR WALLS APPROVED AT pool/courtyard area from floors 3-5, south walls exterior sheathing approved from floors 2- | |
| 03/24/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 3/24/26: exterior Densgalss approved first layer at GL C-F.9/ 3-4 (floors 5 and 6), exterior Densgalss approved first layer at GL D-E.5/1 (floors 3-6) | |
| 03/26/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 3/26/26: 4TH FLOOR SHEAR WALLS APPROVED (pending plumbing walls), Densgalss approved at exterior walls at GL E/6-11 (floors 2-4),Densgalss approved at exterior walls second layer at GL F-G/4 (floors 3-6) | |
| 03/27/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 3/27/26: DensGlass approved at floors 3-6 @ GL B.5-E.5/ | |
| 04/01/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 4/1/26: 5th floor interior shear bracing (partial pass) pending plumbing walls. 2nd layer Densgalss approved at GL E/1-3 & GL B.5-E.5/1 floors 3- | |
| 04/03/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 4/3/26: Exterior Drywall at Pool Area South Elevation 2-5 | |
| 04/08/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 4/8/26: exterior shearwall per approved plans floors 3-7 @ GL A/1-5 | |
| 04/09/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 4/9/26:Exterior Drywall for Level 2 East Side | |
| 04/10/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 3/10/26: Exterior Drywall at the pool area for the east and north walls. Also exterior plywood sheathing for the east elevation floors 1-6 | |
| 04/13/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 4/13/26: Exterior shear inspection for level 7 for the west and south elevations | |
| 04/17/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 4/16/16: 613,615,655,654,652,653,650,651,648,646,644,643,642,641 (interior shear walls , pending plumbing walls) | |
| 04/21/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 4/21/26: 7th floor dens glass first layer approved from GL C-G/1- | |
| 04/24/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 4/24/26: Exterior Shear for Level 5,6,7 on the West Side & around the Pool Area | |
| 04/29/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 4/29/26: Exterior first layer densglass @ 3rd floor GL A/4-13, exterior single layer densglass @ pool area 7th floor GL C-E/6-10.5 and GL C/6-10.5 | |
| 05/01/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 4/30/26: Exterior Drywall Inspection for East Side Gridline 1 to 4 2nd Layer Dyrwall | |
| 05/04/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 5/4/25: 4th floor exterior Densgalss 1st layer at GL A/4-13, 3rd floor 2nd layer GL A/4-7 | |
| 05/06/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 5/6/2026 Partial pass. 3rd floor 2nd layer exterior dens glass grid line A/7/13 approved. Framing for exterior soffit at garage. North east end Grid line between A/B-9/13 |
|
| 05/08/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 5/8/2026 partial pass, Exterior Drywall 2nd layer at Level 7 Gridline 1 between B and E. Levels 3-7 Gridline 1 between A and B. Okay to proceed progress areas. | |
| 05/14/2026 | COT - HCBU - Exterior Clips/Sheathing | Partial Pass | 5/14/2026 partial pass, Exterior Drywall Inspection for East Side Level 4 2nd Layer approved. Okay to proceed progress areas. |