Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T01CM00202
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/16/2004 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 09/21/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 08/30/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :*/P 1035-P-MIDSECTION LINK FOR CARPORT? WALLLS & EXTERIOR WALLS OK EAST BAEEEL? ARACH OK 01015-EAST LINK S.O.G. CLEAN OFF TOP OF RETAIN WALLS AT ESC. PIT BEFORE PLACING CONCRETE |
|
| 08/26/2004 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :WEST BARREL VAULT OK TO TAPE EAST TICKET LEVEL PROGRASS OK EAST FLYING ARCH SUB FRAME FOR SHEET METAL OK MONOKOTE HAS NOT BEEN REPAIRED IN EAST BAGGAGE AREA |
|
| 08/24/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 08/19/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 08/16/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :*/P-01015-PRE SLAB INSPECTION FOR LINK AREA NOT READY A)FINISH DOWELS IN RETAIN WALL & PROVIDE EPOXY REPORT FOR EPOXIED DOWELS B)YOU MAY POUR SLAB IF YOU SET EPOXY REPORT 01011-1)PROGRESS AREA B BAGGAGE OK (WALLS, SOTFITS,LIDS?) MONOKOTE @ BEAMS & EVLS? STILL REQUIRES REPAIR 2)MONOKOTE STILL NOT REPAIRED AREA E GAGGAGE LEVEL |
|
| 08/13/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :NOT READY @ LINK | |
| 08/12/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 08/05/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 07/29/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :*/ 1) REF. 2 3?.1 COLUMN CASES IN LINK AREA OK TO CLOSE AND POUR A) MUD HAS BEEN CLEANED OUT B) LOOSE NUTS NOW TIGHTEN C) SOME HORIZONTAL TIES ARE OUT OF PLANE AND WILL BE ADJUSTED WHEN FORM GOES ON D) VERTICAL REBAR INSTALLED TOO LONG FOR UPPER CLEARANCE IS BEING CUT AT THIS TIME | |
| 07/27/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :*PROGRESS BAGGAGE LEVEL AREA E OK E/ BAGGAGE LEVEL HARD LID FRAMING OK PRESLAB AREA E TICKET LEVEL W 1/2 OK COLUMN WRAP CIP CONNECTS OVER STEEL AREA F OK |
|
| 07/14/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SEE YESTERDAY'S NOTES | |
| 07/07/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 07/02/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 06/30/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 06/29/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :*/ AREA F TO RC LINJE X .5 2) YOU MUST PROTECT FIRE LINE FROM CONCRETE. ENGINEER HAS ASKED FOR 1 1/2" CLEAR FROM FOOTING | |
| 06/25/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :*/ 1) X 5 BETWEEN 38.1 TO 41.1 | |
| 06/22/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :*/ 1) ESCALATOR PIT FTG | |
| 06/18/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :*/ F2 AND F3 FOOTINGS AND WFI AT X2/42, 43 OK TO PLACE. | |
| 06/04/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 06/02/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* LINE X5 @ LINK TO 38.1 | |
| 06/01/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) LOWER FOOTING IN LINK REQUIRES 1 MORE VERTICAL | |
| 05/27/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :*/ 1) LINE Y2 REPAIR REAR 38.1 | |
| 05/25/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :*/ 1) WINDOW WALL FOOTING AREA A BAGGAGE | |
| 05/12/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* AREA F LINE Y2 RETAIN WALL OK TO CLOSE WEST 120' | |
| 05/11/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 05/10/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 05/05/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :*/ 1) PROGRESS ON C.F.S. PARAPETS OK 2) PROGRESS ON STRUCTUAL STEEL AREA E OK 1) LOW RETAIN AND ESC PIT OK 2) PLEASE ADD HORIZONTAL AT TOP FOR SECTION OF HIGH WALL | |
| 05/04/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 04/26/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 04/23/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTINGS IN LINK AREA OK TO POUR WHEN SPEC INSP CONFIRMS STEEL PLACEMENT | |
