Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Firewall/Fire Barrier/Firestop
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Re-inspection required | 5.1.26: Hot water lines 3/4" and larger shall be properly insulated with minimum R3 insulation, properly support pex line and DWV throughout, dryer exhaust must be constructed of smooth material, kitchen hood shall be constructed of smooth materials, fire caulking required throughout at common walls, proper secure low voltage, back to back receptacles with inserts are required to have putty pad installed, provide Documentation on how large penetrations will be sealed, separate MC cable from copper lines, seal all penetrations (from low volt, mechanical, sprinkler, plumbing) | |
| 05/05/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 5/5/26: Drywall inspection for electrical rooms east wall (in rooms 276,376,476,576,676,776) | |
| 05/08/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 5/8/2026 MEP approved above ceilings 2nd floor units 262,259,260,258,256,254,255,252,253,250,251,257,213,215. Okay to proceed progress areas. | |
| 05/11/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 5/11/26: draft stop installed in wall at units 118,120,122,124,126 | |
| 05/12/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 5/12/26: draft stop installed in wall at units 130,132,134,136,138,140 | |
| 05/14/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 5/14/2026 112, 114, 116, 118, 120, 122, 124, 126,128, 130, 132, 134, 136, 138, 140. demising walls and corridor seam below metal framing at ceiling okay to proceed with fire tape. 2nd floor draft stop in units 232-212 approved. Okay to proceed progress areas. 258,256,259,257 5/8” in between both walls (divided) approved. |
|
| 05/15/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | Inter & Above ceiling 3rd floor rooms 362,359,360,358,356,354,352,353,350,351,348,346 approved. Okay to proceed progress areas. 5/15/2026 | |
| 05/18/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 5/18/26: shower wall fire taping rooms (134,136,138), shower walls 2nd floor screw inspection ( 212,214,216,218,220,222,224,226,228,230), MEP rooms 316,322,317,330,319, over notched studs require fix, code compliance nail plates required at plumbing walls | |
| 05/22/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 5/22/26: draft stop installed in units (255,252,253,250), fire taping at shower walls in rooms (232,234,236,238) approved | |
| 05/29/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 5/29/26:MEP approved In rooms 462,460,459,471,458,456,454, 452,450,453,455,457,413 | |
| 06/01/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | Partial pass 4th floor units 415,484,416,422,417,430,419,436,485,441,442 approved. Okay to proceed progress areas. 6/1/2026 | |
| 06/02/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | Partial pass. 2nd floor 2nd layer behind tubs okay to proceed with fire taping rooms 262,258,256,254 2nd floor 1st layer adjacent to corridor approved rooms 252,250,215. 2nd floor party wall facing north 1 layer in rooms 251,253,255, 3rd - 6th floor shaft areas 2nd layer approved. Okay to fire tape. Shaft 9,8,7,6,5,4. 6/2/2026 |
|
| 06/03/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 6/3/26: above ceiling MEP and framing approved In rooms (184,179.4,179.3,179.2,180,180.183,183A,178.1,178.2,178.3,178.4,178.5,178.6,) | |
| 06/04/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 6/4/26:Fastener spacing approval at 2nd layer behind tubs in rooms 251,250,252,253,255,257,260,259,213,215, Fire tape at areas behind tubs in rooms 254,256,258,262 |
|
| 06/08/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 6/8/26: 3rd floor corridor approved and draft stop between partition walls. | |
| 06/09/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | Partial Pass | 6/9/26: Shaft # 8 3rd-4th floor (fire tape), shaft (#4,5,6,7,8,9) 3rd-6th floor (fire tape), rooms (372,472,572,672,772,373,573,773) fire tape, elec room (376,476,576,676,776) 2nd layer, shaft # 4 and 5 floors 3-6 | |
| COT - HCBU - Firewall/Fire Barrier/Firestop | Scheduled |