Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL ADDITION
Address:
7250 S TUCSON BL
Address NEW:
7250 S TUCSON BL
Apply Date:
01/16/2001
Applicant:
N/A
Description:
ADDITION:TERMINAL EXPANSION AND REMODEL
Architects:
  • BEACH, RICHARD A
Contractors:
  • SUNDT CORP

Permit Reviews

Permit Number - T01CM00202
Permit Status: C of o
Permit Description: ADDITION:TERMINAL EXPANSION AND REMODEL
Start Date Submittal Complete Date Status  
01/16/2001 COMMERCIAL NEW 06/07/2002 COMPLETED Review Details
01/16/2001 SITE 06/07/2002 COMPLETED Review Details
03/13/2003 REVISION 03/14/2003 COMPLETED Review Details
03/17/2005 REVISION - WALK THRU 03/25/2005 COMPLETED Review Details
04/07/2005 REVISION 05/20/2005 COMPLETED Review Details
04/24/2003 3RD PARTY REVIEW-REVISION/OTHER 04/28/2003 COMPLETED Review Details
05/07/2003 3RD PARTY REVIEW-REVISION/OTHER 05/21/2003 COMPLETED Review Details
05/17/2004 3RD PARTY REVIEW-REVISION/OTHER 05/19/2004 COMPLETED Review Details
05/23/2003 3RD PARTY REVIEW-REVISION/OTHER 06/12/2003 COMPLETED Review Details
06/08/2005 REVISION 06/27/2005 COMPLETED Review Details
07/11/2003 REVISION 07/28/2003 COMPLETED Review Details
08/06/2003 3RD PARTY REVIEW-REVISION/OTHER 08/11/2003 COMPLETED Review Details
08/06/2003 3RD PARTY REVIEW-REVISION/OTHER 08/25/2003 COMPLETED Review Details
09/08/2003 3RD PARTY REVIEW-REVISION/OTHER 10/07/2003 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T01CM00202
Permit Status: C of o
Permit Description: ADDITION:TERMINAL EXPANSION AND REMODEL
Total Outstanding Activity Conditions - 1
Date Name
01/16/2001 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T01CM00202
Permit Description: ADDITION:TERMINAL EXPANSION AND REMODEL
Total Completed Inspections - 38
Date Description Inspector Results Comments
07/12/2002 ELECTRIC - TEMPORARY POLE JORTA Approved NO INSPECTION. ALREADY INSPECTED AND ENERIZED BY TUCSON ELECTRIC POWER.
09/10/2002 ELECTRIC - TEMPORARY SERVICE JORTA Approved IVRS - Inspection 0000*
12/17/2002 ELECTRIC - UNDERGROUND MCAPISTR Approved IVRS - Inspection 0000*1.) PVC FROM COLUMNS UNDERSLAB.
2.) PHONE PEDESTAL COM & PWR PVC.
3.) FLOOR BOX CENTER FRONT OF APART ADDN.
12/24/2002 PLUMBING - ROUGH, SOIL RMYERS Approved 1.) APPROVED AS NOTED ON PLAN OK TO COVER.
12/24/2002 BUILDING ABOVE CEILING LHANLY Approved IVRS - Inspection 0000*
1.) CAFCO SPRAY ON FIREPROOFING APPLIED TO STRUCTURAL STEEL @ A-B/1-7 TO DEPTH OF 1 1/2".
05/16/2003 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
09/22/2003 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
09/23/2003 PLUMBING - PROGRESS RRICH Approved IVRS - Inspection 0000*/ 1) PLUMBING FINAL FOR TEMP. C OF O UPON COMPLETION OF POSTING OF BOND AND ISSUANCE OF CITY APPROVED DRAWING FOR WEST BAGGAGE LEVEL WOMENS REST ROOM WASTE AND VENT. THIS COVRERS BAGGAGE AND TICKETING LEVEL 1&2 , 101 - 22. 2) THIS ALSO COVERS MAINTENANCE SHOP AT CENTRAL PLANT.
10/15/2003 ELECTRIC - SERVICE RELOCATION DSANTACR Approved IVRS - Inspection 0000*/ NOTES: WILL NEED TO GIVE CLEARANCE BEFORE ENERGIZING NEW SWITCH GEAR SECTIONS. PROVIDE LETTER OF TOURQUE, GROUND FAULT TEST.
12/10/2003 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection 0000*/ 1) WEST MENS BAGGAGE RESTROOM 1212 WASTE AND VENT AIR TEST OK. WATER PIPING WATER TEST OK. UNISEX RESTROOM 1213 OK
12/29/2003 MECHANICAL - ABOVE CEILING CWILLIAM Approved IVRS - Inspection 0000*/ 4B WEST - DUCT IN SOFFIT - OK TO COVER.
