Inspection Status: Partial Pass

Inspection History: COT - HCBU - Exterior Clips/Sheathing 

Date Description Inspector Results Comments
02/26/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass Exterior sheathing on West walls at Levels #1 - 4. Ok to cover progress areas.
03/08/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 3/6/26: exterior sheathing fastened per approved plans at 3rd & 4th floor north west corner of building GL C-G/3-12. Dens glass sheathing installed per approved plans at 2nd floor GL F.9/4-12
03/11/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 3/11/26: Inspection for Exterior Shear & Sheathing on the Southwest Elevation floors (3,4,5,6)
03/13/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 3/13/26: Exterior sheathing at GL F.5-D/ 1 on floors (3,4,5,6), exterior sheathing at GL G/4-6 approved at floor 6
03/17/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 3/17/26: exterior sheathing at GL B-D/1 on floors (3,4,5,6), Densgalss approved first layer with fasteners spaced at 24" o.c at GL B.5-F/ 1 on floors (2,4,5), Densgalss approved first layer at GL C-F.5/ 3-4 on floors (2,4,5)
03/20/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 3/20/26: EXTERIOR SHEAR WALLS APPROVED AT pool/courtyard area from floors 3-5, south walls exterior sheathing approved from floors 2-
03/24/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 3/24/26: exterior Densgalss approved first layer at GL C-F.9/ 3-4 (floors 5 and 6), exterior Densgalss approved first layer at GL D-E.5/1 (floors 3-6)
03/26/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 3/26/26: 4TH FLOOR SHEAR WALLS APPROVED (pending plumbing walls), Densgalss approved at exterior walls at GL E/6-11 (floors 2-4),Densgalss approved at exterior walls second layer at GL F-G/4 (floors 3-6)
03/27/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 3/27/26: DensGlass approved at floors 3-6 @ GL B.5-E.5/
04/01/2026 COT - HCBU - Exterior Clips/Sheathing  Partial Pass 4/1/26: 5th floor interior shear bracing (partial pass) pending plumbing walls. 2nd layer Densgalss approved at GL E/1-3 & GL B.5-E.5/1 floors 3-