| 04/21/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 04/19/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 04/16/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 04/15/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* AREA E WINDOW WALL FOOTING & STEM. | |
| 04/09/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 03/18/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 03/17/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 03/16/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 03/15/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* GRADE BEAM @ TUNNEL 1 OK | |
| 03/11/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 03/09/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 03/05/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 03/03/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 02/24/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* E WALL TUNNEL 1 | |
| 02/23/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 02/19/2004 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 02/09/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* window wall footing north of tunnel 1 ok | |
| 02/04/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* 1) CLEARANCE @ BAGGAGE TUNNEL #2 OK TO COMPLETE FORMS. 2) FLOOR MAT @ BAGGAGE TUNNEL #1. 3) OK RETAINING WALL @ GRID LINE 33.1 | |
| 01/29/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 01/26/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* GRADE BEAM LINE Z1 WEST OF 108 OK TO POUR. a) PLEASE FINISH CLEANING OUT FORMS FOR PROPER CLEARANCES. | |
| 01/22/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 01/16/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* WF4 LINE X/28.5-33.1. 2) RETAIN FOOTING X-XS/LINE 33.1. 3) RETAIN FOOTING & PIER CAPS LINE 108.8 OK. | |
| 01/13/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 01/12/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*/ 1) AREA B: ESCALATOR AND ELEVATOR PIT FOOTINGS OK | |
| 01/09/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 01/09/2004 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* TUNNEL 1 FOOTING NOT READY | |
| 01/08/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* 1) slab foundation tunnel 2 a) complete inside corner bars at access pit. B) COMPLETE LONGITUDINAL REINFORCEMENT AT ACCESS PIT. OK TO POUR WHEN SPECIAL INSP CONFIRMS COMPLETION |
|
| 01/07/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* 1) PIER CAPS WEST SIDE. 2) PAD TUNNEL 7 & 8 | |
| 01/06/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* TUNNEL SLAB FOOTING 7 & 8 1) INSUFFICIENT LAP LENGHT IN SLOPED MATS BEING CORRECTED AT THIS TIME. OK TO POUR CONCRETE WHEN SPEC INSP CONFIRMS FINAL REPAIRS. 2) PIER CAPS 11 EACH IN AREA B OK TO PLACE WHEN SPEC INSP CONFIRMS RING TIES ADJUSTED TO 6" OC | |
| 01/05/2004 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* TUNNEL FOOTING 7 & 8 1) INSUFFICIENT LAP SPLICE IN SLOPED SLAB. 2) VERTS FOR PIER CAPS NOT PLACED. 3) CLEAN OUT FOOTING FOR PROPER CLEARANCE. | |
| 12/31/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* FOOTING TUNNEL 7 & 8 NOT READY | |
| 12/26/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 12/23/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* NEED CLAIRIFICATION ON DIFFERANCE IN DETAILS 1E/355.2 AND 10/358.4, DO SLAB DOWELS ST.11 GO INTO SLAB? OR DO THEY CONTINUE UP INTO COLS? WHAT DETAIL APPLIES TO 33.1/X AND 33.1/Z1 COLS? | |
| 12/18/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* ELEVATOR #2 FOOTING OK. | |
| 12/15/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* 1) PIER CAPS 26-31/X, X2, Y1 ALSO Z1/26, Z1/30, Z1/31, Z1/33.1, Y2/33.1. 2) FOOTINGS FOR PONY WALL PER RFI 469 BEING ADDED LINE Z1 | |
| 12/12/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* 8 EACH PIER CAPS LINES X.1 & Y.1 | |
| 12/11/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* PIER CAPS LINE Y.1 CAP X.1 MAKE MINOR REPAIRS AS NOTED. OK TO POUR WHEN SPEC INSP CONFIRMS. | |