12/31/2003 STEM WALL/RETAINING WALL LHANLY Approved IVRS - Inspection 0000* 1) C13 COLS LINE 23 OK, CC2 COLS LINE 27, CC2/30, 31/Z1. 2)4' DIAMETER COLS LINE 41 BEING POURED WITHOUT COT INSPECTION. (FAILURE TO GET COT APPROVAL COULD RESULT IN COSTLY DELAYS IN THE FUTURE.)
12/31/2003 EXCAVATION/LAYOUT REBAR & ZON LHANLY Approved IVRS - Inspection 0000* FOOTING TUNNEL 7 & 8 NOT READY
06/11/2004 PLUMBING - ABOVE CEILING RRICH Approved IVRS - Inspection :*/ 1) 6 SETS ROOF DRAIN AND AREA DRAINS COLUMN LINE 26-31 IN EAST BAGGAGE AREA WATER TEST OK. MECH ENGINEER LETTER FOR 3" HORIZONTAL TO VERTICAL TRANSITION ON 4" HORIZONTAL PIPING OK PER RF1 578 DATED AND STAMPED 6/01/04. WATER PIPING 2" FROM 22.1 AND Y1 GOING EAST FROM VALVE TO TERMINATION PER PLAN. FOR EAST BAGGAGE PRESSURE TEST OK
07/21/2004 ELECTRIC - ABOVE CEILING DSANTACR Approved IVRS - Inspection :SOFFITS TICKET LEVER 2ND FLOOR, NORTH ENTRY
08/24/2004 EXT METAL CLIPS/EXT SHEATHING LHANLY Approved IVRS - Inspection :*
10/15/2004 MECHANICAL - INTERMEDIATE CWILLIAM Approved IVRS - Inspection :*/SINK AREA-COPPER HEATING WATER, TO 7-4' THRU 47 VAV'S GO PSI
11/16/2004 STUCCO MESH LHANLY Approved IVRS - Inspection :ALL BUT WEST END AT WEST BARREL
11/16/2004 REINFORCED MASONRY PRE-GROUT LHANLY Approved IVRS - Inspection :*
12/17/2004 MECHANICAL - FINAL CWILLIAM Approved IVRS - Inspection :*/OK TO COVER GRID, LOWER LEVEL
12/20/2004 ELECTRIC - INTERMEDIATE DSANTACR Approved IVRS - Inspection :*/OK WALLS & ABOVE CEILINGS OFFICES AT BAGGAGE WEST BACK OFFICES & FRONT OFFICES.
12/22/2004 ELECTRIC - FINAL DSANTACR Approved IVRS - Inspection :*
1) OK T.C.O. FOR 1ST FLOOR WEST BAGGAGE AREA AND 2ND FLOOR WEST TICKET AREA
12/22/2004 BUILDING - FINAL LHANLY Approved 1) OK FOR T.C.O.
2) ALL BAGGAGE 1-8
3) ALL TERMINAL
4) EXCLUDE LINK AREA
12/22/2004 ROOF NAILING LHANLY Approved IVRS - Inspection :*
12/22/2004 BUILDING PRE-SLAB LHANLY Approved IVRS - Inspection :*
12/28/2004 FIRE SPKLR - FINAL LTHOMAS Approved
12/28/2004 FIRE SPKLR - OH PIPING & HYDRO LTHOMAS Approved
12/30/2004 SHEET ROCK NAILING LHANLY Approved IVRS - Inspection :* P LINK AREA OK TO TAPE
12/30/2004 FRAMING LHANLY Approved IVRS - Inspection :* P LINK CEILING OK
05/24/2005 ELECTRIC - CONSTRUCTION POWER DSANTACR Approved IVRS - Inspection :*
05/27/2005 FIRE - FINAL LTHOMAS Approved
05/27/2005 FIRE - HYDRANTS LTHOMAS Approved
05/27/2005 SIGN - FINAL JYBARRA Approved IVRS - Inspection :*
06/06/2005 RIGHT OF WAY - FINAL MOTERO Approved CLEAR
06/20/2005 PLUMBING - FINAL RRICH Approved IVRS - Inspection :* TURNED IN ( 3) BOILER INSPECTION REPORTS (1) H20 CHLORINAZTION REPORT ( 10) BACKFLOW CERTIFICATIONS.
06/22/2005 ENGINEERING - FINAL DROBERTS Approved OKAY FOR C OF O
06/22/2005 ENGINEERING - FINAL LHANLY Approved IVRS - Inspection :*
06/23/2005 PLUMBING - SEWER HCS CONNECT RRICH Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW