Permit: TC-COM-0624-01172

Parcel: 11504508C


Addresses:

818 E SPEEDWAY BL

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
01/08/2026 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Area L-1 slab on grade wall at 12’ at Area P-1. Ok to place grout in progress areas.
01/09/2026 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout inspection; Level #1 slab on grade CMU wall at area P1 at 8’4”; approximately 35 feet. Ok to grout progress areas. Elevator shaft at Level #1; masonry lentil at elevator opening. Ok to grout progress area.
01/12/2026 COT - HCBU - Excavation/Rebar/Zoning  Canceled Contractor cancelled, will reschedule for 13 January.
01/14/2026 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout: Ramp at area of L-1 next to Level P-1. Ok to place concrete in progress area. Storage room at stairwell #1 area, 6’4” AFFE. OK to grout CME walls. Electric underground: Level #1, East and Southeast trench with 5 each 3” conduits from electric room North to new transformer area. Ok to,cover progress area.
06/26/2026 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 6/26/2026 partial pass, Rebar Inspection for crane pour back at Levels P1, 1, and 2 approved per third party report approval.
08/25/2025 COT - HCBU - Excavation/Rebar/Zoning  Canceled Contractor cancelled.
08/27/2025 COT - HCBU - Excavation/Rebar/Zoning  Canceled Contractor cancelled.
08/28/2025 COT - HCBU - Excavation/Rebar/Zoning  Canceled Contractor cancelled.
08/29/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Columns (5) from Level #1 to Level #2 at GL: E.9 - B/12. OK to place rebar cages onto progress areas.
09/03/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Columns at Level #1 to Level #2 at GL: 9 - 12/A; E/6.1 - 7.1, D/6.1 - 7.1. Ok to set forms and place concrete in progress areas.
09/04/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Column footings at GL: 12.5/F.8 - D; wall footings at GL: F.9/9 - 11.2. OK to place concrete in progress areas.
09/05/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Information for scheduling of Post Tension Cable inspections.
09/09/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Post Tension Cable System on Level #1 deck at,GL: 4 - 8/E.9 - F.9. Ok to place concrete in progress areas.
09/10/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass This inspection is for plumbing underground: waste and vent lines (2 1/2” - 6”) at GL: E.9 - F.9/8 - 10. OK to cover progress areas.
09/15/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Scheduling information for next post tension inspection.
09/18/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Level #1; Post Tension Cable System. Cables and rebar in place. Ok to place concrete in progress areas.
09/22/2025 COT - HCBU - Excavation/Rebar/Zoning  Canceled Contractor cancelled, will reschedule for 23 September.
09/23/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 9/23/25: CC1 verified reinforcement per plan from first floor to second floor at GL D/9.9,D/11,C/9,B/8,A/8
09/24/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Level #2 podium columns at GL: 9/A - E; 9.9/C - E. OK to set forms and place concrete.
09/25/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Information only; scheduling for post tension cable inspections.
09/30/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Columns at GL: 8/E - B (4 each). Ok to set forms and place concrete.
10/03/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Level #2 columns at GL: E/1, 3, 4, D/1, D/2. OK to set forms and place concrete.
10/06/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Level #2; Podium columns (16) at GL: 1.2 - 5/A - E. OK to.set forms and place concrete in progress areas.
10/07/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Level #2 columns at GL: 4/E-D, 4/B. OK to,set forms and place concrete in progress areas.
10/10/2025 COT - HCBU - Excavation/Rebar/Zoning  Canceled Will reschedule for 13 October.
10/14/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Level #2 columns at GL: 7/C, 7/D, 7E, 8/D, 8/E. OK to set for,s and place concrete in progress areas.
10/15/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Level #2; columns at GL: 6/A, B, C. OK to set forms and place concrete.
10/16/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Level #2; columns at GL: 7/A, B, C, 8/A, B, C. OK to set forms and place concrete in progress areas.
10/20/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Level #2, post tension cable pre-inspection. Final inspection scheduled for 21 October.
10/29/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Level #3; 10 columns at GL: 8 - 11.5/A - C. OK to set forms and place concrete.
10/30/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry walls at Stairwell #1 and Stairwell #2 are 0’ - 4’ AFFE. OK to place grout in progress areas.
10/31/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Level #3; first rebar mat in place at GL: 9.9 - 12/E.9 - D.5. OK to place second rebar mat.
11/04/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Stairwell #1: CMU walls at 0” - 48”. Ok to grout progress areas.
11/10/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Pre-slab at Level #1, GL: 7.9 - 9/ G - E.9. OK to place concrete in progress area. Masonry pre-grout at elevator #2; GL: 12 - 13/G - F.9 at 5’4” - 10’8”. Elevator #3 at GL: C - C.5/11 - 12. OK to grout progress areas.
11/12/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Scheduling for remainder of Post Tension Cable inspections.
11/13/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Level #3: Post Tension Cable system at GL: 9.9 -13 /A - G. OK to place concrete in progress areas.
11/19/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout at Elevator Level #2, stairwell #2 at level #4; stairwell #3 at level #4. Ok to grout progress areas.
11/21/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout: Elevator shaft at 80” above Level #3; stairwell #3 at Level #3; stairwell #2 at Level #5. Ok to grout progress areas.
11/24/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout: Elevator shaft at Level #5; Stairwell #1 at Level #3; Stairwell #2 at Level #4. Ok to grout progress areas.
11/25/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout: Stairwell #1/Elevator at Level #4, Stairwell #2 at Level #5, Stairwell #2 at Level #6. Ok to place grout in progress areas.
11/26/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry Pre-grout: Stairwell/elevator shaft at Level #4; Stairwell #2 at Level #6; Stairwell #3 at Level,#5. Ok to place grout in progress areas.
12/01/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout: Stairwell #1 at Level #6; Stairwell/elevator shaft #2 at Level #7; Stairwell #3 at Level #5. Ok to place grout in progress areas.
12/02/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout: Stairwell #1 at Level #5 to #6; Stairwell #2 at Level #7 - #8; Stairwell #3 at Level #5 - #6. Ok to place grout in progress areas.
12/03/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout of stairwell #1 at Level #5 -6; Stairwell #2 topped out at Level #8; Stairwell #3 at Level #6 - 7. Ok to grout progress areas.
12/04/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Stairwell #1 at Level #5 - #6; Stairwell #3 at Level #6 - #7. Ok to place grout in progress areas.
12/05/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout; Stairwell #1 at Level #7, Stairwell #3 at Level #8. Ok to place grout in progress areas.
12/10/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass
12/12/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 12/12/2025 final lift at north elevator per third party report approval.
12/16/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout at Level #1, Section C at 56” AFFE. OK to place grout in progress areas.
12/17/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Level #1 West wall of area C; area P-1 East walls at 56” AFFE. OK to place concrete in progress areas.
12/18/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout: Level #1, Southeast corner of structure, CMU wall at 24’ - 56” at approximately 45’. Ok to grout progress area.
12/22/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout: Level P-1, electric room at 8’ - 12’ AFFE. OK to grout progress area.
12/23/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout: Southeast corner of structure at 8’ - 12’ AFFE. OK to grout progress areas.
12/29/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Masonry pre-grout: P-1 Southwest corner at 8’ - 12’ and East wall at 8’ - 12’. Ok to grout progress areas.