Inspection History Details
Inspection Status: Canceled
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
Permit Number - TC-COM-0624-01172
Inspection Description - COT - HCBU - Excavation/Rebar/Zoning
Inspection Status - Canceled
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2025 | COT - HCBU - Excavation/Rebar/Zoning | Canceled | Contractor cancelled. | |
| 08/27/2025 | COT - HCBU - Excavation/Rebar/Zoning | Canceled | Contractor cancelled. | |
| 08/28/2025 | COT - HCBU - Excavation/Rebar/Zoning | Canceled | Contractor cancelled. | |
| 08/29/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Columns (5) from Level #1 to Level #2 at GL: E.9 - B/12. OK to place rebar cages onto progress areas. | |
| 09/03/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Columns at Level #1 to Level #2 at GL: 9 - 12/A; E/6.1 - 7.1, D/6.1 - 7.1. Ok to set forms and place concrete in progress areas. | |
| 09/04/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Column footings at GL: 12.5/F.8 - D; wall footings at GL: F.9/9 - 11.2. OK to place concrete in progress areas. | |
| 09/05/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Information for scheduling of Post Tension Cable inspections. | |
| 09/09/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Post Tension Cable System on Level #1 deck at,GL: 4 - 8/E.9 - F.9. Ok to place concrete in progress areas. | |
| 09/10/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | This inspection is for plumbing underground: waste and vent lines (2 1/2” - 6”) at GL: E.9 - F.9/8 - 10. OK to cover progress areas. | |
| 09/15/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Scheduling information for next post tension inspection. | |
| 09/18/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Level #1; Post Tension Cable System. Cables and rebar in place. Ok to place concrete in progress areas. | |
| 09/22/2025 | COT - HCBU - Excavation/Rebar/Zoning | Canceled | Contractor cancelled, will reschedule for 23 September. | |
| 09/23/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 9/23/25: CC1 verified reinforcement per plan from first floor to second floor at GL D/9.9,D/11,C/9,B/8,A/8 | |
| 09/24/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Level #2 podium columns at GL: 9/A - E; 9.9/C - E. OK to set forms and place concrete. | |
| 09/25/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Information only; scheduling for post tension cable inspections. | |
| 09/30/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Columns at GL: 8/E - B (4 each). Ok to set forms and place concrete. | |
| 10/03/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Level #2 columns at GL: E/1, 3, 4, D/1, D/2. OK to set forms and place concrete. | |
| 10/06/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Level #2; Podium columns (16) at GL: 1.2 - 5/A - E. OK to.set forms and place concrete in progress areas. | |
| 10/07/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Level #2 columns at GL: 4/E-D, 4/B. OK to,set forms and place concrete in progress areas. | |
| 10/10/2025 | COT - HCBU - Excavation/Rebar/Zoning | Canceled | Will reschedule for 13 October. | |
| 10/14/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Level #2 columns at GL: 7/C, 7/D, 7E, 8/D, 8/E. OK to set for,s and place concrete in progress areas. | |
| 10/15/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Level #2; columns at GL: 6/A, B, C. OK to set forms and place concrete. | |
| 10/16/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Level #2; columns at GL: 7/A, B, C, 8/A, B, C. OK to set forms and place concrete in progress areas. | |
| 10/20/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Level #2, post tension cable pre-inspection. Final inspection scheduled for 21 October. | |
| 10/29/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Level #3; 10 columns at GL: 8 - 11.5/A - C. OK to set forms and place concrete. | |
| 10/30/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Masonry walls at Stairwell #1 and Stairwell #2 are 0’ - 4’ AFFE. OK to place grout in progress areas. | |
| 10/31/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Level #3; first rebar mat in place at GL: 9.9 - 12/E.9 - D.5. OK to place second rebar mat. | |
| 11/04/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Stairwell #1: CMU walls at 0” - 48”. Ok to grout progress areas. | |
| 11/10/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Pre-slab at Level #1, GL: 7.9 - 9/ G - E.9. OK to place concrete in progress area. Masonry pre-grout at elevator #2; GL: 12 - 13/G - F.9 at 5’4” - 10’8”. Elevator #3 at GL: C - C.5/11 - 12. OK to grout progress areas. | |
| 11/12/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Scheduling for remainder of Post Tension Cable inspections. | |
| 11/13/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Level #3: Post Tension Cable system at GL: 9.9 -13 /A - G. OK to place concrete in progress areas. | |
| 11/19/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Masonry pre-grout at Elevator Level #2, stairwell #2 at level #4; stairwell #3 at level #4. Ok to grout progress areas. | |
| 11/21/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Masonry pre-grout: Elevator shaft at 80” above Level #3; stairwell #3 at Level #3; stairwell #2 at Level #5. Ok to grout progress areas. | |
| 11/24/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Masonry pre-grout: Elevator shaft at Level #5; Stairwell #1 at Level #3; Stairwell #2 at Level #4. Ok to grout progress areas. | |
| 11/25/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Masonry pre-grout: Stairwell #1/Elevator at Level #4, Stairwell #2 at Level #5, Stairwell #2 at Level #6. Ok to place grout in progress areas. | |
| 11/26/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Masonry Pre-grout: Stairwell/elevator shaft at Level #4; Stairwell #2 at Level #6; Stairwell #3 at Level,#5. Ok to place grout in progress areas. | |
| 12/01/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Masonry pre-grout: Stairwell #1 at Level #6; Stairwell/elevator shaft #2 at Level #7; Stairwell #3 at Level #5. Ok to place grout in progress areas. | |
| 12/02/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Masonry pre-grout: Stairwell #1 at Level #5 to #6; Stairwell #2 at Level #7 - #8; Stairwell #3 at Level #5 - #6. Ok to place grout in progress areas. | |
| 12/03/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Masonry pre-grout of stairwell #1 at Level #5 -6; Stairwell #2 topped out at Level #8; Stairwell #3 at Level #6 - 7. Ok to grout progress areas. | |
| 12/04/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Stairwell #1 at Level #5 - #6; Stairwell #3 at Level #6 - #7. Ok to place grout in progress areas. | |
| 12/05/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Masonry pre-grout; Stairwell #1 at Level #7, Stairwell #3 at Level #8. Ok to place grout in progress areas. |