| 12/10/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* 1) PARTIAL Y1-31.1 A) REFERANCE 4/355.2 SHAFT CAP STEEL HORIZONTAL BARS SHOULD BE INSIDE THE HOOKED VERTICAL BARS. B) #4 RING TIES @ CASSON CAPS TO BE SPREAD OUT 6" OC. C) CLEAN OUT DIRT @ BOTTOM OF FORM FOR 3" CLEARANCE. | |
| 12/08/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* INSP CAGES & CAISSONS AREA X-2/22-31 OK TO POUR AS MARKED @ SITE | |
| 12/04/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* 1) Y1-30, Y1-29, OK TO POUR2) Z1-31, Z1-30, Z1-29, Z1-28, Z1-27, Z1-26 CAGES & HOLES OK | |
| 12/03/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* CASSONS Y.1/31, Z1/31, Z1/33.1 | |
| 12/02/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* CASSONS X29, X30, X31, X5 ON 33.1 & 2 ON 33.1 OK TO POUR. | |
| 11/20/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 11/17/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* MAT @ TUNNEL #2 AREA B | |
| 11/05/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* 1) FOOTING CONST SIDE BAGGAGE 2 OK ( AFTER MINOR ADJUSTMENT) 2) GRADE BEAM REPAIR @ TUNNEL 7 OK | |
| 10/30/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*/ TUNNEL 7,8 WALK - BAGGAGE SIDE. | |
| 10/23/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* MAT FOOTING ON BAGGAGE SIDE TUNNEL 7,8 | |
| 08/14/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 05/28/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*/ 1) BASE CAPS AT FLYING ARCHES OK | |
| 05/23/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*/ 1) TURN DOWN AT LEAK AREA | |
| 05/05/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*12' AFF @ NEW MECH ROOM. | |
| 05/01/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 04/23/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*SLAB @ MECH YARD. | |
| 04/21/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 04/18/2003 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000*COULD NOT CONTACT GRADY OR ARMANDO FOR ACCESS. | |
| 04/17/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 04/15/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*STEM WALLS @ MECH ENCLOSURE 112-113/A1 | |
| 04/11/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*MECH YARD FOOTINGS 21-B1 112-113. | |
| 04/10/2003 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection 0999*MET RICK NOWAK @ SITE MULTIPLE PROBLEMS CONTRACTOR WILL NEED TO RECALL. | |
| 04/08/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*LINE A.5/31-35 PER RFI 178. 1.) ASK RICK NOWAK ABOUT STAGGERING LAP SPLICE IN CONTINUOUS FOOTER. |
|
| 04/04/2003 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000*RESCHEDULED FOR 4-4. | |
| 04/03/2003 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 02/19/2003 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | ||
| 01/24/2003 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 01/13/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*COL. REPAIR/REINFORCEMENT @ A1,A2,A3,A4, PER RFI. | |
| 12/27/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 12/17/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*WINDOW WALL FOOTING LINE X 3-7. | |
| 12/13/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 12/11/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*WINDOW WALL FOOTING LINE X/17.5-21. | |
| 12/10/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 12/04/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 12/03/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*SLABSON GRADE A-C.17.5 - 19.5 A.5.C/16-16S; A-C/8-9 | |
| 11/26/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*FOOTING & STEM A21-A21.5. | |
| 11/21/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.) PIER CAP @ Z16 CAGE OK VERTICALS NOT COMPLETE OK TO POUR ONLY IF SPECIAL INSP. RICK NOWAK CONFIRMS COMPLETION. 2.) ESCALATOR PIT @ Y 20 HAD SLAB DOWELS PER 18/535.3 MISSING. DOWELS INSTALLED WHILE @ SITE OK TO POUR. 3.) GRADE BEAM LINE 4 A-B NEED MINOR CORRECTION ADD RING TIES @4 B PER 355.8. TIRES BEING ADDED DURING INSPECTION. OK TO POUR. |
|
| 11/20/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*COLS TO TICKET LEVEL 21.9, X 20,X 18,Y18,Y22,Z22,Z20,Z18. | |
