Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCME - Mechanical Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 5/13/26:In-Wall and Above Inspection for Unit 112 | |
| 05/15/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | Inter & Above ceiling 3rd floor rooms 362,359,360,358,356,354,352,353,350,351,348,346 approved. Okay to proceed progress areas. 5/15/2026 | |
| 05/18/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 5/18/26: shower wall fire taping rooms (134,136,138), shower walls 2nd floor screw inspection ( 212,214,216,218,220,222,224,226,228,230), MEP rooms 316,322,317,330,319, over notched studs require fix, code compliance nail plates required at plumbing walls | |
| 05/29/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 5/29/26:MEP approved In rooms 462,460,459,471,458,456,454, 452,450,453,455,457,413 | |
| 06/01/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | Partial pass 4th floor units 415,484,416,422,417,430,419,436,485,441,442 approved. Okay to proceed progress areas. 6/1/2026 | |
| 06/03/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 6/3/26: above ceiling MEP and framing approved In rooms (184,179.4,179.3,179.2,180,180.183,183A,178.1,178.2,178.3,178.4,178.5,178.6,) | |
| 06/04/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 6/4/26: MEP approval in rooms 446,448,451,443 Fastener spacing approval at 2nd layer behind tubs in rooms 251,250,252,253,255,257,260,259,213,215, Fire tape at areas behind tubs in rooms 254,256,258,262 |
|
| 06/08/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 6/8/26: 3rd floor corridor approved and draft stop between partition walls. | |
| 06/12/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 6/12/26: CORRIDOR 2ND FLOOR ABOVE CEILING MEP, IN WALL 2ND FLOOR (279,280.1,280.2,280.3,280.4,280.5,280.6), 5th floor (pvc,CPVC,pex rooms 557,513,555,516,515 pressure test approved), 6th floor pvc test (657,613,656,616,615), 7th floor pvc (756,713,756,716,715) | |
| 06/18/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 6/18/26: MEP APPROVED IN ROOMS 562,559,560,558(pending mechanical), 556 ATS ROD ROOMS 416-413-415-457-455 |
|
| 06/24/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | Level 4 all corridors approved. Okay to proceed progress areas. 6/24/2026 | |
| 06/25/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | Partial pass. MEP approved 5th floor units 516,513,515,557,555. 6/25/2026 | |
| 06/26/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | Partial pass. MEP approved 5th floor units 554,552,553,550,551,548,546,543,542,541. 6/26/2026 | |
| 06/29/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 6/29/26: 5TH floor MEP Corridor and above ceiling and in wall. Interior shear-bracing 2nd floor corridor and shaft# |
|
| 07/02/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 7/2/2026 Partial pass. Lighting in place at Exterior garage soffit north east corner. MEP approved units 662,659,660,658,656,654,657,655,615,613. Okay to proceed progress areas. | |
| 07/06/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 7/6/2026 Partial pass. Level 6 Framing and MEP In-Wall & Above Ceiling. Units 652,653,650,651,648,646,643,642,641 | |
| 07/09/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 7/9/2026 Partial pass. Level 6 Corridor Framing and MEP Above Ceiling & In-Wall along with unit 644. | |
| 07/15/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 7/15/2026 Partial pass. 7th floor units 762,759,760,758 approved. | |
| 07/20/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 7/20/26: partial pass 7th floor units 756,257,713,716,715 approved. | |
| 07/26/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 7/24/26: partial pass 7th floor units 748,746,742,741,743 approved | |
| 07/30/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 7/30/26: 7TH FLOOR UNIT 741 MEP approved. Electrical in wall at 7th floor corridor pending supports throughout at nm cable at boxes, above ceiling pending lighting, mechanical approved, plumbing above ceiling approved, plumbing wall requires FHA where top plates are notched greater than 50%. 1st floor above ceiling in lobby are approved, 1st floor room 183 in wall and above ceiling approved. | |
| 07/31/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 7/31/2026 Partial pass. 2nd floor corridors 280. Above ceiling inspection. Up to north section. Pending mid section at entry of unit 279 east area. North east area approved. 1st floor units MEP and above ceilings 102,104,106,108,113. 2nd floor unit MEP and above ceiling 278 pending point 1-2-3. |
|
| 08/03/2026 | COT - HCME - Mechanical Intermediate | Re-inspection required | 8/3/2026 Inspection for Trash Shute Shaft. Ensure all connection at exhaust ducts are intact and sealed. | |
| 08/17/2026 | COT - HCME - Mechanical Intermediate | Re-inspection required | 8/16/2026 Inspection for Shafts. Ensure mc cable is secured vertically. Remove all threads and fire caulk open penetrations. Ensure all penetrations have been fire caulked. | |
| 08/19/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 8/19/2026 Partial pass. Shafts 3rd and 4th floors at corridors 470,473,474 approved. Okay to proceed progress areas. Pending shafts adjacent to or in units 458,416,446,441. | |
| 08/20/2026 | COT - HCME - Mechanical Intermediate | Partial Pass | 8/20/2026 Partial pass. 3rd floor and 4th floors shafts adjacent to or in units 458,416,446,441 approved. | |
| 12/17/2025 | COT - HCME - Mechanical Intermediate | Partial Pass | Basement level East ramp wall area, sections A - C duct system and fan units throughout. Area Level 1 to area P-1 duct system 90% completed. |