Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING ABOVE CEILING
Permit Number - T01CM00202
Inspection Description - BUILDING ABOVE CEILING
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/18/2005 | BUILDING ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 01/10/2005 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :*PROGRESS @ LINK OK | |
| 12/17/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 12/14/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :*REPAIR MONOKOTE ABOVE HARD LID AT EAST END OF LINK. | |
| 12/03/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 12/01/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :*/OK TO ROCK CEILINGS (HARD LILDS) IN WEST BAGGAGE | |
| 11/10/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 11/08/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 11/01/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :*/WEST FLYING ARCH READY FOR UNDERSIDE SHEATHING | |
| 10/20/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 10/19/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :*/ 1) OK TO ROCK HARD LIDS AND SOFFITS WEST SIDE BAGGAGE 2) OK TO START ROCKING AT EAST END OF WEST TICKET LEVEL SOFFIT AND HARD LID | |
| 10/14/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :*/OK TO COVER SOFFITS WEST BAGGAGE LEVEL | |
| 10/07/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :* WEST BAGGAGE AL PROGRESS OK. WEST TICKET SOFFIT SOUTH WALL & SUSPENDED ? @ EAST FRAME FOR LID UNDER FLY? ARCH OK | |
| 10/01/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :*PARTIAL APPROVAL. PROGRESS AT WEST TICKET LEVEL FLYING ARCHES OK. | |
| 09/24/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :*/FIREPROOFING OF ROOF DECK @ LINK OK | |
| 09/21/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :*PARTIAL APPROVAL. OK TO PLACE TILE EAST END. | |
| 09/17/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 08/26/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 08/19/2004 | BUILDING ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* PATCH MONOKOTE | |
| 08/17/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :*/PARTIAL1)WEST (AREA B) TICKET LEVEL; MONOKOTE OK IN NEW AREARS. SOME REPAIR REQUIRED IN EXISTING AREAS 2)WEST BARREL ARCH PROGRESS OK, RECALL WHEN LAST 10 JOISTS ARE IN. 4)EAST BAGGAGE AREA STILL REQUIRES MONOKOTE REPAIR 5)OK TO TAPE ROCKED AREAS | |
| 08/10/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 07/21/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 07/02/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :*/ 1) FIRE PROOFING TOP AT WEST BARREL VAULT OK | |
| 06/21/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 06/16/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :*/ 1) CFS FRAMING AT EAST BARREL ARCH CEILING OK TO COVER | |
| 06/04/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :* OK TO COVER SOFFITS EAST & BAGGAGE. | |
| 06/02/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :* MONOKOTS AREA E | |
| 05/21/2004 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection :*/ 1) HARD LIDS AND SOFFITS AREA E 5 1/2 BAGGAGE 2) OK TO START ROCKING | |
| 05/17/2004 | BUILDING ABOVE CEILING | Partial Approval | SUSPENDED CEILING BAGGAGE LEVEL E AT DELTA OK 2) SUSPENDED CEILING BAGGAGE LEVEL E AT S.E. CORNER OK | |
| 09/24/2003 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection 0000* | |
| 09/17/2003 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*/1) ACCOUSTIC CEILING FOR THIS PHASE IS COMPLETE ON TICKET AND BAGGAGE LEVELS. 2) CORRUGATED STEEL UNDER CANOPY COMPLETE ONEAST 1/2. | |
| 09/15/2003 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection 0000* 1) CANOPY AREA AT TICKET LEVEL COMPLETE AND OK TO COVER. 2) WEST 1/2 TICKET LEVEL COMPLETE. 3) EAST 1/2 BAGGAGE LEVEL REQUIRES MINOR ADJUSTMENTS. a) GRID WIRE THAT SLOPES MORE THAN 1 IN 6 REQUIRES COUNTER SLOPE WIRE. b) PLEASE DO NOT USE GRID WIRES TO SUPPORT ELECTRIC OR DATA CABLES. USE SEPARATE HANGERS. c) FINISH REMOVING TEMPORY LIGHTING. d) OK TO INSTALL TILES. | |
| 09/12/2003 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection 0000* BAGGAGE AREA FROM ESCALATOR WEST | |
| 09/10/2003 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection 0000* OK IN CORRIDORS & OFFICES. LEAVE OUT TILES IN ROOMS NOT APPROVED ON 01045 SHEET ROCK | |
| 05/28/2003 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection 0000*/ 1) SPRAY ON FIRE PROOFING WEST BARREL ARCH AREA | |
| 12/24/2002 | BUILDING ABOVE CEILING | Partial Approval | IVRS - Inspection 0000* 1.) CAFCO SPRAY ON FIREPROOFING APPLIED TO STRUCTURAL STEEL @ A-B/1-7 TO DEPTH OF 1 1/2". |