| 11/19/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 11/18/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.) #9 HAIR PINS NOT INSTALLED @ B7 PER DETAIL 9/535.8. DOUBLE #7S APPROVED PER VERBAL WITH ENGINEER WARREN WHITE. 2.) GRADE BEAM ON GRID 6/AB AND B/6-7 OK TO POUR. 3.) GRADE BEAMS LINE A2-3 COMPLETE EXCEPT FOR #9 VERTS IN SHEAR WALL. OK TO POUR IF APPROVED BY SPECIAL INSPECTOR THIS PM. 3.) GRADE BEAM LINE 2 A-B NOT QUITE FINISHED OK TO POUR IF SPECIAL INSPECTOR APPROVES THIS PM. CURRENTLY MISSING #7 HAIR PINS PER 6/355.8. |
|
| 11/15/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*SHEARWALL LINE A 6-7 NOTE: MECH OPENING PER 5/355.6 @ SHEAR A 20/21 DELETED. | |
| 11/14/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.) Z20 PIERCAP & COL REPAIR (RFI) 7/535.2 2.) GRADE BEAM 1/A-B. 3.) PIERCAP PER RFI 49 @ X 1 4.) GRADE BEAM LINE 5/A-B. |
|
| 11/13/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000*CANCELLED PER ARMANDO | |
| 11/12/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 11/08/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*PIER CAPS X 20,X 18, X5,X3 1.) PIERCAP @ X 22 PER REVISION FRI 049. PARTIAL 2 GRADE BEAM 6 PER 1/535.10. | |
| 11/07/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 11/06/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000*CANCELLED PER CONRAD FROM SUNDT. | |
| 11/05/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 11/01/2002 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection 0999*RESCHEDULE FOR 11/1/02 /ESCALATOR PIT NOT PER DETAILS IE 4 1/2 DROP & CENT VERTICALS @ CAISSION | |
| 10/31/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 10/25/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 10/23/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*PARTIAL 1. TUNNEL 4 LINE 7.5/A-B5 LINE 6-8 EXCLUDING 8 PERICAP 27. | |
| 10/14/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.) FOUNDATION TUNNEL 5 & 6 OK 2.) RAISAGE TOP MAT TO 2" BEFORE POUR. 3.) CRAWL SPACE BETWEEN TUNNELS 5 & 6 TO BE ELIMINATED THEREFORE WALLS CHANGED PER RF167 TO SAMPLE WALLS. ALSO DELETING ACCESS PITS GRIDLINE A EXCEPT @ TUNNEL 4,7,8. | |
| 09/11/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*Y3,Y7,Y1,Y5,Y11.5. OK. | |
| 09/09/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.) REBAR FOR CASSIONS 22,18,16,11.5,7,5,3,1 | |
| 09/05/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*TUNNEL LIDS PER 359.2. @ 3 & 4 SOUTH END. | |
| 08/29/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*SLAB OK SOUTH 30' AROUND TUNNELS 3 & 4. 1.) NOTE ENGINEERED DETAIL PROVIDED BY H& W FOR REPLACEMENT OF 7535.12. AT OPEN P.T. ARE | |
| 08/20/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000*CANCELLED BY CONTRACTOR/WALL OUT OF PLACE | |
| 08/15/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.) TUNNEL 4 WALLS S.E.W. APPROVED TO POUR. 2.) TERRACO NOTED 3 KPI AS REQUIRED CONCRETE FOR TUNNEL 3 SAMPLE. 4 KPSI IS REQUIRED PER GSN PAGE 350.1. 7 DAYS BREAK @ 3270, REVIEWED BY H M& W. AND SHOULD BE OK @ 28 DAYS. | |
| 08/14/2002 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection 0999*1. PER RFI 002 TUNNEL 6 HAS BEEN RECONFIGURED TO GO STRAIGHT THROUGH BETWEEN GRID 19 & 20. 2.) PLEASE MAINTAIN CLEARANCE AS DISCUSSED AND CLEAR DEBRIS FROM FOOTING BEFORE YOU CALL FOR INSPECTION. | |
| 08/13/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 08/09/2002 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection 0999* | |
| 08/09/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 08/06/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*FOOTINGS @ TUNNEL 4 & 5. | |
| 08/01/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | FOOTING @ TUNNEL 3 @ 3C BY SHAFT EPOXY DOWELLING PER DETAIL 8 OR 355.1 APPROVED AT THIS LOCATION. ALL SPECIAL INSPECTIONS REQUIRE FIELD INSPECTOR TO LEAVE FIELD REPORTS AFTER EACH INSPECTION. | |
| 07/31/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*CANCELLED BY CONTRACTOR | |
| 07/30/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* |