Permit: T01CM00202

Parcel: 140420740


Addresses:

7250 S TUCSON BL


Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T01CM00202

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
06/02/2005 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
05/27/2005 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
1) PLEASE CALL IN ALL INSPECTIONS FOR THURSDAY 6/2/05, HAVE PLUMBER ON SITE. PROVIDE CITY APPROVED REVISED PLAN OF BOILER AREA GAS PIPING PER 6/18/05 INSPECTION
08/12/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :FROM MANHOLE AT Y2 + 38.1 6" UPSTREAM TO 1-3", 2-4" STUBS UP FOR RAIN DRAINS AND 4" FROM AREA DRAIN IN NEW STAIRWAY AT RAC WATER TEST OK
07/08/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*/ 1) 6" RWL UNDERGROUND FROM MANHOLE AT COLUMN 38.1 TO 3-4" RISERS ENDS AT 6" EDN OF LINE CLEANOUT AND 4" RISER AT 34.1 WATER TEST OK. THIS PIPING ENDS HERE 3" RWL SHOWN IS DELETED PER RFI AT COLUMN 34
06/11/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*/ 1) FLOOR SINK AND VENT WATER TEST ROOM 101-OK. FLOOR SINK TO SUMP PUMP TANK WATER TEST ROOM 101-OK
04/23/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*/ 2" FLOOR SINK IN FIRE RISER ROOM STUBBED 6' NORTH OK ON WTR TEST.
03/10/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*/ 6" GRAVITY DRAIN FROM FORCE MAIN EAST CONCOURSE INTO NEW MANHOLE VACUUM TEST APPROVED.
03/09/2004 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*/ VACUUM TEST ON NEW MANHOLE FOR 6" EAST FORCE MAIN DISCHARGE DENIED,
03/08/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*/ WTR TEST TIE INTO 6" EXISTING 6" WEST FORCED MAIN TO 8' ABOVE FINISHED GRADE OK. WTR TEST 6" EAST FORCED MAIN TIE INTO NEW MANHOLE 10' ABOVE FINISHED GRADE OK. NEW MANHOLE TO BE VACUUM TESTED.
02/27/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*/ 1) 18" STORM DRAINS IN LIND AREA IS OK 2) AIR PRESSURE TEST IS OK 3) OK TO BACKFILL TRENCH
01/22/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*/ 4" RAIN DRAIN EXTENDED TO 108 TY, 4" RAIN DRAIN EXTENDED TO 105 TY, 4" RAIN DRAIN EXTENDED TO YT109. WTR TEST APPROVED.
01/21/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*/ 1) 10" RAIN DRAIN 12' EAST OF CENTER LINE X RUNS WEST TO B1 + 109, 6" TAP BETWEEN X + Y WITH 3-4" STUB UPS AT Y + 106, Y + 105, Y + 104, 4" TAP BETWEEN X + Y RUNS WEST STUB UPS AT Y + 108, Y+ 109 WATER TEST (APPROVED)
01/15/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*/ 4" RAIN DRAIN UNDERGROUND FROM CENTER LINE 104 AND Y TO CENTER LINE 1 PLUS Y 6" CONNECTION.
12/18/2003 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*/ 12" STORM DRAIN ORIGIN AT R-15, 10' OUTSIDE BLDG FROM C/C 26 TO C/C 31 WTR TEST UNDERGROUND APP.
11/12/2003 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*/ 1) ROUGH SOIL TO ? HEIGHT WATER TEST OK FOR MENS REST ROOM AND UNISEX RESTROOM COLUMN LINES 102, 103 AND C, B. OK TO COVER
08/11/2003 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*/1) SOIL WATER TEST IS OK. 2) P.O.C. OF NEW BLDG DRAIN IS OK. 3) THIS INSPECTION IS FOR BAGGAGE AREA WEST WOMENS RESTROOM. 4) OK FOR BACKFILL. 5) NOTE: WILL REQUIRE A REVISED AND APPROVED DRAWING ON WASTE AND VENT SYSTEM PRIOR TO FINAL INSPECTION. PLEASE RED LINE AS BUILTS.
08/07/2003 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*/ 1) LAVATORYS INSTALLED IN SETS ARE 2 FIXTURE UNITS EACH. YOU CAN ONLY DISCHARGE 8 F.U. ON A TWO INCH HORIZONTAL DRAIN. SEE SECTION: TABLE 7-3, 94 UPC.
04/18/2003 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*PLEASE HAVE APPROVED PLANS ON SITE @ A LOCATION WHERE I CAN HAVE ACCESS TO THEM.
04/01/2003 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*1.) 3" N/H TO MOP SINK AT COLUMNS 2.5 & B OK WATER TEST OK OK TO COVER.
03/10/2003 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*F.S. @ 19.5 OK.
03/07/2003 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*1.) 2" WASTE FOR FLOOR SINK @ COLUMN LINE 5-6/B-C.
2.) F.S. @ COLUMN 19.5 REQUIRES VENT 'Y' TO BE ROTATED UP 45 MIN.
3.) LAV, WC & MOP SINK FLOOR DRAIN & VENT OK 20-21.5 LINE B-2.
03/04/2003 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*GATES WERE LOCKED ON SITE.
02/25/2003 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK
2.) P.O.C. OF NEW BLDG. DRAIN TO EXSISTING BLDG. DRAIN IS OK.
3.) THIS INSPECTION IF FOR BAGGAGE LEVEL EAST RESTROOMS ONLY.
4.) WILL REQUIRE A REVISED & APPROVED PLAN.
02/21/2003 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection 0000*1.) MUST PROVIDE WATER TEST ON WASTE & VENT SYSTEM.
12/24/2002 PLUMBING - ROUGH, SOIL Partial Approval 1.) APPROVED AS NOTED ON PLAN OK TO COVER.
12/22/2002 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection 0000*NOT READY FOR INSPECTION.
12/12/2002 PLUMBING - ROUGH, SOIL Partial Approval 1.) 6" DIP UNDERGROUND WATER SERVICE W/COPPER LOOP ABOVE GRADE INCLUDING VALVE OK. TIE-IN TO C900 OK OK TO COVER PRESSURE TEST OK
2.) 3P2.12 RWL 6" & 4" UNDERGROUND OK AS NOTED ON PLAN WATER TEST OK OK TO COVER.
12/10/2002 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*3P2.12 & 3 P2.13.
1.) 6" & 8" N/H RWL UNDERGROUND, AS HIGHLIGHTED ON ABOVE PAGES OK WATER TEST OK
2.) OK TO COVER.
12/08/2002 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*3P2.13 RAIN WATER LEADER AS HIGHLIGHTED ON PLAN OK OK TO COVER.
12/04/2002 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*3P2. 14 RWL 4" 6" & 8"
1.) N/H RWL UNDERGROUND, AS HIGHLIGHTED ON PLAN OK WATER TEST OK
2.) OK TO COVER.
12/02/2002 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*
1.) 6" U.G. SEWER FROM MANHOLE @ C-5 up to C-101. 6" CAST IRON NO HUB. FCO @ 3" UB C-1.2 RELOCATED TO ABOVE 4" TIE @ C 2.2; THIS WAS APPROVED.
2.) 2" NO HUB APPROX 12' FROM 4" C.O. TO EXISTING ON COLUMN LINE 107 C1 TO SEWER MAIN APPROVED. AFTER HOURS INSPECTION.