Permit: TC-COM-0624-01172

Parcel: 11504505A


Addresses:

812 E SPEEDWAY BL

Inspection Status: Partial Pass

Inspection History: COT - HCME - Mechanical Intermediate

Date Description Inspector Results Comments
05/13/2026 COT - HCME - Mechanical Intermediate Partial Pass 5/13/26:In-Wall and Above Inspection for Unit 112
05/15/2026 COT - HCME - Mechanical Intermediate Partial Pass Inter & Above ceiling 3rd floor rooms 362,359,360,358,356,354,352,353,350,351,348,346 approved. Okay to proceed progress areas. 5/15/2026
05/18/2026 COT - HCME - Mechanical Intermediate Partial Pass 5/18/26: shower wall fire taping rooms (134,136,138), shower walls 2nd floor screw inspection ( 212,214,216,218,220,222,224,226,228,230), MEP rooms 316,322,317,330,319, over notched studs require fix, code compliance nail plates required at plumbing walls
05/29/2026 COT - HCME - Mechanical Intermediate Partial Pass 5/29/26:MEP approved In rooms 462,460,459,471,458,456,454, 452,450,453,455,457,413
06/01/2026 COT - HCME - Mechanical Intermediate Partial Pass Partial pass 4th floor units 415,484,416,422,417,430,419,436,485,441,442 approved. Okay to proceed progress areas. 6/1/2026
06/03/2026 COT - HCME - Mechanical Intermediate Partial Pass 6/3/26: above ceiling MEP and framing approved In rooms (184,179.4,179.3,179.2,180,180.183,183A,178.1,178.2,178.3,178.4,178.5,178.6,)
06/04/2026 COT - HCME - Mechanical Intermediate Partial Pass 6/4/26: MEP approval in rooms 446,448,451,443

Fastener spacing approval at 2nd layer behind tubs in rooms 251,250,252,253,255,257,260,259,213,215,

Fire tape at areas behind tubs in rooms 254,256,258,262
06/08/2026 COT - HCME - Mechanical Intermediate Partial Pass 6/8/26: 3rd floor corridor approved and draft stop between partition walls.
12/17/2025 COT - HCME - Mechanical Intermediate Partial Pass Basement level East ramp wall area, sections A - C duct system and fan units throughout. Area Level 1 to area P-1 duct system 90% completed.