Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Requested
Inspection History: COT - HCEL - Electrical Above Ceiling
| Date |
Description |
Inspector |
Results |
Comments |
|
COT - HCEL - Electrical Above Ceiling |
|
Requested |
|
| 05/01/2026 |
COT - HCEL - Electrical Above Ceiling |
|
Re-inspection required |
5.1.26: Hot water lines 3/4" and larger shall be properly insulated with minimum R3 insulation, properly support pex line and DWV throughout, dryer exhaust must be constructed of smooth material, kitchen hood shall be constructed of smooth materials, fire caulking required throughout at common walls, proper secure low voltage, back to back receptacles with inserts are required to have putty pad installed, provide Documentation on how large penetrations will be sealed, separate MC cable from copper lines, seal all penetrations (from low volt, mechanical, sprinkler, plumbing) |
| 05/04/2026 |
COT - HCEL - Electrical Above Ceiling |
|
Re-inspection required |
5/4/26: putty pads at receptacle boxes shall not be over stretched as this will ruin the UL listing on product (1/8" thickness around boxes, all penetrations at top plates shall be fire caulked, draft stop required horizontally every 10' at common walls, nail plates required where MEP come within 1/4" from face of stud, over notched or over board top & bottom plates required structural strap and this strap shall extend 2" below and above the plates. Ensure all NM cable is secured off of gusset plates, damaged gusset plates on trusses required engineer fix. Smoke detectors required in each room and in the immediate vicinity outside of the rooms. Smoke detectors shall be no closer than 10' to kitchen range. |
| 05/06/2026 |
COT - HCEL - Electrical Above Ceiling |
|
Partial Pass |
5/6/2026 MEP approved above ceilings 2nd floor units 212-240. Okay to proceed progress areas. |
| 05/08/2026 |
COT - HCEL - Electrical Above Ceiling |
|
Partial Pass |
5/8/2026 MEP approved above ceilings 2nd floor units 262,259,260,258,256,254,255,252,253,250,251,257,213,215. Okay to proceed progress areas. |
| 05/13/2026 |
COT - HCEL - Electrical Above Ceiling |
|
Partial Pass |
5/13/26:In-Wall and Above Inspection for Unit 112 |
| 05/15/2026 |
COT - HCEL - Electrical Above Ceiling |
|
Partial Pass |
Inter & Above ceiling 3rd floor rooms 362,359,360,358,356,354,352,353,350,351,348,346 approved. Okay to proceed progress areas. 5/15/2026 |