Permit: TC-COM-0624-01172

Parcel: 11504508C


Addresses:

818 E SPEEDWAY BL

Inspection Status: Partial Pass

Inspection History: COT - HCPL - Plumbing Roof Drains

Date Description Inspector Results Comments
06/25/2026 COT - HCPL - Plumbing Roof Drains Partial Pass Partial pass. Total of 26 roof drains under test. Okay to release pressure. Pending securing roof drains two points. 6/25/2026
06/26/2026 COT - HCPL - Plumbing Roof Drains Partial Pass Partial pass. MEP approved 5th floor units 554,552,553,550,551,548,546,543,542,541. 6/26/2026
06/29/2026 COT - HCPL - Plumbing Roof Drains Partial Pass 6/29/26: 5TH floor MEP Corridor and above ceiling and in wall.
Interior shear-bracing 2nd floor corridor and shaft#
07/02/2026 COT - HCPL - Plumbing Roof Drains Passed
12/16/2025 COT - HCPL - Plumbing Roof Drains Partial Pass Roof drain at Southeast corner of structure; 3” drain line and vent lines. Ok to,cover progress areas.